Ipswich Borough Council
Planning & Development Committee, Wednesday 24 April 2019 at 9.30am

PD/18/12 Item 4 - Application IP/19/00218/FUL

Approved Planning 3 papers

Planning & Development Committee approved this item on Wednesday 24 April 2019. Below is the council's own wording, with the papers it was decided on.

Item144

Resolved

Grant planning permission upon condition that (briefly):- 1. Development to be in accordance with plans. 2. Loading, manoeuvring and parking of vehicles to be provided as per submitted drawing and thereafter retained and used for no other purposes. 3. Provision of areas to be provided for powered two wheel vehicle provision, electric vehicle recharging infrastructure, and secure cycle storage to be submitted to and approved in writing by the Local Planning Authority. 4. Provision of areas to be provided for storage of refuse/recycling bins as per submitted drawing and retained thereafter for no other purpose. 5. Hours of operation restriction 8am to 6pm. INFORMATIVES: 1. Ipswich Borough Council supports the use of automatic sprinkler systems. 2. It is an offence to carry out any works within the public highway, which includes a Public Right of Way, without the permission of the Highway Authority.
Word for word from the decision Ipswich published for this meeting. Source: democracy.ipswich.gov.uk

Follow this further

Built from Ipswich's papers

What the report saysPro

Report to Planning & Development Committee

NOTES This drawing must not be reissued, loaned or copied without the written consent of Richard Vest Architectural Design Ltd. All errors, omissions, discrepancies should be reported to the originator immediately. All dimensions to be checked before site fabrication by the contractor, his sub-contractor or supplier. Do not scale plans - use figure or grid dimensions where given. Any deviation from the drawing to be reported to the originator immediately. The proposals incorporated in this drawing are designed to meet the requirements of the Building Regulations 2000, Approved Documents A to P with all current editions, and all the British Standards and Codes of Practice referred to REMOVE EXISTING METAL STEPS therein. AND FORM NEW CONCRETE STEPS The drawing shall be read in conjunction with Drawing Nos 17-06/01-02; and the 'specification of work' WITH 215mm BRICK WALLS. NEW REMOVE 2NO TREES GALVANISED BLACK METAL HANDRAIL ON TOP OF BRICK WALL Drawing issue status: MH FW4 P5 PRELIMINARY CLIENT APPROVAL PLANNING BUILDING REGS TENDER CONSTRUCTION AS-BUILT P5 MH FW7 MH FW6 MH FW3 NEW B MH FW2 B CDM REGULATIONS (COMMERCIAL CLIENTS) The Principal Contractor is responsible for preparing a Construction Phase Health and Safety Plan before commencing A

IL 1.40 IL 1.35 IL 1.09 SVP 'C' IL 0.75 MH FW5 work, which shall include all necessary method statements and risk assessments and details of welfare facilities relating to the work shown on the plans and detailed in the specification. The Principal Contractor shall provide the Principal Designer with any information requested for the Health and Safety File. P3 ED1 3 2 1 EO/S20/VP/LT

LOW LEVEL CASING REPLACE EXISTING PAIR WET PLAY DOORS WITH NEW DOOR MH FW9 P2 AND SIDELIGHT/FANLIGHT

LOW WALL KITCHEN RANGE RECEPTION (G01) - UNITS - HOWDENS CLERKENWELL GLOSS FLINT GREY T5 P1 11.49m2 - WORKTOP - HOWDENS EVORA GREY SLATE SQUARE EDGED 3230 - 3-COURSE 150X150mm TILE SPLASHBACK TO 3 - 5 YEARS (G03) WC P3 4845

PERIMETER OF NEW WORKTOP WHITE 55.51m2 (G02) - SS 1.5 BOWL SINGLE DRAINER WITH ARMITAGE SHANKS SANDRINGHAM SL SINK MIXER TAP 8.70m2 2500 D1 BU 400WX600mm 3 - DRAWER BASE UNIT BELOW NEW EXISTING HIGH LEVEL BEAM FD30S/SC/S13/VP P1 WORKTOP P2 926 1010 SBU 1000WX600mm SINK BASE DRAWER LINE BELOW NEW WORKTOP C

PROVIDE AND FIX NEW BREAK OUT EXISTING STEPS AND P3 DWU 1000WX300X570mmH DOUBLE WALL UNIT CANOPY TO ONE SIDE OF PLATFORM, BUILD NEW WALLS AND D3 D2 BABY COURTYARD ONLY. 2.5M YARD RAMP/PLATFORMS AS INDICATED TO P5 P4 FD30S/SC/S13/VP P1 W6 HIGH W7 LOW W8 HIGH FD30S/SC/S13/VP F 600mm SPACE FOR FRIDGE BELOW NEW WORKTOP WIDE. MATCH EXISTING IN APPEARANCE AND CHANGE NEW 926 IC A WET PLAY AREA DIMENSIONS. PROVIDE NEW METAL 926 BALUSTRADE ON OUTSIDE OF ALL ED2 1010 1010 WC (G05) - UNITS - BOYCO - WORKTOP - 16mm TRESPA SPECKLED PASTEL REMOVE EXISTING CENTRAL GLAZED RAMPS AND PLATFORMS. MAKE GOOD HALL (G04) 4.78m2

