CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Development Control Committee, Monday 13 February 2023 at 1.30pm

HPK/2022/0317 - Eastern Mill, Milltown, Glossop, Derbyshire

Approved Planning 1 paper

Development Control Committee approved this item on Monday 13 February 2023. Below is the council's own wording, with the papers it was decided on.

Item23/75

Resolved

That planning permission be approved as set out in the report, subject to: (i) The amended section 106 agreement contributions as set out in the update sheet; (ii) The additional and deleted conditions as set out in the update sheet; (iii) An additional condition to require swift boxes on buildings, particularly the mill building, if not already covered elsewhere within the conditions; (iv) An additional condition to require EV charging points to be provided for the flats if not already covered under building regulations; (v) An additional condition to ensure that the scheme of materials include the use of reclaimed stone with matching artificial stone within the site, the details of which to be agreed with the Council 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/ informatives /planning obligations or reasons for approval / refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the succeed the substantive nature of the committee’s decision.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE

Date 13th February 2023

Application HPK/2022/0317 No: Location Eastern Mill, Milltown, Glossop, Derbyshire Proposal Demolition of derelict industrial buildings, the erection of 25 new houses and two apartment buildings (51 units and 9 units respectively), conversion of Easton House into 10no. apartments and its former Coach house to 3no. dwellings, along with associated access works (including a new footway to Milltown and a new riverside walkway), car parking, restoration of Mill Pond, landscaping, amenity space and all associated works. Applicant [name removed], Watson Construction Holdings Limited, Agent [name removed], Walker Simpson Architects, 33 Piccadilly, Manchester Parish/ward Howard Town Date registered 14th July 2022 If you have a question about this report please contact: Tom Hiles [email protected] 01538 395400 extension 5430

1. SUMMARY OF RECOMMENDATION

Approve, subject to conditions and legal agreement

2. REASON FOR COMMITTEE DETERMINATION

2.1This application has been brought before the Development Control Committee due to the scale of the development and the public interest.

3. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS

3.1The application site comprises land and buildings located to the east of Glossop town centre, roughly enclosed by Milltown at the west, High Street East to the north, and Shirebrook Drive at the east. Shelf Brook runs along the east boundary of the site, and joins Hurst Brook at the south-east corner of the site to become Glossop Brook running along the south edge of the site.

3.2The site comprises two distinct (though contiguous) parcels. The smaller, northern part of the site is the former Easton House, a historic manor house accessed off High Street East, which is set in grounds along with a detached coach house. Both buildings have been disused for some time and are partly derelict, and the grounds are heavily overgrown. This part of the site has gated access off High Street East.

1 3.3 The larger part of the site, positioned to the south and east of Easton House and at a lower elevation, is disused industrial land. This part of the site comprises a cleared area formerly occupied by industrial premises which fully enclosed most of the area now cleared. Remaining structures on the site includes a three-storey stone mill building, Eastern Mill, located at the west edge of the site adjoining Milltown. The site is otherwise enclosed by a high stone wall along Milltown. A number of other small structures remain on the site, in various derelict conditions. The lower part of the site is otherwise cleared of previous structures and generally level and open. There is vehicle access onto the southern part of the site from Milltown, adjacent to Eastern Mill.

3.4The lower part of the site also includes a defunct millpond at the north- east corner, which is understood to have served an earlier phase of industrial operation on the site. The millpond is now heavily overgrown with trees.

3.5In terms of the immediate context, the site is generally surrounded by residential uses on all sides, with the exception of the Jehovah’s Witness church adjacent to the west boundary of the site on Milltown, and a public house slightly further removed. Further to the west are retail and leisure developments to the south of High Street East, and beyond that the rest of Glossop town centre

3.6The site is subject of the following planning policy and other designations:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
HPK/2022/0317: Eastern Mill, Milltown, Glossop, DerbyshireReport 1.2 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

11 of 21 attended
RM
Councillor Robert McKeownChair, present
DL
Councillor David LomaxVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
LD
Councillor Lance DowsonCommittee Member, apologies
CF
Councillor Charlotte FarrellCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
GO
Councillor Graham OakleyCommittee Member, present
JP
Councillor Jim PerkinsCommittee Member, present
PR
Councillor Peter RobertsCommittee Member, present
ET
Councillor Emily ThraneCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present
SY
Councillor Stewart YoungCommittee Member, present

All 21 on the meeting page

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies