Item25/94

Resolved

That the update sheet be noted.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

24th MARCH 2025

HPBC DEVELOPMENT CONTROL COMMITTEE

UPDATES REPORT

ITEM 1 – HPK/2024/0265 – Hillhead Quarry, Hillhead Lane, Harpur Hill, Buxton

HPBC Environmental Health Officer:

14.03.25

Hillhead Quarry is considered an active quarry site, but currently no mineral processing is taking place. The quarry utilises the access off the B5053 opposite L’Hoist, rather than Hillhead Lane.

The “storing, loading or unloading of cement or cement clinker in bulk prior to further transportation in bulk” is a prescribed activity under the Environmental Permitting (England and Wales) Regulations 2016. “bulk” is taken to mean “loose”. There is no lower threshold. Therefore, where this activity is undertaken an Environmental Permit will be required. If the activity is already in operation, then operations must cease and an application submitted without delay for an Environmental Permit.

Best available techniques for the transfer of bulk cement clinker is using enclosed mechanical procedures. Tipping of cement clinker in the open or use of grab loaders or shovel loaders is unlikely to be considered acceptable due to the potential for dust generation and further consideration will need to be given to the proposal and control measures.

18.03.25

In summary, unless demonstrated otherwise by the applicant, the clinker cannot be stored outdoors or in unprotected stockpiles, so including a condition stating it can be to a maximum amount / height undermines this.

The response from environmental health was put to the applicant’s agent because the difficulty presented by this advice is that the storage of clinker will require an element of operational development that cannot be dealt with within this s73 application.

Agent:

20.03.25

The agent advised that their client was away so was unable to take instruction, however, they confirmed they would be able to arrange the appropriate permit. They advised that the absence of a permit would not be a basis for refusing to either deal with a planning application or issue a decision as they are different regimes that should be considered in isolation.

In these circumstances, please can I ask that the application is deferred from committee on Monday and that we are given until the end of next week to respond and agree the best way forward. If we need to submit a new application for the clinker it would be sensible for this to also include the bagged cement but clearly we will review all matters in light of the updates and responses we get when we have spoken with [name removed].

HPBC Planning Officer:

Whilst it is regrettable that the advice from the Council’s Environmental Health Department has not been received until this late time, unfortunately we cannot deal with the operational requirements for any undercover storage for the clinker, given the planning application proposes a variation of an approved change of use only.

In these circumstances, officers consider a decision by omitting the cementitious materials (clinker) element whilst regularising and controlling the proposed storage of bagged cement would be appropriate. The proposed drainage scheme condition is considered to be necessary in terms of the proposed uses of the application site as some bags of spilt cement from broken bags have been observed.

An informative will be imposed advising that if they wish to store clinker then a separate planning application will be required for a structure/building required to enclose it and that advise should be sought from environmental services or if required the environment agency.

RECOMMENDATION: APPROVE, subject to the following amended conditions:

1. Approved Plans: Location Plan and Site plan 1440-100-A.

2. The site shall be used solely for the storage of HGV's, commercial vehicles and bagged / packaged cement not exceeding 5,000 tonnes, which shall be stored at a maximum height of 3.85 metres in accordance with site plan drawing ref. ‘Site plan 1440-100-A’ and for no other purposes.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Update SheetReport 209 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 22 attended
RM
Councillor Robert McKeownChair, present
DL
Councillor David LomaxVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
SE
Councillor Simon EvansCommittee Member, present
CF
Councillor Charlotte FarrellCommittee Member, present
SG
Councillor Stewart GardnerCommittee Member, present
AH
Councillor Adrian HopkinsonCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
PR
Councillor Peter RobertsCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present
GS
Councillor Gillian ScottCommittee Member, present
LG
Councillor Linda GroobyCommittee Member, apologies, sent representative

All 22 on the meeting page

On this subject at High Peak

Search all
  1. Update SheetThis decision
  2. Update SheetNoted
  3. Update SheetNoted
  4. Update SheetNoted
  5. Update SheetNoted
  6. Update SheetNoted

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies