Noted the acknowledgement by the Environment Agency that St Ives, Hemingfords and Fenstanton section of the River Great Ouse required significant defence works to ameliorate flooding. The Environment Agency is requested to consider as a matter of urgency an increase in the frequency that this section of river is dredged to facilitate the rates of flow in the river. In the event that the increased dredging of the river does not alleviate flooding of the area, the Agency is requested to proceed with the improvement works to the flood bank. That the Agency be requested to note the possibility that in the event of the bund being improved surface water may continue to cause flooding in Victoria Terrace and Greenfields, without the provision of a pumping station and in the event of a pumping station being installed no contribution will be made by the Council towards the capital cost and ongoing responsibility for the operation and maintenance of the pumping station.
Word for word from the decision Huntingdonshire published for this meeting.Source: democracy.huntingdonshire.gov.uk
ST IVES, HEMINGFORDS AND FENTANTON FLOOD ALLEVIATION SCHEME
(Report by Head of Environment & Transport )
1. INTRODUCTION
1.1Following the floods in Hemingford Grey in 1998 and 2001, the Environment Agency (the Agency) have completed a study into the possibility of improving the flood defences to this area.
1.2The draft of this report has now been prepared and it has raised issues potentially outside of the Agency’s remit where they are seeking support from the District Council.
2. RESULTS OF THE AGENCY’S STUDY:
2.1The study showed that the present flood bank to the north of Hemingford has a defence standard of less than 1 in 20 years and that some 400 homes were at risk of flooding south of the river.
2.2The Greenfields area of Fenstanton was shown to be at risk of flooding floods below the 1: 100 year return period standard.
2.3The Victoria Terrace area floods due to combination of overtopping of the flood-bank, poor surface water drainage and high ground water table levels. The surface water cannot drain away at times of river flooding as it is below the river level and has to wait until river levels return to normal. A substantial number of properties in this area were flooded in 1998 and have been threatened in more recent flood events.
2.4In addition, the study identified the potential risk to St Ives associated with any increase in river level. Some 900 properties are potentially at risk of flooding north of the river.
3. AGENCY PROPOSALS
3.1The Agency propose to improve the existing flood bank to the south of the river in the vicinity of Hemingford to give a 1 in 100 years standard of protection. This flood bank will be extended to the east of Hemingford to protect the London Road area (of St Ives) and down to Greenfields. This will ensure that properties at all three locations are protected to the 1 in 100 years standard. These proposals are outlined in the plan (Annex A) accompanying this report.
3.2Proposals for increasing the protection to St Ives by constructing defences north of the river also have been developed by the Agency.
3.3Overall the scheme is estimated by the Agency to cost in the order of £4 millions and will protect some 1,300 homes. In view of the number of homes protected the scheme would qualify for grant support from central government. Such government support is now allocated as an annual block grant to the Agency rather than on a scheme-by-scheme basis so it is not possible at this time to establish the level of grant funding that will be allocated to the scheme.
3.4A feature of the scheme to the south of the river is a pumping station intended specifically to remove surface water and ground water infiltration from behind the improved flood bank. This would reduce the risk of flooding to the homes within the banks.
3.3This pumping station would be located on land adjacent to Hemingford Road near Victoria Terrace. A better land drainage system would be provided around Victoria Terrace to get the flows to the pumping station and improvements would be needed to modify the land drainage system from the Greenfields area to also drain to the station.
3.4The Agency have included the cost of the pumping station within the overall flood alleviation scheme. The cost of the pumping station and associated pumping main will be in the region of £400k but is understood not to be eligible for the grant funding referred to in paragraph 3.3 above.
4. FUNDING AND OPERATION OF THE PUMPING STATION
4.1Although the Agency consider that it is sensible to include the pumping station within the proposed works for the St Ives and Hemingford Flood Alleviation Study, because the station’s primary function is dealing with surface water, they are of the opinion that the future ownership, operation and maintenance should lie with the District Council.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.