Resolved
That the report be noted.
To: Maidstone Joint Transportation Board
By: KCC Highways, Transportation and Waste
Date: 22nd July 2015
Subject: Highway Works Programme 2015/16
Classification: Information Only
Summary: This report updates Members on the identified schemes approved for construction in 2015/16
1. Introduction
This report provides an update and summarises schemes that have been programmed for delivery in 2015/16
Footway and Carriageway Improvement Schemes – see Appendix A
Drainage Repairs & Improvements – see Appendix B
Street Lighting – see Appendix C
Appendix D – Transportation and Safety Schemes – See Appendix D
• Casualty Reduction Measures – See Appendix D1
• Integrated Transport Schemes – See Appendix D2
Developer Funded Works – Appendix E
Bridge Works – see Appendix F
Traffic Systems – see Appendix G
Combined Member Fund – see Appendix H
Conclusion
1. This report is for Members information.
Contact Officers:
The following contact officers can be contacted on 03000 418181
Carol Valentine West Kent Highway Manager Richard Emmett Maidstone District Manager Sue Kinsella Street Lighting Manager Katie Lewis Drainage Manager Alan Casson Resurfacing Manager Tony Ambrose Structures Manager Toby Butler Traffic Systems Appendix A – Footway and Carriageway Improvement Schemes
The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged and the residents will be informed by a letter drop to their homes.
Machine Resurfacing – Contact Officer [name removed] Name Parish Extent of Works Current Status
From its junction with Willington Street Maidstone Beauworth Park to Completed Chapman Avenue
From its junction with Willington Street Maidstone Madginford Road to Completed A20 Ashford Road
Wheatsheaf PH to A274 Sutton Road Maidstone Completed Longfield Place
The Green to Ash Ware Street Bearsted Completed Tree Gardens
From its junction with Works programmed Willington Street Maidstone Northumberland Road for Summer to Deringwood Drive Holidays 2015
Works to be Florence Road Maidstone Full Length programmed
Footway Improvement - Contact Officer [name removed] and Road Name Parish Current Status Description of Works From its junction with Ash Grove to the Poplar Grove Maidstone junction with Maple Works completed Avenue (Footway Reconstruction) Various sections from the junction with Howland Road to outside Property No. South Road Marden To be programmed 10 South Road (Footway Reconstruction – both sides) Entire Length North Down Staplehurst (Footway To be programmed Reconstruction)
Entire Length Tomlin Close Staplehurst (Footway To be programmed Reconstruction)
Entire Length Brooklands Headcorn (Footway To be programmed Reconstruction)
From its junction with To be programmed Redwall Lane to the (Works are subject junction with Wheelers Linton Hill Linton to specialist Lane adjacent to the contractor bus stop (Footway assessment) protection treatment)
To be programmed Entire Length (Works are subject Norrington Road Maidstone (Footway protection to specialist treatment) contractor assessment)
From its junction with To be programmed New Cut Road to its (Works are subject junction with Ashford Road Maidstone to specialist Willington Street contractor (Footway protection assessment) treatment)
Surface Treatments – Contact Officer [name removed] Surfacing Schemes
From its junction with Boxley Road/Pilgrims Way Boxley Styles Lane to Hairpin To be programmed bends
From its junction with Hunton Hill to its Programmed for 16th East Street Hunton junction with Stonewall July 2015 Chainhurst
From its junction with Programmed for 23rd Eyhorne Street Hollingbourne Tilefields to its junction July 2015 with A20
From its junction with Greenway Court Road Programmed for 23rd Eyhorne Street Hollingbourne to the war memorial by July 2015 the school From its junction with Boughton Brishing Lane to its Heath Road Monchelsea/Chart Currently on site junction with A274 Sutton Sutton Road
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Report of KCC Highways, Transportation and Waste: Highway Works Programme 2015/16Report | 182 KB | DownloadRead as text |
Follow Maidstone Joint Transportation Board at Maidstone and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 25 Mar 2026 | Exempt itemsThat all items on the agenda be taken in public as proposed. | Decided | Open |
| 25 Mar 2026 | Minutes of the Meeting Held on 21 January 2026That the Minutes of the meeting held on 21 January 2026 be approved as a correct record and signed. | Approved | Open |
| 25 Mar 2026 | Maidstone Joint Transportation Board Work ProgrammeRESOLVED : That 1. Item 1: Updates on the junctions within the MITP, and Item 2: Allocation of Community Infrastructu... | Decided | Open |
| 25 Mar 2026 | Maidstone Integrated Transport PackageThat the report be noted. | Noted | Open |
| 25 Mar 2026 | ANPR Cameras in Town CentreThat the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.