Resolved
That the report be noted.
Development Control Committee noted this item on Monday 16 August 2021. Below is the council's own wording, with the papers it was decided on.
Resolved
That the report be noted.
16th AUGUST 2021
HPBC DEVELOPMENT CONTROL COMMITTEE
UPDATE SHEET
HPK/2021/0206 -182 Market Street, Chapel-en-le-Frith
No updates
HPK/2020/0352 – Buckingham Hotel, Burlington Road, Buxton
County Archaeology
We do not consider that it will have any archaeological implications and we would not wish to comment further on the scheme.
County Highways
I note the HA did not formally raise objection in principle to the earlier HPK/2018/0620 application, although I note reason 3 on the subsequent refusal notice cited a highways based reason on the level of off street parking (and consequential impact on the safe operation of the highway).
Subsequent information submitted in connection with the current application (HPK/2020/0352) includes a Parking Justification Note – dated 06/07/2020 – this demonstrates that an acceptable level of on-site parking will be available for guests and staff, based on projected occupancy rates, and also confirms that season permits for the nearby public car park will be purchased to offset any maximum demand (which, according to the note, could be 3 No spaces at absolute maximum occupancy rates).
The Parking Justification Note is detailed and the Highway Authority would not be in a position to challenge the summary or conclusion, or support / sustain a reason for refusal on highway safety grounds. However, it is appreciated your Authority may have its own views on parking provision, in line with your Authority’s Local Plan requirements.
It is likely that the previously provided highway related condition and notes (associated with application reference 2018/0620) are still relevant
LLFA (Lead Local Flood Authority)
The LLFA has no objection subject to the conditions below. o Submission, approval and implementation of a a detailed design and associated management and maintenance plan of the surface water drainage for the site, o No development shall take place until a detailed assessment has been provided to and approved in writing by the Local Planning Authority, to demonstrate that the proposed destination for surface water accords with the drainage hierarchy as set out in paragraph 80 reference ID: 7- 080-20150323 of the planning practice guidance.” o the applicant shall submit for approval to the LPA details indicating how additional surface water run-off from the site will be avoided during the construction phase. The applicant may be required to provide collection, balancing and/or settlement systems for these flows. The approved system shall be operating to the satisfaction of the LPA, before the commencement of any works, which would lead to increased surface water run-off from site during the construction phase.” o Submission of a verification report carried out by a qualified drainage engineer must be submitted to and approved by the Local Planning Authority. This must demonstrate that the drainage system has been constructed as per the agreed scheme (or detail any minor variations), provide the details of any management company and state the national grid reference of any key drainage elements (surface water attenuation devices/areas, flow restriction devices and outfalls).
A number of additional informatives are also recommended in the event of approval
Groundwater
In the officer report it is said that the application site is out with the Environmental Agency (EA) Source Protection Zone (SPZ). This was the case when the application was first made (and consulted upon) but the EA have recently (in January/Feb this year) extended the SPZ in that area to a sub-surface SPZ i.e. the EA would only have interest in applications with excavations.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Update SheetReport | 325 KB | DownloadRead as text |
Follow Development Control Committee at High Peak and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Aug 2026 | Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. | Approved | Open |
| 10 Aug 2026 | Update SheetThat the update sheet be noted. | Noted | Open |
| 10 Aug 2026 | Planning ApplicationsThat the report be noted. | Noted | Open |
| 10 Aug 2026 | HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... | Approved | Open |
| 10 Aug 2026 | HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.