That authority be delegated to the Head of Development Services in consultation with the Chair to approve the application subject to the satisfactory conclusion of matters as set out in the update sheet; 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/ informatives /planning obligations or reasons for approval/refusal) prior to the decision being issued, the Operations Manager – Development Services has delegated authority to do so in consultation with the Chairman of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date: 22nd May 2023
Application HPK/2022/0376 (FULL) No: HPK/2022/0377 (LBC) Location Grove Hotel, Grove Parade, Terrace Road, Buxton, Proposal Full planning permission for 17 apartments and two extensions to the rear elevation, and, Listed Building Consent for 17 apartments two extensions to the rear elevation. Applicant AH2 Buxton Limited Agent [name removed], Still House Design Parish/ward Buxton Central Ward Date registered 30th September 2022 If you have a question about this report please contact: Rachael Simpkin [email protected]
1. REFERRAL
1.1This application has been brought before the Development Control Committee because the application is a small scale major residential scheme.
2. SUMMARY OF RECOMMENDATION
APPROVE, subject to recommended conditions for both application and securing a s106 planning agreement for HPK/2022/0376 (FULL).
3. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
3.1The scheme relates to the Grade II listed former Grove Hotel, which has been redundant for some time and is located within the Buxton Central Conservation Area subject to an Article 4 direction. The building’s listing is described as: “Formerly known as: Grove Coffee House Terrace Road. Includes: Nos.1, 3 and 5 Grove Hotel and Grove Parade Spring Gardens. Hotel with shops. c1770 and late C18 with canopy and shop fronts of 1883 at 1 2 & 3 Grove Hotel & Parade”.
3.2The 4-storey building built c.1770-1802 with associated external space to the rear occupies a prominent corner positioning to the east side of Terrace Road presented with a rendered frontage, sash windows, Welsh slate roof with grouped stone chimney stacks and cast iron glazed canopy over the ground shop frontages and hotel entrance. The rear of the building has been subject to a number of unsympathetic alterations and extensions over time. 3.3 The site falls within the Town Centre, Primary Shopping Centre, Regeneration Area (DS22) within the defined built up area boundary of Buxton. Other site constraints include: Flood zones 2 and 3, Buxton Groundwater Source Protection Zone, Nutrient Neutrality: River Wye SSSI (Site Special Scientific Interest) and Peak District Dales Catchment SAC (Special Area of Conservation) and Radon Potential Area Class 5.
4. DESCRIPTION OF THE PROPOSAL
4.1The proposal (as revised) is for the conversion and extension of the former Grove Hotel to provide 17 apartments with storage on the ground floor. The applications seek full planning permission for the change of use of hotel to residential with rear extensions and listed building consent for repair / refurbishment works and rear extensions all to create 6 x one-bedroom and 11 x two-bedroom apartments over three floor levels. The two ground floor apartments have been omitted to overcome Environment Agency objections and instead the ground floor would be designated for cycle storage and ‘vacant’ storage.
4.2The scheme proposes two new infill areas to the existing building’s massing at the rear to accommodate shared access stairs to the upper floors within one infill whilst extending the accommodation at the 2nd and 3rd floors within the other infill. The proposed new-build areas at the rear would be faced in a combination of render and stone below a pitched slate tiled roof. The new-build staircase core would include continuous glass curtain walling. New windows for the proposed accommodation would consist of timber sash windows.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.