CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
High Peak Borough Council
Development Control Committee, Monday 11 August 2025 at 1.30pm

HPK/2023/0192 - Land at Hogshaw, Fairfield, Buxton

Approved Planning 2 papers

Development Control Committee approved this item on Monday 11 August 2025. Below is the council's own wording, with the papers it was decided on.

Item26/33

Resolved

That the application be approved as set out in the report, subject to: a an additional condition requiring the provision of landing/resting areas, e.g. benches, on the primary street within the development; b the developer be requested to install tactile crossing points as part of compliance with condition 32; c the inclusion of an Overage Clause within the Section 106 agreement to be assessed on completion of the development; and d that authority be delegated to officers to agree suitable solar panels for plots 1 to 5 and 90 to 99 (i.e. those properties where permitted development rights have been removed in respect of solar panels. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/ informatives /planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

Background

At the 16th June 2025 Development Control Meeting it was resolved that the application be deferred to allow additional information to be provided in respect of the following matters to enable further consideration of this planning application:-

1. The viability assessment and review in respect of the proposed reduced provision of affordable housing and other contributions on the site;

2. Air quality matters, including up to date emissions data and an explanation of the conclusion from Environmental Health; and,

3. Drainage and flood risk matters, including in relation to the structural condition of the Nun Brook Culvert.

Members will be updated on these matters in the relevant report subject headings below.

In summary, the applicant’s Financial Viability Assessment (FVA) dated August 2024 and recently provided Executive Summary with Supporting Letter have been placed on the public file for the planning application alongside the Council’s Independent Appraisal of the applicant’s findings, accompanied by a property mix appraisal.

An Air Quality Assessment (AQA) Addendum dated July 2025 has also been received and provides additional information in relation to the Hogshaw Roundabout AQA, the assessment carried out by the Council to inform the Fairfield Road AQMA and an update on the latest available air quality information for the area. Additional mitigation as a result of the scheme is not deemed necessary and therefore it is not considered appropriate to undertake damage cost calculations or undertake to provide additional mitigation to those measures identified within the Travel Plan and / or as required under Building Regulations as concluded by the report. These matters have been concurred with by the Council’s Environmental Health Officer following consultation and therefore no further work in the form of a planning condition has been requested in these regards.

In terms of drainage and flood risk matters, a Culvert Stability Appraisal alongside CCTV footage of the existing culvert has been submitted to the Council and has been considered by the LLFA (Lead Local Flood Authority). It demonstrates the current culvert condition is satisfactory and if the recommendations of the appraisal are followed, the risk of any negative effect of the culvert both during and following construction would be mitigated as confirmed by the LLFA.

In relation to other matters, the applicant has provided a revised Energy and Sustainability Report dated July 2025 together with a Solar Photo Voltaic (PV) Layout (H8797-BAH-XX-XX-DR-UD-203075), with roof solar PV panels included on updated house types for all scheme plots.

The updated revised planning application form has confirmed the correct gross site area as 5.605 hectare (ha) to correctly reflect the previously amended red edge, which has accommodated the relocated attenuation basin which allowed for the greater retention of trees.

SUMMARY OF RECOMMENDATION

APPROVE with conditions and s106 legal agreement.

1. REASON FOR COMMITTEE DETERMINATION

1.1This application has been brought before the Development Control Committee as the proposal constitutes major development exceeding 1.0 hectare (ha) and is locally controversial.

2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
HPK/2023/0192: Land at Hogshaw, Fairfield, BuxtonReport 2.2 MB DownloadRead as text
PDF
ITEM 1b APPENDIX Appropriate Assessment Proforma: Hogshaw 30.07.25 /33Appendix 321 KB Download

At this meeting

Whole meeting

Who was there

8 of 21 attended
RM
Councillor Robert McKeownChair, present
SE
Councillor Simon EvansVice-Chair, apologies
AB
Councillor Alan BarrowCommittee Member, apologies
CF
Councillor Charlotte FarrellCommittee Member, present
SG
Councillor Stewart GardnerCommittee Member, present
LG
Councillor Linda GroobyCommittee Member, present
AH
Councillor Adrian HopkinsonCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
DL
Councillor David LomaxCommittee Member, apologies
PR
Councillor Peter RobertsCommittee Member, present
GS
Councillor Gillian ScottCommittee Member, present
JT
Councillor Jean ToddCommittee Member, apologies

All 21 on the meeting page

On this subject at High Peak

Search all
  1. HPK/2023/0192 - Land at Hogshaw, Fairfield, BuxtonThis decision
  2. HPK/2026/0146 - Land at St Georges Rd, New Mills DerbyshireRefused
  3. HPK/2023/0328 - Portland Nursing Home, 8 Park Road, BuxtonApproved
  4. HPK/2025/0340 - Hargate Hill Equestrian Centre Hargate Hill, Glossop - Retrospective application for change of use of land for the siting of caravans for residential occupation with associated developmentRefused
  5. HPK/2025/0447 - Land at Crossings Road, Chapel-en-le-FrithApproved
  6. HPK/2024/0496 - Land off Brown Edge Close, BuxtonApproved

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies