Resolved
That the update sheet be noted.
Development Control Committee noted this item on Monday 11 August 2025. Below is the council's own wording, with the papers it was decided on.
Resolved
That the update sheet be noted.
11th August 2025
HPBC DEVELOPMENT CONTROL COMMITTEE
UPDATES REPORT
ITEM 1 – HPK/2023/0192 – Land at Hogshaw, Buxton
Councillors Quinn & Hall:
“Unfortunately, we are unable to attend the committee meeting on 11 August 2025 but we would ask that the comments in the email exchange below are noted by the committee, and that the plans for the proposed drainage are available, as they are vital in addressing our major concern respecting this application.
We accept the points made as to the provision of drainage but would ask that there is a clear plan and chain of responsibility for the monitoring and maintenance of the drainage for this site. Any blockage, or disrepair could lead to excess water hitting the brook downstream of the culvert, which would mean that the risk of flooding is heightened. Therefore, monitoring of the construction work as it progresses and of system maintenance once in place is crucial, any failure would entail responsibility for the consequences of the increased flood risk to the residents of Brooklands, Ash Terrace, Charles Street, and sections of Lightwood Road”.
Friends of Hogshaw:
“I wanted to put on record that the figure in the Report stating Friends of Hogshaw obtained just 26 signatures for it's petition against the development are incorrect. I think this arose because the petition was handed in, at the town hall, in two parts.
Anyway, the actual figures are as per attached: 321 locals signed the petition with a further 5,000 + signing a more general online petition.
I would request that the figures are formally updated”.
HPBC Case Officer:
PROW (Public Rights of Way)
The County PROW Team have confirmed no objections to the revised Multi-User Plan, which had previously been updated on the basis of updated house type amendments only.
In terms of paragraph 7.151 of the officer report, no existing footpaths or bridleways are to be diverted as part of the development.
Flood Risk & Drainage
The ward Councillor’s queries as referred to above and in turn the applicant’s response are fully detailed within the officer report at paragraph 7.172. In addition, the Lead Local Flood Authority’s (LLFA) response to the culvert survey and its recommendations are confirmed within the officer report at paragraph 7.174. The LLFAs recommended planning conditions are further detailed within both the consultation (LLFA) and conditions sections of the officer report.
Friends of Hogshaw
The petition received from Friends of Hogshaw containing 26 signatories for the current planning application has been fully detailed and considered within the officer report. Whilst there does not appear to be a record of the entire petition containing a stated 321 signatures, the issues raised have been considered as part of the planning application assessment as stated above.
Similarly, the referenced 5,000 plus online petition appears to have closed c.4 years ago. In addition, it does not appear to have been formally submitted to the Council for the current planning application. Notwithstanding this, Planning Practice Guidance paragraph 016 concludes that “Local opposition or support for a proposal is not in itself a ground for refusing or granting planning permission, unless it is founded upon valid material planning reasons.” The planning issues raised as detailed on the Friends of Hogshaw petitions and website as referred to below have been fully considered within the officer report for the current planning application.
“The green space around Hogshaw, Buxton provides valuable recreation space for local people - dog walkers, children and young people, sports groups, pigeon owners, and many others. It is the old town tip that has now rewilded, providing a habitat for many species of plants, insects, butterflies, moths, mammals and birds. Any housing development in this area would destroy this habitat and recreation space resulting in biodiversity loss, an increase in air pollution and flood risk in an area already at high risk of flooding.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Update SheetReport | 294 KB | DownloadRead as text |
Follow Development Control Committee at High Peak and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Aug 2026 | Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. | Approved | Open |
| 10 Aug 2026 | Update SheetThat the update sheet be noted. | Noted | Open |
| 10 Aug 2026 | Planning ApplicationsThat the report be noted. | Noted | Open |
| 10 Aug 2026 | HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... | Approved | Open |
| 10 Aug 2026 | HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.