CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Development Control Committee, Monday 14 February 2022 at 1.30pm

HPK/2021/0478 - Unit 24 Harpur Hill Business Park, Harpur Hill, Buxton, SK17 9JL

Approved Planning 1 paper

Development Control Committee approved this item on Monday 14 February 2022. Below is the council's own wording, with the papers it was decided on.

Item22/77

Resolved

That the application be approved as set out in the report; 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE

Date 14th February 2022

Application HPK/2021/0478 No: Location Unit 24 Harpur Hill Business Park, Harpur Hill, Buxton, SK17 9JL Proposal Construction of 2 storey office area to side elevation and large rear warehouse and loading area to the rear. Applicant [name removed], S K Distribution, c/o agent Agent [name removed], Espee Design & Development Ltd, Poplar Avenue, Wilmslow, Cheshire, SK9 6LN Parish/ward Cote Heath Date registered 24/08/2021 If you have a question about this report please contact: Tom Hiles-Email [email protected] Tel: 01538 395400 Ext: 5430; Mob: [phone removed]

REFERRAL

The application is referred to committee as it is a major development.

1. SUMMARY OF RECOMMENDATION

APPROVAL - Subject to conditions

2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS

2.1The site is an existing industrial unit at Harpur Hill Business Park in the Harpur Hill area to the south of Buxton. The existing site comprises a two-storey warehouse building with a lorry parking and loading area at the front, accessed off a service road. There are storage areas and staff parking to the side and rear of the warehouse. The open area of the site at the front is tarmacked and the side and rears comprise a concrete apron and compacted gravel. The site is enclosed by a palisade fencing and hedging.

2.2The site is currently occupied by a distribution company.

2.3The application site is generally surrounded by buildings of generally similar utilitarian appearance in use for similar business purposes.

2.4The site is outside any built-up area boundary and is therefore within the countryside for planning policy purposes, but is also within a designated primary employment zone. The site is in the landscape character area designated as Limestone Moorland. 2.5. A green corridor running through the business park and carrying a public right of way forms the northern boundary of the site. The corridor is designated as a Wildlife Site (“Harpur Hill Disused Railway #1 West”) in the Local Plan. The corridor comprises the route of the former Cromford and High Peak Railway, which is recorded on the Historic Environment Record and is considered to be non-designated heritage asset.

2.6The site is located in a former landfill area and is located within a 250m landfill buffer.

3. DESCRIPTION OF THE PROPOSAL

3.1The proposal is to extend the existing building to the side and rear.

3.2An extension providing additional warehouse space would be formed at the rear of the existing building, replacing an existing single-storey rear extension and occupying almost the entire space to the rear of the building. The building would also be extended at the side to provide office space, likewise infilling most the available space to the side of the building. The extensions would be clad in profile steel sheeting to match the existing warehouse.

3.3The warehouse extension would be accessed by lorries through the full-height doors at the existing front elevation.

3.4The office extension would comprise a reception, offices and staff room at ground floor, and offices and a kitchen at first floor. These would be served by windows at front and side elevations.

3.5Displaced staff parking from the rear of the site would be substituted around the sides of the front yard.

3.6The application is accompanied by the following plans and documents;

 Site Location Plan  Existing and Proposed Site Plans  Existing and Proposed Parking Plans  Existing Floor Plans and Elevations  Proposed Floor Plans and Elevations  Flood Risk Assessment  Travel Plan

3.7The application and details attached to it - including the plans, supporting documents, representations and responses from consultees - can be found on the Council’s website at:-

http://planning.highpeak.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=2497 10 4. RELEVANT PLANNING HISTORY

HPK/2016/0093 - Proposed New Portal Covered Canopy. Approved, 07/06/2016

HPK/2006/0948 - Retention As Distribution Unit. Approved, 09/02/2007

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
HPK/2021/0478: Unit 24 Harpur Hill Business Park, Harpur Hill, Buxton, SK17 9JLReport 383 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 22 attended
RM
Councillor Robert McKeownChair, present
DL
Councillor David LomaxVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
LD
Councillor Lance DowsonCommittee Member, apologies, sent representative
CF
Councillor Charlotte FarrellCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
AM
Councillor Anthony McKeownCommittee Member, present as substitute
GO
Councillor Graham OakleyCommittee Member, present
JP
Councillor Jim PerkinsCommittee Member, present
PR
Councillor Peter RobertsCommittee Member, present
ET
Councillor Emily ThraneCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present

All 22 on the meeting page

On this subject at High Peak

Search all
  1. HPK/2021/0478 - Unit 24 Harpur Hill Business Park, Harpur Hill, Buxton, SK17 9JLThis decision
  2. HPK/2024/0481 - Glossopdale Community College, Lower Site, Talbot Road, GlossopRefused
  3. HPK/2025/0206 - Glossop Community Sports Hub, Cemetery RoadApproved
  4. HPK/2023/0352 - Unit 11, Diamond Hill, Harpur Hill Business Park, Harpur Hill, Buxton, Derbyshire SK17 9USApproved
  5. HPK/2022/0344 - Glossopdale Community College Lower Site, Talbot Road, Glossop, Derbyshire, SK13 7DRRefused
  6. HPK/2021/0707 - Land adjacent to Unit 18, Tongue Lane Industrial Estate, Dew Pond Lane, Fairfield, BuxtonApproved

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies