Resolved
That the proposed creation of a cycle track with right of way on foot, and the implementation of a No Waiting 8am – 6pm Monday - Saturday restriction, as shown on the general plan at Appendix 'A' of the report, be approved.
Cabinet approved this item on Thursday 8 June 2023. Below is the council's own wording, with the papers it was decided on.
Resolved
That the proposed creation of a cycle track with right of way on foot, and the implementation of a No Waiting 8am – 6pm Monday - Saturday restriction, as shown on the general plan at Appendix 'A' of the report, be approved.
Cabinet is asked to approve the proposed creation of a cycle track with right of way on foot, and the implementation of a No Waiting 8am – 6pm Monday - Saturday restriction, as shown on the general plan at Appendix 'A'.
Detail
The East Lancashire Highways and Transport Masterplan includes creation of an East Lancashire Strategic Cycleway Network. The 'Valley of Stone' route forms part of this network, providing a cycle route between Rawtenstall to the north and the Lancashire boundary near Whitworth, to the south. The vast majority of the scheme consists of off-road and quiet back road sections, resulting overall in very low exposure to traffic and built-up areas. However, in some difficult locations such as this, many options have been investigated, but the only solution currently available to make cycle use safer is to create a short shared-use cycle track with right of way for pedestrians.
As such, a proposed 160 metre length between Holt Mill Road and Stansfield Road requires the following measures, as illustrated in Appendix 'A':
(a) Cycle Track – An existing footway will be replaced by cycle track with right of way on foot. The minimum width of this cycle track will be 3.0m (3.5m where obstructions exist); this is considered wide enough to be safely shared by pedestrians and cyclists.
(b) No Waiting – 8am - 6pm Monday - Saturday restrictions. These restrictions are required to prohibit parked motor vehicles from restricting use of the cycle track by its intended users. This will also improve forward visibility for cyclists and pedestrians as they share the facility.
Consultations
Formal advertising of the proposed waiting restriction and shared use cycle track was undertaken during January and February 2023, resulting in objections from one single respondent and a letter of support from Rossendale Borough Council.
Objections
The specific objections are listed below, however, the objector submitted a 9-page response in full, citing various observations and quoting national guidance (Appendix 'B' refers).
"We consider the proposals to be an attempt to squeeze a shared cycleway into an area that is unsuitable. We question whether the proposals fully conform with the recommendations of the Department for Transport Local Transport Note 1/20 (Cycle Infrastructure Design) dated July 2020 (LTN 1/20). See paragraphs 4.1 to 4.7 for more details.
The detriment to residents, particularly of 601, 603, 605 and 607 Bacup Road, outweighs the benefit to the small number of cyclists who use this stretch of the Valley of Stone cycleway.
We consider that the planners should accept that, despite their best efforts over a considerable length of time, there is currently no satisfactory solution to the “Buckhurst Plant Gap”.
We consider that it would be better to leave things as they are, until circumstances change, rather than spend money on an imperfect and ineffective plan". In response:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Appendix AAppendix A | 1.3 MB | Download |
PDF |
Appendix BAppendix B | 220 KB | Download |
PDF |
Proposed Shared Use Cycleway and Waiting Restriction, Bacup Road, WaterfootReport | 367 KB | DownloadRead as text |
PDF |
View item 9. as DOC 118 KBReport | 3 pages | Download |
Follow Cabinet at Lancashire & Rossendale and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 3 Sep 2026 | Minutes of the Meeting held on 2 July 2026That the minutes of the meeting held on 2 July 2026 be confirmed as a correct record and signed by the Chair. | Decided | Open |
| 3 Sep 2026 | Quarter 1 2026/27 Corporate Performance ReportThat, following consideration of the performance of the Council in Quarter 1 of 2026/27 against the ambitions set out... | Noted | Open |
| 3 Sep 2026 | 2026/27 Quarter 1 Financial Monitoring ReportThat i. The current forecast Revenue Budget overspend at Quarter 1 of £15.655m (1.18%), as detailed in Appendix 'A' o... | Noted | Open |
| 3 Sep 2026 | Ofsted Inspection of Lancashire Children's ServicesThat, following consideration of the outcome of the inspection, which confirmed that Lancashire's Children's Services... | Approved | Open |
| 3 Sep 2026 | SEND Capital ProjectThat i. Following consideration of the positive consultation responses, the prior approval of those projects through ... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.