Lancaster City Council
Planning Regulatory Committee, Monday 26 April 2021

Salt Ayre Sports Centre, Doris Henderson Way, Heaton With Oxcliffe Lancaster

Approved Planning 1 paper

Planning Regulatory Committee approved this item on Monday 26 April 2021. Below is the council's own wording, with the papers it was decided on.

Item120

Resolved

That the application be approved subject to the conditions set out in the Committee Report: 1. Standard 3 year timescale. 2. Approved plans. 3. Installation and Retention of Fencing.
Word for word from the decision Lancaster published for this meeting. Source: committeeadmin.lancaster.gov.uk

Follow this further

Built from Lancaster's papers

What the report saysPro

Report to Planning Regulatory Committee

Agenda Item A12

Application Number 21/00325/FUL

Installation of air source heat pumps and associated infrastructure and Proposal erection of fencing and compound area

Salt Ayre Sports Centre, Doris Henderson Way, Heaton With Oxcliffe Application site Lancaster

Applicant Lancaster City Council

Agent Will Swarbrick

Case Officer [name removed] No

Summary of Recommendation Approval

(i) Procedural Matters

This form of development would normally be dealt with under the Scheme of Delegation. However, Lancaster City Council is the applicant, and as such the application must be determined by the Planning Regulatory Committee.

1.0Application Site and Setting

1.1The site of this installation is at the eastern end of the sports centre building furthest from the main vehicular entrance. It is currently part of the paved pedestrian area between the building and car park.

1.2It is wholly contained within the grounds of the sports centre. The nearest housing is approximately 70m away on Brindle Close with the sports centre building between and approximately 82m away on Brindle Mews separated by public open space and mature trees along the route of a footpath.

2.0Proposal

2.1The proposal is to site 3 air source heat pumps (ASHP) and 2 thermal buffer tanks on a concrete plinth in a compound measuring approximately 186 sq.m in area. Each ASHP is contained within a 7.2m x 2.2m x 2.4m high box constructed of metal finished in goosewing grey. On top of each box are 8 fans pointing upwards. Each ASHP is connected to the building by two pipes. The thermal buffer tanks are cylindrical with a diameter of 1.8m and 2m high and also finished in goosewing grey metal. The compound will be irregular in shape with maximum dimensions of 20.3m x 11.3m formed by solid timber feather edged fencing 2.6m high with pedestrian and vehicle access gates. The timber will be pre-treated and left in its natural colour.

2.2The ASHP system will provide the sports centre with full heating capacity to replace the existing dilapidated natural gas boilers. The ASHPs work by absorbing heat from the air into a fluid at low temperature. The fluid passes through a compressor which increases its temperature. The higher temperature is then transferred to the heating and hot water circuits in the leisure centre. The system

Page 1 of 4 CODE 21/00325/FUL runs on electricity with efficiencies of between 200% and 400% depending on the external ambient temperature.

2.3An application has also been received to site solar photo voltaic (PV) panels on part of the former Salt Ayre landfill site west of the sports centre (application number 21/00256/FUL). The aim is to have the solar PV provide the majority of the ASHP's daytime electricity consumption in summer, autumn and spring but only a small percentage in winter and during the night. At times where there is insufficient electricity generation from the Solar PV, or if the solar PV scheme does not go ahead, the ASHPs will run off mains electricity.

2.4Without the solar PV, the ASHP system will initially provide over a 25% reduction in the sports centre’s carbon emissions, which will only increase as the National Grid is decarbonised, so that even without further interventions, the sports centre should be 100% green by 2050 (assuming government targets are reached). With the solar PV installed along with the ASHPs the initial carbon emission reduction will be over 50%.

2.5Capital cost for both the ASHPs and PV are being funded by Salix. If the PV side of the project does not to go ahead, the Salix funding for the ASHPs would not be affected. The only implication for the ASHP project, should the solar PV not be built, is an increase in electricity costs in running the sports centre.

3.0Site History

3.1A number of relevant applications relating to the sports centre have previously been received by the Local Planning Authority. These include:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Salt Ayre Sports Centre, Doris Henderson Way, Heaton With Oxcliffe LancasterReport 163 KB DownloadRead as text

At this meeting

Whole meeting

On this subject at Lancaster

Search all
  1. Salt Ayre Sports Centre, Doris Henderson Way, Heaton With Oxcliffe LancasterThis decision
  2. The Shortfall of Income at Salt Ayre Leisure CentreNoted
  3. Salt Ayre Landfill Site Salt Ayre Lane LancasterDecided
  4. Salt Ayre Landfill Site Salt Ayre Lane LancasterDecided
  5. Salt Ayre Landfill Site Salt Ayre Lane LancasterDecided
  6. Salt Ayre Landfill Site Salt Ayre Lane Lancaster LancashireAgreed

More from Lancaster Planning Regulatory Committee

All decisions
MeetingDecisionOutcome
1 Sep 2026 Bus Station Central Drive MorecambeResolved : That prior approval for demolition is required and is granted. Approved Open
1 Sep 2026 Car Park Nelson Street LancasterResolved : That the application be approved subject to the following conditions: 1. Development in accordance with Ap... Approved Open
1 Sep 2026 Auction Mart Car Park Thurnham Street LancasterResolved : That the application be approved subject to an additional condition regarding additional ground investigat... Approved Open
1 Sep 2026 Delegated ListThat the report be noted. Noted Open
27 Jul 2026 Land at Ashton Road LancasterResolved : That the application be approved subject to the following conditions: · the satisfactory completion of a L... Approved Open