(Key decision): (1) To agree that funds up to the level already earmarked for the project within the Council’s capital programme be released to support seafront lighting reinstatement works (2) To agree a waiver of the Council’s Contract Procedure Rules for necessary works in connection with reinstatement of the lighting and award the contract for works to the Council’s term electrical contractor, GM Monk; (3) To authorise the Accountable Officer to sign a waiver of the Council’s Contract Procedure Rules to GM Monk in connection with these works.
Word for word from the decision Lewes published for this meeting.Source: democracy.lewes-eastbourne.gov.uk
Report of: Ian Fitzpatrick, Deputy Chief Executive and Director of Regeneration and Planning
Cabinet member: Councillor Jonathan Dow, Cabinet member for climate change
Ward(s): Meads and Devonshire
Purpose of report: For Cabinet to note costs for the reinstatement of the seafront lighting and agree that funds up to the level already earmarked for the project within the Council’s capital programme be released to support reinstatement works.
Decision type: Key Decision
Officer (1) To agree that funds up to the level already earmarked recommendation(s): for the project within the Council’s capital programme be released to support seafront lighting reinstatement works;
(2) To agree a waiver of the Council’s Contract Procedure Rules for necessary works in connection with reinstatement of the lighting and award the contract for works to the Council’s term electrical contractor, GM Monk;
(3) To approve the Accountable Officer to sign a waiver of the Council’s Contract Procedure Rules to GM Monk in connection with these works.
Reasons for Works are required in order to restore the seafront lighting recommendations: and reduce future maintenance costs.
Contact Officer(s): Name: Mark Langridge-Kemp Post title: Head of Property, Delivery and Compliance E-mail: [email protected] Telephone number: 01323 415876 1 Introduction
1.1Eastbourne’s seafront lighting consists of lamp columns and festoon lighting; it plays an important part in the promenade’s charm as well as supporting seafront safety during the night. The Council is responsible for the majority of the lighting between Western Lawns and Fisherman’s Green, stretching 1.5 miles. ESCC is responsible for lighting and columns adjacent to the roadway, EBC is responsible for the festoon lighting between these columns. There are a mixture of styles of light columns along the seafront with most being cast iron decorative columns with the lighting being fed from underground cables via a number of junction boxes and feeder pillars.
1.2Considerable parts of the lighting have been impacted by underground faults, rendering large sections of festoon lighting and a good proportion of the lamp columns for which the Council is responsible inoperative. Due to the nature of the fault, a temporary solution bringing additional cabling and lighting to the existing structures has been required in order to restore lighting to the area. However, a permanent solution now needs to be put in place to fully restore the lighting and ensure its future integrity.
2 Proposal
2.1The temporary solution currently in place has not been able to bring back into use the existing lamp columns and does not address the problems long-term. It is proposed that a scheme of repair works is undertaken, Phase 1 would look at replacing all the underground cabling between the Pier and the Wish Tower; the columns along the Middle Parade will be repaired or replaced with new columns to the same casting as the existing. Phase 2 would look at works between the pier and Fisherman’s Green.
2.2It is proposed that all new lighting in the initial phase will be delivered by energy efficient LED fittings to replace the existing halogen and sodium fittings. This has the advantage of lower energy consumption, smaller cable size and longer lamp life which will reduce running, installation and maintenance costs.
2.3The lighting design of columns and globes interlaced with festoon lighting is likely to be retained, using new lamp heads and festoons and refurbished globes. Control gear and protective devices will be upgraded as part of the project which will ensure the electrical installation is brought into compliance with electrical safety regulations.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies