CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Hillingdon
Central & South Planning Committee, Thursday 5 January 2012 at 7.00pm

West London Shooting School, West End Road, Northolt 39704/APP/2011/2964

Decided Planning 1 paper

Central & South Planning Committee decided this item on Thursday 5 January 2012. Below is the council's own wording, with the papers it was decided on.

Item220

Resolved

Resolved - That the London Borough of Ealing be informed that the London Borough of Hillingdon raises NO OBJECTION to the proposed scheme, subject to the conditions set out in the officer’s report and addendum sheet circulated at the meeting.
Word for word from the decision Hillingdon published for this meeting. Source: modgov.hillingdon.gov.uk

Follow this further

Built from Hillingdon's papers

What the report saysPro

Report to Central & South Planning Committee

Report of the Head of Planning & Enforcement Services

Address LONDON BOROUGH OF EALING OUTBOROUGH MIDDLESEX

Development: Raising of height of existing attenuation flat top bund ranging between 3m at its eastern end and 15m at its western end to create a dome shaped bund (Consultation by the London Borough of Ealing, relating to the West London Shooting School).

LBH Ref Nos: 39704/APP/2011/2964

Drawing Nos: WLSS1109A - 1 - A WLSS1109A - 2 - A Planning, Design and Access Statement Transport Statement - September 2011 Arboricultural Report - 2664/DMC/dmc WLSS1110 - 1- A Specification and Method Statement Landscape and Visual Impact Assessment - 29/09/11 Rev B Noise Impact Assessment - 23/09/11 Flood Risk Assessment and Surface Runoff Management - September 2011 Extended Phase 1 Habitat Report - 7132 Ver 1 Archaeological Statement - 06/09/11 Air Quality Assessment - September 2011

Date Plans Received: 07/12/2011 Date(s) of Amendment(s): Date Application Valid: 07/12/2011 1. SUMMARY The application seeks planning permission to raise the height of the existing flat-topped attenuation bund to create a dome shaped bund. The height increases will range from 3 metres at the eastern end to 15 metres at the western end. This will enable improved noise protection for the surrounding properties.

For the reasons outlined below, the proposal is considered to comply with the policies of the adopted Hillingdon Unitary Development Plan (Saved Policies September 2007), as such it is recommended that no objection be raised to the application. 2. RECOMMENDATION That the London Borough of Ealing be informed that the London Borough of Hillingdon raises NO OBJECTION to the proposed scheme, subject to the following conditions:

1. Prior to development commencing, the applicant shall submit a demolition and construction management plan to the Local Planning Authority for its approval. The plan shall detail:

(i) The phasing of development works (ii) The hours during which development works will occur. (iii) A programme to demonstrate that the most valuable or potentially contaminating materials and fittings can be removed safely and intact for later re-

Central & South Planning Committee - 5th January 2012 PART 1 - MEMBERS, PUBLIC & PRESS use or processing. (iv) Measures to prevent mud and dirt tracking onto footways and adjoining roads (including wheel washing facilities). (v) Traffic management and access arrangements (vehicular and pedestrian) and parking provisions for contractors during the development process (including measures to reduce the numbers of construction vehicles accessing the site during peak hours). (vi) Measures to reduce the impact of the development on local air quality and dust through minimising emissions throughout the demolition and construction process. (vii) The storage of demolition/construction materials on site.

The approved details shall be implemented and maintained throughout the duration of the demolition and construction process.

REASON To safeguard the amenity of surrounding areas.

2. No contaminated soils or other materials shall be imported to the site. All imported soils shall be clean and free of contamination. All imported soils shall be inspected and tested for chemical contamination and the results of this testing shall be submitted to and approved by the Local Planning Authority.

REASON To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems and the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.

3. Prior to commencement of the development hereby approved, a management plan outlining how the quantity and quality of material used on the site will be maintained and managed, shall be submitted to and approved in writing by the Local Planning Authority.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
West London Shooting School, West End Road, Northolt 39704/APP/2011/2964Report 570 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

9 of 11 attended
JH
Councillor John HensleyChair, present
JC
Councillor Judith CooperVice-Chair, present
WB
Councillor Wayne BridgesCommittee Member, present
JD
Councillor Janet DuncanCommittee Member, present
NF
Councillor Neil FyfeCommittee Member, present
DG
Councillor Dominic GilhamCommittee Member, present
RS
Councillor Robin SansarpuriCommittee Member, present
BS
Councillor Brian SteadCommittee Member, present
GB
Gill BriceSecretary, present
ND
Natasha DograSecretary, expected
NW
Nadia WilliamsSecretary, expected

On this subject at Hillingdon

Search all
  1. West London Shooting School, West End Road, Northolt 39704/APP/2011/2964This decision
  2. West London Waste PlanNoted
  3. West London Waste Plan Regulation 19Approved
  4. West London Waste Plan - Regulation 19 Consultation (policy framework)Noted
  5. West London Waste Plan Regulation 18 Consultation - Policy FrameworkAgreed
  6. Hillingdon Council's membership of the West London Economic Prosperity BoardApproved

More from Hillingdon Central & South Planning Committee

All decisions
MeetingDecisionOutcome
4 May 2021 To sign and receive the minutes of the previous meeting dated 7 April 2021That the minutes of the meeting dated 7 April 2021 be approved as an accurate record subject to an amendment to indic... Approved Open
4 May 2021 2 De Salis Road, Hillingdon - 38071/APP/2020/36391) That the application be refused; and 2) That delegated authority be granted to the Head of Planning to explore the... Refused Open
4 May 2021 43 Sweetcroft Lane, Hillingdon - 17412/APP/2021/5991) That the application be refused; and 2) That delegated authority be granted to the Head of Planning, in consultati... Refused Open
4 May 2021 Heinz Wolff Building, Brunel University - 532/APP/2021/330That the application be approved. That the application be approved. Approved Open
4 May 2021 Harmondsworth Landfill Site, Harmondsworth Lane - 43155/APP/2020/4267That the application be approved. 1) That delegated authority be granted to the Head of Planning to reword Point 2 on... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies