RESOLVED that:- a) the comments and questions by Members be noted; and b) the emerging proposals for an Energy Park at Richborough and without prejudice to KCC’s position on future planning applications acknowledges the economic benefits for Kent linked to this development be noted with thanks.
Word for word from the decision Kent published for this meeting.Source: democracy.kent.gov.uk
Report to Economic Development Cabinet Committee, 3 pages
By: Mark Dance, Cabinet Member for Regeneration and Economic Development
Barbara Cooper, Director Economic Development
To: Economic Development Cabinet Committee- 21 September 2012
Subject: Richborough Energy Park
Classification: Unrestricted
Summary: This report details the emerging proposals for the development of an energy park at the site of the former Richborough Power Station. Some initial thoughts are offered on the economic benefits of this development to the local and wider Kent community.
1. Introduction
1.1The original Richborough Power Station in East Kent operated from 1962 to 1996, with final demolition being undertaken earlier this year. It originally burnt coal, but later converted to oil and bitumen. The station was also the site of an experimental wind turbine in 1989, which at 1MW was the biggest then installed anywhere in the UK. There is still an interconnector from the original power station in place which is now the grid link for the Thanet Offshore Wind Farm.
1.2Since 2000, ownership of the site has rested with a company called Richborough A Ltd. In 2007 Richborough A appointed BFL Management Ltd (BFL) to be the masterplan developers providing the expertise, infrastructure and services to bring the site back into use as a green energy park. When fully operational, the park could employ up to 100 full time staff.
2. The proposed development
2.1Biomass Combined Heat and Power (CHP)
A proposed biomass CHP plant (20-30MW) capable of producing enough electricity to power the equivalent of 20,000 homes together with heat for local businesses and agriculture. It would be fuelled using a sustainable woodchip source requiring approx. 300,000 tonnes per annum. The current wood resource annually available in Kent is approx. 60,000 tonnes per annum. There is potential to utilise some of this resource and to grow more. However, the availability of cheaper woodchip resources from Europe suggests the bulk of this requirement would need to be imported.
2.2Anaerobic Digester
A proposed anaerobic digester plant (3MW) capable of producing enough electricity to power the equivalent of 1500 homes. Anaerobic digestion is the process whereby green wastes can be converted into useful products by micro- organisms in the absence of air. Biomass is put inside sealed tanks and naturally occurring micro-organisms digest it, releasing methane that can be used to provide clean renewable energy. The residue material left over at the end of the process is rich in nutrients and can be used as a fertiliser. Almost any biomass can be used including food waste, crop residues, slurry and manure. The proposed plant would require 40,000 tonnes of green wastes per annum which it is anticipated could be sourced from the local area.
2.3Peaking Plant
A proposed gas or diesel fired peaking plant (20-30MW). A peaking plant is a backup power station that operates when there are high levels of demand for electricity (peak demand) or shortfalls of electricity supply. Due to the increase in renewable technologies in the UK such as wind, it is important that the National Grid secures a supply of backup power when these technologies cannot produce the required output. It is anticipated that a peaking plant at Richborough would operate between 100 and 300 hours over a year.
2.4Electricity Interconnector with Belgium
National Grid plans to use part of the site for an electricity interconnector with Belgium. The interconnector is a joint project between National Grid and Elia, the Belgian transmission system operator, and would be the first electricity link between the two countries. The link would allow power to flow in both directions and would be the third electricity interconnector connection between Kent and Europe after France and the Netherlands.
3. Planning considerations
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.