a) That the refined vision and objectives for the Integrated Transport Strategy as the basis for officers to work with Kent County Council and other transport providers in achieving improvements to the transport systems in Maidstone be approved; and b) That the work programme as set out in in paragraph 1.3.42 of the report of the Head of Planning and Development for developing the ITS to a full draft document and public consultation in the summer of 2014 be approved.
Word for word from the decision Maidstone published for this meeting.Source: meetings.maidstone.gov.uk
1.3.1 This section provides the background and context to show how the ITS has developed since the previous draft ITS went out for public consultation in August 2012. Information is provided on the actions taken to review the ITS and refine the direction of the transport strategy and produce a new vision and objectives. It also identifies a programme of further work now required to develop a full draft ITS.
The ITS is a joint document, prepared by both Maidstone Borough Council and Kent County Council. The existing traffic situation in Maidstone is one of significant congestion on our roads. It is accepted that traffic congestion will increase as the borough grows, so the ITS is designed to minimise this increase and to mitigate the associated impacts on the local economy and air quality. The ITS is also directed towards improving road user safety and education.
1.3.2 Transport Strategy Development
1.3.3 The previous draft ITS was based on the results of multi-modal transport modelling commissioned by Kent County Council (KCC) and Maidstone Borough Council (MBC). The model was used in 2011 and early 2012 to test the impact of planned housing and employment growth, together with background traffic growth, on the local transport network. The previous local plan housing target of 10,080 (to 2026) was used. The baseline data that informed the model was collected in 2007 at inner and outer cordon points around the Maidstone urban area. The data showed that the vast majority of vehicular traffic crossing the outer cordon in the morning peak hour was heading to destinations within the town itself, usually passing through the town centre to destinations including the secondary schools and the hospital. On this basis, the modelling strongly indicated that the provision of strategic highway capacity around the town (for example, the South East Maidstone Strategic Link scheme) would not represent a cost-effective solution to existing and forecast traffic congestion in and around the town centre.
1.3.4 These considerations, together with the significant peak period congestion and poor air quality across the urban area, require the ITS to complement one of the core principles in the NPPF, which is to make the fullest possible use of public transport, walking and cycling. The ITS therefore focuses primarily on demand management measures (such as park and ride services, bus priority measures and enhanced walking and cycling infrastructure), combined with targeted highway capacity improvements at strategic junctions. This will enable people to make informed choices about how and when they travel to and from the town centre and other destinations in the borough.
1.3.5 KCC and MBC jointly identified three transport strategy options to address the impact of forecast trip growth over the local plan period; namely, Option 1: ‘Do Minimum’, Option 2: ‘Radial P&R Sites’ and Option 3: ‘North / South P&R Spine’.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.