CHANGE EO/S20/VP/LT GREY, 600mm WIDE. SCREEN COMPLETE AND INFILL IN

BABY SURFACING TO COURTYARD TO MATCH EXISTING. G1 CAVITY BLOCKWORK RENDERED WITH 21.02m2 P1 - 3-COURSE 150X150mm TILE SPLASHBACK TO NEW DOOR OPENING D5 D4 PERIMETER OF NEW WORKTOP WHITE NEW GATE W3 HIGH W4 LOW W5 HIGH FD30S/SC/S13/VP FD30S/SC/S13/VP P2 - SS 1.5 BOWL SINGLE DRAINER WITH ARMITAGE SHANKS SANDRINGHAM SL SINK MIXER TAP D6 926 926 LOW WALL P1 1395

FD30S/SC/S13/VP 1010 1010 NEW

1 MH FW10 BREAK OUT EXISTING CONCRETE STEPS, 1799 GULLY 1. 1000WX600mmX650mm HIGH DOUBLE BASE HIGH 926 IL 1.25 HANDRAILS AND SIDE WALLS. BUILD 1010 LINE UNIT BELOW NEW WORKTOP NEW WALL TO MATCH EXISTING IN APPEARANCE AND DIMENSIONS. BUGGY 1500 598 1010 2810 1954 1953 2810 1010 329 2. BELFAST SINK WITH ARMITAGE SHANKS

WET PLAY SANDRINGHAM SL SINK MIXER TAP INSET PROVIDE NEW METAL BALUSTRADE ON STORE EXISTING HIGH LEVEL BEAM P1 OUTSIDE OF ALL RAMPS AND PLATFORMS. P3 WITHIN 1000WX600mmX650mm HIGH DOUBLE

2 BASE HIGH LINE UNIT BELOW NEW WORKTOP NEW CB FENCE AND 3. 1000WX600mmX650mm HIGH SINK BASE HIGH 1000mm WIDE GATE 2 - 3 YEARS (G07) W2 LOW

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Item 4 00218(1)Report 184 KB DownloadRead as text
PDF
Item 4 00218(2)Report 97 KB Download
PDF
PD/18/12 Item 4: Application IP/19/00218/FULReport 678 KB Download

At this meeting

Whole meeting

Who was there

14 of 14 attended
SC
Councillor Stephen ConnellyCommittee Member, present
SG
Councillor Sandra GageCommittee Member, present
PG
Councillor Peter GardinerChair, present
CJ
Councillor Carole JonesCommittee Member, present
BK
Councillor Bill KnowlesVice-Chair, present
CK
Councillor Colin KreidewolfCommittee Member, present
JP
Councillor Jan ParryCommittee Member, present
BR
Councillor Bryony RudkinCommittee Member, present
BS
Councillor Barry StuddCommittee Member, apologies, sent representative
JC
Councillor John CarnallCommittee Member, present
BH
Councillor Bob HallCommittee Member, present
EH
Councillor Elizabeth HarsantCommittee Member, present

All 14 on the meeting page

On this subject at Ipswich

Search all
  1. PD/18/12 Item 4 - Application IP/19/00218/FULThis decision
  2. PD/26/01 Item 1 - Applications IP/25/00532/LBC & IP/25/00533/FULAgreed
  3. PD/26/02 Item 2 - Application IP/26/00014/FULApproved
  4. PD/25/07 Item 1 - Application IP/24/00118/FULApproved
  5. PD/25/02 Item 4 - Application IP/25/00070/FULApproved
  6. PD/25/02 Item 6 - Application IP/25/00302/FULDecided

More from Ipswich Planning & Development Committee

All decisions
MeetingDecisionOutcome
29 Jul 2026 Unconfirmed Minutes of Previous Meeting - 1 July 2026that the Minutes of the meeting held on 1 July 2026 be signed as a true record. Decided Open
29 Jul 2026 To Confirm or Vary the Order of Businessthat the Order of Business be confirmed as printed on the Agenda. Decided Open
29 Jul 2026 PD/26/03 Information for Councillors, including Planning Enforcement Updatethat the information for Councillors be noted. Noted Open
1 Jul 2026 Unconfirmed Minutes of Previous Meetingthat the Minutes of the meeting held on 3 June 2026 be signed as a true record. Decided Open
1 Jul 2026 To Confirm or Vary the Order of Businessthat the Order of Business be confirmed as printed on the Agenda. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies