CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Development Control Committee, Monday 13 February 2023 at 1.30pm

Update Sheet

Noted Planning 1 paper

Development Control Committee noted this item on Monday 13 February 2023. Below is the council's own wording, with the papers it was decided on.

Item23/72

Resolved

That the update sheet be noted.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

13th February 2023

HPBC DEVELOPMENT CONTROL COMMITTEE

UPDATES SHEET

HPK/2022/0350 - Land adjacent to New Mills Football Club.

Officer: The applicant has withdrawn the planning application.

HPK/2022/0317 Eastern Mill Glossop

Viability and Developer Contributions

Further advice has been received from the Council’s viability advisor in relation to the marginal profit which the application scheme is expected to yield, reflecting changes to interest rates charged on developer financing, and increased build costs.

On the basis of this advice it is accepted that either a maximum of two affordable units could be secured on-site as part of the development, or a maximum of £100,102 could be secured as developer contributions, whilst ensuring the scheme would remain viable.

This sum would not be sufficient to secure all of the requested sums (which were towards improvements to schools, health services, parks and open spaces, and off-site tree replacement planting).

The sum would be instead be sufficient to the entire sum required for off-site tree planting (£15,480) with the remainder of £84,622 sufficient to pay most of the sums requested to pay for improvements to parks and open space.

It is therefore recommended that approval be subject to a section 106 agreement to secure payment of these sums.

Drainage and Flood Risk Finalised comments from the Lead Local Flood Authority officer at Derbyshire County Council have been received following clarification about the status of a disused outflow channel from the defunct millpond, as follows:

Derbyshire County Council as the Lead Local Flood Authority (LLFA) has reviewed the information submitted for this application, which was received on 14 July 2022, with additional information received in January and February 2023. The LLFA has no objection subject to the conditions below.

To ensure adherence to National Planning Policy Framework, DEFRAs Non-statutory technical standards for sustainable drainage systems and local guidance, these recommended conditions should not be altered without consulting the County Council Flood Risk Management team.

1. “No development shall take place until a detailed design and associated management and maintenance plan of the surface water drainage for the site, in accordance with the principles outlined within: a. Elluc Projects. (01.07.2022) Drainage Strategy, ELL-21023-WH-L-2000 & Elluc Projects. (06.07.2022) Flood Risk Assessment, ELLUC-RH-21023-FRA-F4, including any subsequent amendments or updates to those documents as approved by the Flood Risk Management Team b. And DEFRA’s Non-statutory technical standards for sustainable drainage systems (March 2015), have been submitted to and approved in writing by the Local Planning Authority.”

Reason: To ensure that the proposed development does not increase flood risk and that the principles of sustainable drainage are incorporated into this proposal, and sufficient detail of the construction, operation and maintenance/management of the sustainable drainage systems are provided to the Local Planning Authority, in advance of full planning consent being granted.

2. “Prior to commencement of the development, the applicant shall submit for approval to the LPA details indicating how additional surface water run-off from the site will be avoided during the construction phase. The applicant may be required to provide collection, balancing and/or settlement systems for these flows. The approved system shall be operating to the satisfaction of the LPA, before the commencement of any works, which would lead to increased surface water run-off from site during the construction phase.”

Reason: To ensure surface water is managed appropriately during the construction phase of the development, so as not to increase the flood risk to adjacent land/properties or occupied properties within the development.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Update SheetReport 302 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

11 of 21 attended
RM
Councillor Robert McKeownChair, present
DL
Councillor David LomaxVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
LD
Councillor Lance DowsonCommittee Member, apologies
CF
Councillor Charlotte FarrellCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
GO
Councillor Graham OakleyCommittee Member, present
JP
Councillor Jim PerkinsCommittee Member, present
PR
Councillor Peter RobertsCommittee Member, present
ET
Councillor Emily ThraneCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present
SY
Councillor Stewart YoungCommittee Member, present

All 21 on the meeting page

On this subject at High Peak

Search all
  1. Update SheetThis decision
  2. Update SheetNoted
  3. Update SheetNoted
  4. Update SheetNoted
  5. Update SheetNoted
  6. Update SheetNoted

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies