Kingston Town Neighbourhood Committee agreed this item on Tuesday 7 February 2012. Below is the council's own wording, with the papers it was decided on.
RESOLVED that 1. the following works are undertaken as part of the 2012/13 maintenance programme: Carriageway Schemes: Priority Location Details Estimated cost 1 Eden Street Brook Street to Lady Booth Road - deep plane and resurface £62,630 2 Beresford Road Whole road - plane and resurface £23,500 3 St Georges Road Whole road - plane and resurface £11,500 4 Park Rd/Tudor [name removed] sealing £10,000 Sub Total: £107,630 Footway Schemes: Priority Location Details Estimated cost 1 Fife Road North side - Replace existing blocks with “perfecta” small element paving £58,630 2 Fife Road South side - Replace existing blocks with “perfecta” small element £62,000 3 Cambridge Road Gloucester Road to eastern end of Cambridge Gardens - reconstruct bitmac. 120m of kerbing £41,000 4 Cambridge Road Remaining bitmac area to London Road - reconstruct bitmac £27,500 5 Eden Street No. 4 to St James Road - Replace existing blocks with York stone paving £32,500 SubTotal: £221,600 Total: £329,260 2. the reserve planned maintenance schemes are those listed: carriageways nos 5-8 and footways nos 6-8. REASON FOR DECISION To agree the maintenance works programme for 2012/13 to enable the programme to be prepared, managed and implemented.
Word for word from the decision Kingston upon Thames published for this meeting.Source: moderngov.kingston.gov.uk
It is RECOMMENDED that the Committee determine, within budgetary limits, the works they wish to be to be undertaken as part of the 2012/13 maintenance programme and to nominate reserve schemes, as appropriate, from the prioritised lists in Annex 1.
Reason for recommendations
To determine the maintenance works programme for 2011/12 to enable the programme to be prepared, managed and implemented.
Background
2011/2012 Programme
1. The following schemes, funded by the Neighbourhood’s Planned Maintenance Budget, have been completed as part of the 2011/2012 planned maintenance programme:-
Footway
Priority Location Details 1. Dysart Avenue Both sides – relay/replace slabs 2. Queens Road Relay/replace slabs where required 3. Portsmouth Road South Lane to Wight House – reconstruct bitmac
Carriageway
Priority Location Details 4. Latchmere Road Staunton Road to Roundabout – plane and resurface incl. replacement speed hump. 5. Barnfield Avenue Each end for 100m – plane and resurface 6. East Road Whole road – plane and resurface 7. St James Road Part funding to plane and resurface 2. The following are additional schemes, funded on a Boroughwide priority within the Neighbourhood:
Footway
Priority Location Details 8. Bath Passage Reconstruct 9. Ely Court/ Contribution to Neighbourhood Engineer’s access Washington Road improvements footpath
Carriageway
Priority Location Details 10. Barnfield Avenue Contribution to enable whole of road to be planed and resurfaced 11. St James Road Contribution to enable whole road to be planed and resurfaced
3. The following carriageway resurfacing schemes were funded by TfL as part of the LIP settlement:
Priority Location Details 1. A2043 Malden Road Cancelled due to pending Gas Main replacement 2. A2043 Malden Road Idmiston Road to Station Approach 3. Kingston Road Dickerage Road to South Lane - patching 4. Kingston Road Fountain Roundabout to South Lane – patching, part resurfacing, joint sealing 5. Kingston Road Short length at junction with St Johns Road 6. Cambridge Road Outside Cambridge Court (Pedestrian Crossing) 7. London Road Park Road Roundabout and to railway bridge
National Performance Indicators
4. Prior to 2008/09 the Council was obliged to publish Best Value Performance Indicators (BVPI’s) for Principal (223), Non-principal Classified and Unclassified Roads (224 a and b) and for Class 1 & 2 Footways (187). The prescribed method to use for the surveys and analysis was UKpms (United Kingdom pavement management system). BVPI 223, for Principal Road carriageways, was based upon the London-wide SCANNER survey commissioned by Transport for London (TfL) as part of the Road 2000 Project. BVPI 224 a & b and BVPI 187 UKpms surveys were commissioned and funded by the Borough.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Kingston Town Neighbourhood Committee at Kingston upon Thames and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.