Development Control Panel: changed to Development Management Panel - May 2009 decided this item on Monday 16 October 2006. Below is the council's own wording, with the papers it was decided on.
RESOLVED that a further training event be arranged for 18th December 2006 to enable the Panel to consider the revised methodology in detail prior to its re-submission to the meeting of the Panel in December and the proposed introduction of the trial project for a twelve month period thereafter.
Word for word from the decision Huntingdonshire published for this meeting.Source: democracy.huntingdonshire.gov.uk
Report to Development Control Panel: changed to Development Management Panel - May 2009
Background
2.1The Design Review flows from the work resulting from the implementation of the Huntingdonshire Design Guide 2004. It is intended to provide a method for ‘scoring’ developments once they are complete and to provide a level of feedback to further improve the application and design process.
2.2The Huntingdonshire Design Review ‘Method and Procedure’ paper, attached in Appendix 1, explains the proposed process for development scoring.
3. THE DESIGN REVIEW
3.1Over the last two to three years there has been a significant improvement in the submission of application material and development outcomes helped, in the main, by officers’ and members’ ability to refer to best practice guidance material in the form of the Design Guide, on-going officer and member training and by more pro-active methods of negotiation. At the present time, there is currently no formal means of measuring these improvements or for identifying areas of weakness that still remain.
3.2It is therefore intended to operate a ‘design review’ of completed developments. The review method is to be based on that developed for the Building for Life awards. This method has been adopted by CABE for some of their regional assessments of building quality which have received significant press attention in recent months. Design for Homes, who contribute to the Building for Life awards, have already been involved with this Council as the co-organiser of the Civic Trust coach trip attended by a number of Panel members in 2003 when we visited schemes in Mid Beds and Ely. Design Reviews are encouraged by CABE in their publication How to do design review: Creating and running a successful panel, published in July 2006. 3.3 The review itself looks at 20 parameters of design. These range from assessing contributors to ‘character’, to issues of road design, car parking, methods of construction, housing mix and proximity to community facilities etc. By scoring each criterion between 0 and 5, a total score is achieved with a maximum of 100.
3.4Within the Core Strategy, the Council has undertaken to ensure that at least 60% of developments in the district achieve the Building for Life Silver Standard or equivalent, representing a score of 70 or more.
4. THE PILOT PROJECT
4.1The pilot project proposes to set a threshold for measuring schemes at a gross site area of >0.5 hectares or 10+ units. For the purposes of the pilot, schemes completed in 2003 or later will be considered (numbering approximately 25).
4.2To operate the scheme, at least ten individual scores must be provided on each scheme, at least four of which should be presented by Development Control Panel Members. The remainder will be scored by officers. The scores will be averaged and will then form the final score for each development.
4.3The results of the pilot project will be presented in 12 months time, with a report noting the feedback from the review and any proposed refinements of the method resulting from its operation.
4.4A training session on the scoring method was offered to Panel members on 18th September, followed by a trial exercise on site on 21st September, involving members and officers. The results of this event are attached in Appendix 2. The purpose of the training was to assess how comfortable members and officers were with operating the method. As a result of this event, a number of refinements have been made to the scoring method to reduce apparent repetition and to include issues relating to hard and soft landscaping, and the quality of detailing/workmanship.
5. CONCLUSION
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Development Control Panel: changed to Development Management Panel - May 2009 at Huntingdonshire and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.