Resolved
That, subject to the satisfactory resolution of the issues regarding Network Rail’s drainage assets, and delegation back to officers to gain detailed comments from the LLFA and County Highways, Planning Permission be granted subject to the signing and completing of a legal agreement (prior to the determination date) securing: · 40% (8 units) on site affordable housing provision (2 1-bed, 4 2-bed and 2 3-bed dwellings with a 50/50 split between social rented and intermediate housing); and · Education contribution of £79,444.28 (£61,047 for Bolton-le-Sands Primary School and £18,397.28 for Carnforth High School); and · Off site open space contribution of £25,000 (£10,000 for equipped play areas, £10,000 for children and young people, and £5,000 for parks and gardens) And, subject to the following conditions, as set out in the case officer’s report, with amendments to conditions no. 7 and 8 and removal of conditions no. 9, 16 and 17 and 18: 1. Standard time condition. 2. Development to be in accordance with approved drawings. 3. Notwithstanding plans, details of all external materials to be agreed (and samples where necessary). 4. Notwithstanding plans, details of all boundary treatments and footway surfaces to be agreed. 5. Foul and surface water to be drained on separate systems. 6. Surface water lifetime Management and Maintenance Plan. 7. Notwithstanding plans, no structures within 8m of an ordinary watercourse (the open/ culverted watercourse) and details of access to the open/ culverted watercourse and to Network Rail’s land required. 8. Landscaping maintenance scheme and ongoing management of Japanese knotweed. 9. Provision of adequate glazing and ventilation systems. 10. Scheme for noise mitigation to be submitted, agreed, implemented and maintained thereafter. 11. Construction Management Plan, including a scheme for control of dust and agreed route for all construction vehicles. 12. Hours of construction - 0800 – 1800 Monday to Friday, 0800 – 1400 Saturday. 13. Landscaping scheme to be provided (including replacement hedge planting where possible). 14. Maintenance of visibility to level crossing, including existing level crossing signage. And, subject to the following additional conditions (suitably worded): 15. Conditions as required by County Highways and deemed reasonable by the Local Planning Authority. 16. Details of excavation and/or earthworks work along the western boundary (to protect the stability of railway land).