Resolved that – (i) the progress and planned implementation of the project contained within the report submitted, be noted; (ii) authority be granted to proceed with the preferred option 3 and appoint 2020 Liverpool to develop detailed designs so that funding applications and agreements can be progressed; and (iii) authority be granted to progress the early design work for this scheme up to a limit of £100,000 subject to approval of an allocation of City Council general resources for this scheme within the 2004/05 capital programme.
Word for word from the decision Liverpool published for this meeting.Source: councillors.liverpool.gov.uk
1.1.1 This report has been prepared to advise Members of the outline scheme proposals for the Enhanced Message Signs (EMS) & Car Park Guidance System (CPGS) project. It seeks authority from members to proceed with the preferred scheme option 3 as identified in the previous feasibility study by Atkins. It also seeks authority to appoint 2020 Liverpool to undertake the detailed design, cost management and procurement of the preferred scheme. Development of the project scope and design will allow detailed funding applications to be submitted and contributions to be secured from private funding sources. A further committee report will be submitted in due course for Members’ approval of the detailed scheme.
1.1.2 Commencement of detailed design is now critical in enabling statutory approvals, such as message library and sign type to be obtained prior to commencement on site and to maintaining the momentum of the overall City Centre Movement Strategy (CCMS) programme. It is intended to implement as much of the scheme as soon as possible to assist in minimising the congestion whilst CCMS and Merseytram works are undertaken in the City Centre.
1.2Consultants Commission
1.2.1 Atkins have recently completed a study into the provision of EMS & CPGS that can be progressively implemented as the CCMS progresses. The alterations and improvements to the Highway Network will lead to a change in the way that vehicles access areas and attractions within the City centre.
1.2.2 Part of Atkins brief was to examine how vehicles will access/egress the City centre and how “through” traffic can be positively encouraged to use the strategic Highway Network, both during the various stages of the CCMS implementation and once the CCMS has been fully implemented. A further objective of their commission was to examine how EMS could be used to advise drivers of works/incidents on the highway that could cause delays to their journeys, and how EMS could be used as a strategic routeing tool in aiding drivers avoid such delays.
1.2.3 The proposals have been developed to outline design stage and there is now a requirement to appoint consultants to prepare detailed design and cost information and obtain all necessary statutory approvals. The consultants will also assume responsibility for site management and health and safety supervision for the works once full funding has been secured. The estimated cost of fees to progress the design and cost information, and manage the works is £300,000.
1.2.4 The anticipated scope of works for the scheme is:
o Establish final locations for Enhanced Message Signs CPGS Variable Message Signs (VMS) and static signs o Carryout electrical & communication surveys for EMS & CPGS. o Finalise proposals for appropriate communications network. o Investigate & Propose hardware & software options for running both EMS/CPGS. o Produce all associated detailed design drawings, plans & standard details. o Produce detailed costings and implementation programme (staggered where appropriate). o Produce Tender Documents for construction of both EMS & CPGS projects o Supervision and administration of the contracts.
2. Background and Project Context
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.