That the applications be approved as set out in the report; 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
16th August 2021
Application HPK/2021/0237 & HPK/2021/0238 (Listed building consent No: application) Location The Pump Room, The Crescent, Buxton, SK17 6BQ Proposal HPK/2021/0237 – Removal of modern skylight and replacement with zinc roof aluminium clad plant enclosure housing new fans (and associated ducts etc) to provide increased ventilation to the Pump Room HPK/2021/0237- Listed Building Consent for Removal of modern skylight and replacement with zinc roof aluminium clad plant enclosure housing new fans (and associated ducts etc) to provide increased ventilation to the Pump Room Applicant Buxton Crescent Ltd Agent [name removed]/Parish Buxton Central Date registered 12.05.2021 If you have a question about this report please contact: Faye Plant, [email protected] 01538 395400 ext. 4995
1. REFERRAL
The application is referred to the Development Control Committee due to HPBC interests in the site.
SUMMARY OF RECOMMENDATION
APPROVE subject to conditions
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The Grade II Pump Room was designed by Henry Curry for the 7th Duke of Devonshire in 1894 and was built to alleviate overcrowding at the previous well in the Natural Baths. The building became the focal point for the source of the thermal spring water in the early 20th century and it was last used to “take the waters” in the 1970s. With the exception of the enclosure of the arcade to the front and the later removal of the two domes, the building has largely remained unaltered.
2.2The building has been in use as a Micrarium until 1994, following which it was a temporary summertime only art gallery. At this time the building suffered extensive water ingress. A series of internal and external refurbishment works began in 2012 and the building has been restored as part of the recent Crescent renovation and is now managed by the Buxton Crescent Heritage Trust. Since March 2019 the building has been in use as Buxton Visitor Centre.
1 3. DESCRIPTION OF THE PROPOSAL
3.1At the rear of the Pump room is a flat roof section of building that sits directly above the pool. There has been a skylight within the flat roof since at least 1912. The current flat designed skylight was given consent and installed in 2015/2016.
3.2Naturally occurring gases percolate through the water which can be seen when looking into the oval pool within the Pump Room. Ventilation issues have proved so significant that it is necessary to remove the modern skylight and replace with a mechanically assisted means of ventilation.
3.3Planning and Listed Building Consent is sought to replace the modern skylight with a lantern style zinc roofed aluminium clad plant enclosure which will house new fans and their associated ducts etc that will increase the ventilation to the Pump Room. The fans will increase the air flow through the Pump Room to manage Radon levels and improve the heating of the historic fabric thus reducing the occurrence of damp. The scheme has been developed with expert advice and with input on other key stakeholders such as Historic England, National Lottery Heritage Fund.
3.4The modern flat glazed roof light will be removed and replaced by a 2.2m x 2.4m enclosure that will replicate the shape and stlye of the skylight on the building in the early 20th century. The enclosure will sit below the bottle balustrade and will be finished in zinc and coated aluminium finished in dark grey all to match the existing zinc flashings.
3.5Revised plans and additional information was received during the course of the application which centrally aligned the louvre on the eastern elevation and clarified the noise output of the fans to 44dB, equal to the ‘noise of normal living; talking, or radio in the background’. The fans will run on a trickle basis with an increase in speed for occasions when radon levels run higher.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.