Resolved
That the update sheet be noted.
Development Control Committee noted this item on Thursday 28 September 2023. Below is the council's own wording, with the papers it was decided on.
Resolved
That the update sheet be noted.
28th September 2023
HPBC DEVELOPMENT CONTROL COMMITTEE
UPDATES SHEET
HPK/2023/0025 – Land at Hollincross, Glossop
Public Representation (1)
41 Hollin Cross Lane (additional): Garden boundary immediately borders the site approximately 50cm away from the building proposed for demolition; our house does not appear on some of the plans; application has been rejected on three occasions; there are no material changes to the rejected plans; instead proposes an additional property to the site; continued applications are stressful for residents who would be directly affected by the development; concerned about demolition given proximity to site and therefore would be unable to utilise garden owing to construction risks in relation to health and safety matters including asbestos and construction safeguarding measures are therefore queried.
Officer Response
Council OS Base: Proposed Site Plan:
Agent
“With regard to removing the two-storey extension close to the boundary with residents, this would deliver a significant amenity improvement. I appreciate there would be short-term disruption during demolition as is typically the case with development work, but the future context would be far better for existing residents with a two-storey extension and associated first floor windows removed from the boundary”.
Officer Comments
The officer report has considered the scheme in light of the recent appeal decision, which is considered to be a material consideration of significant weight in the determination of the proposal. In addition, the removal of built development to the neighbouring boundary is considered to be a notable improvement to the amenity of those impacted residents sited on Hollin Cross Lane.
If planning permission is granted, officers have recommended the imposition of a planning condition securing a ‘Construction and Environmental Construction Management Plan’ to limit the potential adverse impacts of the development during its construction phase.
In addition and notwithstanding Natural England Licence conditions in relation to bats, demolition matters thereafter fall within the control of Building Regulations and the Health and Safety Executive.
Public Representation (2)
A further representation has been received on behalf of 32 listed residents (unsigned) as follows:
“Residents of Slatelands Road and Slatelands Avenue would like to thank High Peak Borough Council Development Control Committee and Planning Officers for their attempts to refuse this planning application.
The proposal will compromise the integrity of an area of mature woodland that makes an important contribution to the amenity and natural environment of this part of the Glossop St. James Conservation Area. It will also increase hazards for pedestrians, cyclists and drivers at an already difficult road junction.
We are extremely disappointed that the Planning Inspector did not give greater regard to the views of over 300 local residents, and of the local MP and local Council members, on these matters.
We are also extremely disappointed that Derbyshire CC Highways - the local Highway Authority - did not support you in your recommendation to refuse the previous planning application (HPK/2020/0334). As a consequence, you were unable to include a Highways Reason for Refusal, as noted by the Planning Inspector at the Appeal.
DCC Highways, in their response to consultation on this application, quote the National Planning Policy Framework (NPPF) to support their view that the traffic impact of this development would not justify a recommendation to refuse the application.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Update SheetReport | 539 KB | DownloadRead as text |
Follow Development Control Committee at High Peak and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Aug 2026 | Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. | Approved | Open |
| 10 Aug 2026 | Update SheetThat the update sheet be noted. | Noted | Open |
| 10 Aug 2026 | Planning ApplicationsThat the report be noted. | Noted | Open |
| 10 Aug 2026 | HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... | Approved | Open |
| 10 Aug 2026 | HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.