Resolved
That the report be noted.
Development Control Committee noted this item on Monday 7 March 2022. Below is the council's own wording, with the papers it was decided on.
Resolved
That the report be noted.
[name removed] Clerk Whaley Bridge Town Council Mechanics Institute Market Street Whaley Bridge SK23 7AA
3rd March 2022
TODDBROOK RESERVOIR – CONCERNS OF RESIDENTS
Dear Andrew,
The Trust recognises that members of the local community have concerns regarding our proposals to restore the reservoir, given the severity of the 2019 incident and the disruption it caused to residents of Whaley Bridge.
The investigation and design of all necessary works to restore the reservoir to safe operational condition have been done by specialist engineering consultants, employed by the Trust. This has encompassed thorough geotechnical investigations as well as geophysical surveys. The relevant investigation and design process has been overseen by an expert independent Qualified Civil Engineer (QCE), who is appointed by the Secretary of State to the (All Reservoirs) panel of engineers established under the Reservoirs Act 1975. The QCE will continue to oversee any further design and construction work to ensure the restoration of Toddbrook Reservoir complies with our statutory requirement to manage the asset in the interest of public safety. Ultimately, the reservoir would not be refilled unless it was absolutely safe to do so.
The Trust is aware of the reports compiled by a local resident that you have referred to. Indeed, the independent QCE overseeing this project has spoken with the author of the report to discuss the QCE’s role in the project, in light of their comments. The QCE remains satisfied with the proposals set out in the planning application and that they comply with our statutory obligation to manage the asset in the interest of public safety.
Our team has reviewed all public comments submitted on the planning application, some of which overlap with the concerns you have raised. In order to demonstrate how these comments have been considered, we prepared a response to these concerns, which has been published on the relevant planning application page on High Peak Borough Council’s website. In particular the legal framework for reservoir safety and sequencing of the construction works have been addressed here, as well as being included in this letter below.
Legal Framework to Ensure Reservoir Safety
The dam and reservoir are subject to the Reservoirs Act 1975, which provides the legal framework to ensure its safety. The Environment Agency is the regulator for the Reservoirs Act. Safety works required under the Reservoirs Act may separately require planning permission (and indeed any other consents that may be needed) as is the case here, but the safety aspects of the design and works are governed by the Act.
Canal & River Trust, National Waterways Museum, Ellesmere Port, South Pier Road, Ellesmere Port, Cheshire, CH65 4FW T 0303 040 4040 E [email removed] www.canalrivertrust.org.uk Patron: H.R.H. The Prince of Wales. Canal & River Trust, a charitable company limited by guarantee registered in England and Wales with company number 7807276 and registered charity number 1146792, registered office address First Floor North, Station House, 500 Elder Gate, Milton Keynes MK9 1BB Following the incident in August 2019, the dam and reservoir were inspected under Section 10 of the Act and a report prepared which contained recommendations to ensure the safety of the dam. The inspection and report were made by the QCE, who is appointed for such purposes. The inspection considered all aspects of the dam and reservoir, and it included a number of recommendations, not just the replacement spillway, which is the primary subject of the planning application. The planning application Design and Access Statement includes a confirmatory statement by the QCE accepting the design of the proposed spillway system.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
CRT response to WB Town Council Letter 03.03.22 /80Report | 114 KB | DownloadRead as text |
PDF |
Map of Yew Tree Lodge in relation to proposed Lorry Route and Construction Infrastructure /80Report | 952 KB | Download |
PDF |
Mr Graham Aldred further comments 04.03.22 redacted /80Report | 583 KB | Download |
PDF |
Update SheetReport | 312 KB | Download |
PDF |
Whaley Bridge TC letter to CRT 02.03.22 /80Report | 771 KB | Download |
Follow Development Control Committee at High Peak and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Aug 2026 | Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. | Approved | Open |
| 10 Aug 2026 | Update SheetThat the update sheet be noted. | Noted | Open |
| 10 Aug 2026 | Planning ApplicationsThat the report be noted. | Noted | Open |
| 10 Aug 2026 | HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... | Approved | Open |
| 10 Aug 2026 | HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.