That authority be delegated to the Head of Development Services, in consultation with the Chair, to approve the application subject to: a. Updated comments from the LLFA in light of the amendments to the scheme and the Flood Risk Assessment addendum; b. The conditions as set out in the report; and c. The amended conditions as set out in the update sheet; 2. That in the event of any changes being needed to the wording of the committee’s decision (such as to delete, vary or add conditions / informatives / planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 7th March 2022
Application HPK/2021/0607 No: Location Toddbrook Reservoir Reservoir Road Whaley Bridge Proposal Planning permission for the construction of a replacement spillway and associated dam infrastructure, replacement sailing club facilities including new access, replacement play equipment and park landscaping. Applicant Nick Wild, Canal and River Trust Agent None Parish/ward Whaley Bridge Date registered 22nd October 2021 If you have a question about this report please contact: Tom Hiles, Tel. 01298 28400 extension 5430, [email protected]
1. SUMMARY OF RECOMMENDATION
Approve, subject to advice from the Environment Agency
2. REASON FOR COMMITTEE DETERMINATION
2.1This application has been brought before the Development Control Committee because it is major development and because of the public interest.
3. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
3.1The application site relates to an area of Toddbrook Reservoir and its dam, as well as land and buildings in use by Toddbrook Sailing Club, and parts of Memorial Park (including part of the playing fields to the south of the reservoir), located adjacent to east and south of the existing dam and spillway. The application site lies to the west of the centre of Whaley Bridge.
3.2A residential property (Todd Brook Cottage) located between the Sailing Club and Reservoir Road is surrounded on all sides by the application site boundary but is outside the application site.
1 The reservoir and dam
3.3Toddbrook Reservoir is a feeder reservoir for the Peak Forest Canal. The reservoir is fed by the Todd Brook at the west end of the reservoir. Some of the water runs into a bywash channel running along the northern bank of the reservoir.
3.4The dam is an earth dam with a clay core. The dam area of the site includes two spillway structures, which allow for flood waters to be discharged into the River Goyt within the park, instead of overtopping the dam. The dam was completed in 1840.
3.5The dam also includes two outlet pipes which run underground through the park and which supply water to the canal.
3.6The original spillway runs around the northern end of the dam. The auxiliary spillway is the concrete surface on the rear face of the dam, and was added in 1970 to increase overflow capacity.
3.7The original spillway supplies water into Millbrook Pond, located to the east side of Reservoir Road, through a culvert under the road.
3.8Repair works undertaken in 1970 included the construction of a new concrete spillway across part of the east face of the dam. When in use, this auxiliary spillway flows into the original spillway channel near to the point at which it outflows into the River Goyt.
3.9As members will be aware, the concrete spillway suffered a failure in August 2019 during a period of heavy rain and flow over the spillway. Emergency measures were undertaken by the Canal and River Trust.
3.10The reservoir is currently being drained and kept at a lower level via a temporary arrangement of pumped pipes running across the south bank of the reservoir and the rear face of the damn, discharging into the original spillway channel near to the river. The height of the dam crest was also raised and inflow to the reservoir has been reduced.
Toddbrook Sailing Club
3.11The existing sailing club comprises a club house building, open-air boat storage yard and a car-parking area adjacent to the channel used by members and the public, and a slipway to the reservoir at a point near its the north-east corner.
3.12The section of the park within the application site boundary comprises a grassed area with a number of mature trees, various items of play equipment, and a footpath running from Reservoir Road, past the play area and further into the park. There is informal access from the park to the sailing club car park across the bottom of the dam. This part of the
2 park is enclosed at its north side by a relatively recent development of houses on the south of Reservoir Road.
Memorial Park
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.