CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Development Control Committee, Monday 24 March 2025 at 1.30pm

HPK/2025/0032 - New Mills Leisure Centre, Hyde Bank Road, New Mills, Derbyshire SK22 4BP

Approved Planning 1 paper

Development Control Committee approved this item on Monday 24 March 2025. Below is the council's own wording, with the papers it was decided on.

Item25/97

Resolved

That planning permission be granted as set out in the report; 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/informatives/planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE

Date 24th March 2025

Application HPK/2025/0032 No: Location New Mills Leisure Centre, Hyde Bank Road, New Mills, Derbyshire SK22 4BP Proposal Installation of PV panels and other plant equipment to existing roof Applicant [name removed] (on behalf of High Peak Borough Council) Agent N/A Parish/ward New Mills Date registered: 03/02/2025 If you have a question about this report please contact: Stuart Talbot, email: [email protected]

REFERRAL

The application is before committee as it is submitted on behalf of High Peak Borough Council

1. Summary of Recommendations

APPROVAL with conditions

2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS

2.1The application site refers to New Mills Leisure Centre which is located on Hyde Bank Road within the established settlement boundary of New Mills. The site is bounded by Hyde bank Road to the north and west, by the Sett Valley Medical Centre to the east and New Mills Secondary School and additional residential dwellings further to the south and Church Lane to the north.

2.2The application building itself is a large leisure facility building which comprises a Sports Hall, Swimming Pool, and Squash courts.

2.3According to available mapping the facility dates back to its initial construction in 1979 before being extended further to include the sports hall element in 1988.

2.4The application site is also located directly adjacent to the New Mills Conservation Area. 3. DESCRIPTION OF THE PROPOSAL

3.1Planning permission is sought for the erection of solar PV panels to the roof and an Air Handling Unit (AHU). The AHU is to replace the existing unit albeit with a larger unit to serve the swimming pool within the Leisure centre. The proposed PV system is a 110.075 kW array. Which will generate an estimated 83,765 kWh annually. The system has an expected lifetime of 20 years.

3.2The proposed panels would be located to the south east facing and south west facing roof elevations with a maximum tilt of 22 Degrees. The proposed PV panels would occupy an area of approximately 504.22 Sqm which equates to 24.35% of the overall roof area.

3.4The AHU plant equipment will have an overall height of 2.3m located to the roof of the existing plant room towards the centre of the main Leisure Centre building.

3.5The application, the details attached to it, including the plans and the responses of the consultees can be found on the Council’s website at:

Planning Application - High Peak Borough Council

4. Relevant Planning History

Reference no. HPK/0000/8684 Description: Proposed Swimming Pool and Squash Courts Decision: Refused (20/10/1978)

Reference no. HPK/0002/5756 Description: New changing room, store and sports hall. Decision: Approved (21/09/1987)

5. Planning Policy

5.1High Peak Local Plan (Adopted 2016)

S1 Sustainable Development Principles S1a Presumption in Favour of Sustainable Development S2 Settlement Hierarchy S6 Central Sub-Area Strategy EQ1 Climate Change EQ6 Design and Place Making EQ7 Built and Historic Environment

5.2Supplementary Planning Guidance/Documents

High Peak Design Guide (2018) Landscape Character Assessment SPD - Urban (2006) 6. Consultation

6.1Public comments

No neighbour representations have been made with regard to this application.

6.2Conservation Officer Comments (No Objection)

The proposed PV panels and AHU unit have been located to minimise the aesthetic impact and visibility of the installation. The New Mills Leisure Centre does not offer any architectural merit, and as such offers a neutral contribution to the setting of the New Mills Conservation Area. As such the introduction of the solar PV panels and AHU unit will cause a minor degree of less than substantial harm to the setting of the adjacent conservation area.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
HPK/2025/0032: New Mills Leisure Centre, Hyde Bank Road, New Mills, Derbyshire SK22 4BPReport 417 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 22 attended
RM
Councillor Robert McKeownChair, present
DL
Councillor David LomaxVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
SE
Councillor Simon EvansCommittee Member, present
CF
Councillor Charlotte FarrellCommittee Member, present
SG
Councillor Stewart GardnerCommittee Member, present
AH
Councillor Adrian HopkinsonCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
PR
Councillor Peter RobertsCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present
GS
Councillor Gillian ScottCommittee Member, present
LG
Councillor Linda GroobyCommittee Member, apologies, sent representative

All 22 on the meeting page

On this subject at High Peak

Search all
  1. HPK/2025/0032 - New Mills Leisure Centre, Hyde Bank Road, New Mills, Derbyshire SK22 4BPThis decision
  2. HPK/2026/0195 - 20 Albion Road, New Mills, SK22 3EXApproved
  3. HPK/2026/0086 - Hague Bar Works, Hague Bar, New Mills, SK22 3ATRefused
  4. HPK/2025/0157 - Goyt Valley House, Jubliee Street, New MillsApproved
  5. HPK/2022/0568 - Newfield Garage, Manchester Road, Tunstead Milton, Whaley Bridge, High Peak, SK23 7ERRefused
  6. HPK/2026/0146 - Land at St Georges Rd, New Mills DerbyshireRefused

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies