Resolved
Subject to no objections being raised by the Local Lead Flood Authority, and amended plans being received in relation to cycle storage and rooflights , that Planning Permission and consent for Relevant Demolition be granted, subject to delegation back to officers to re-consult Historic England, Conservation and neighbours on minor amendment, and subject to the following conditions, as set out in the case officer’s report, with amendments to conditions no. 12 and 14: 1. Standard 3 year timescale. 2. Development in accordance with approved plans. 3. Construction Management Scheme – including wheel cleaning, dust control, parking, storage of equipment/materials/waste (pre-demolition). 4. Contamination, including asbestos (pre-demolition). 5. Building recording of nos. 5 and 6 (pre-demolition). 6. Surface water drainage scheme, including interceptors (pre-construction). 7. Foul drainage scheme (pre-construction). 8. Flood evacuation procedure (pre-construction above ground level). 9. Materials – details of all elevational , rainwater goods, roof and surface materials required (pre-construction above ground level). 10. Security measures, including lighting (pre-construction above ground level). 11. Landscaping, including bird/bat boxes (pre-occupation). 12. Making good the highway to adoptable standards post demolition of no.6, closure of the existing access and the infilling of the barrel drop (pre-occupation) and creation of new access. 13. Refuse and cycle storage facilities (pre-occupation). 14. Finish floor level in line with the LLFA’s amended comments. 15. Noise mitigation measures (subject to confirmation from Environmental Health). 16. Hours of demolition/construction/fit-out, including deliveries – 0800-1800 Monday to Friday, and 0800-1400 Saturday only. Advice note – parking Zone A. And, subject to the following additional condition (suitably worded): 17. Turning place to be provided and retained.