Resolved
That, subject to delegation back to the Head of Regeneration and Policy for receipt of the outstanding County Ecology response and discussion with the applicant regarding a play area, and subject to referral to the Government Office, Planning Permission be granted, subject to the signing of a S106 agreement covering: 1. 20% provision of on-site 2 and 3 bed affordable houses (not apartments) (50/50 split between social rented and intermediate housing – even split of tenure across house sizes). (Note: Further discussion is required regarding clauses (2) and (3) of the case officer’s report regarding the £621,000 contribution to sustainable transport measures and £60,000 contribution for off-site open space improvements. If the bridge crossing is not possible, then Members requested that the sum of £600K should be diverted to (a) other transport measures and (b) education/school places. Members requested that there be a formal on-site play area rather than the £60K contribution to enhancing off-site facilities.) And the following conditions, as set out in the case officer’s report, subject to amendment of condition 31: 1. Standard planning permission timescale. 2. Development to accord with plans – list of approved plans. 3. Phasing plan. 4. At least 10% on site renewable energy production. 5. At least Level 3 of Code for Sustainable Homes. 6. Notwithstanding plans, samples of all external materials ( elevational treatment, roof materials, doors, window sills, lintels, garage doors, balconies, dormers), including colours and finishes to be submitted and agreed. 7. Surface materials to be agreed – samples required. 8. Refuse storage details. 9. Removal of PD rights. 10. Site boundary and plot boundary treatment. 11. Landscaping scheme to be agreed. 12. Native black poplars to be retained. 13. Arboriculture method statement and root protection areas to trees to be retained. 14. Provision of open space. 15. Habitat creation/enhancement and management plan. 16. Bat mitigation. 17. European eels – to be translocated . 18. Japanese knotweed and Canadian knotweed – to be eradicated. 19. Archaeological/building recording. 20. Wheel cleaning during construction. 21. Adoptable highway details required. 22. Off site highway works – traffic calming along New Quay Road traffic light controlled junction at Damside Street/Bridge Lane/Cable Street junction. 23. Protection of visibility splays. 24. Provision of garages and car parking. 25. Garage use restriction. 26. Cycle storage (for the apartments). 27. Foot/cycle links into Sycamore Grove. 28. Travel Plan – details required. 29. Separate drainage system. 30. Surface Water Management Plan. 31. Finished floor levels to include road levels of highways. 32. Flood evacuation ... view the full minutes text for item 183.