CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Maidstone Borough Council
Maidstone Joint Transportation Board, Wednesday 22 July 2015 at 5.00pm

Report of Head of Planning and Development - Results of the VISUM Transport Modelling

Decided Committee 5 papers

Maidstone Joint Transportation Board decided this item on Wednesday 22 July 2015. Below is the council's own wording, with the papers it was decided on.

Item89

Resolved

That this Board recommends to Kent County Council’s Cabinet Member for Highways, Transportation and Waste and to Maidstone Borough Council’s Strategic Planning, Sustainability and Transportation Committee that a combination of DS2 and DS3 form the basis of the Integrated Transport Strategy for Maidstone to underpin the Local Plan. This is with ... view the full minutes text for item 89.
Word for word from the decision Maidstone published for this meeting. Source: meetings.maidstone.gov.uk

Follow this further

Built from Maidstone's papers

What the report saysPro

Report to Maidstone Joint Transportation Board

Maidstone Transport Model Local Plan Option Testing Model Characteristics

• Original base model developed by Jacobs in 2007 • Strategic VISUM model • Aims to provide an indicative representation of reality for a ‘typical’ day (e.g. during school term time and no major incidents on the network) • Multi-modal assessment (excluding peds & cyclists) • Assesses traffic demand and distribution on model network • Not intended to asses finer detail of individual junctions • Model input data updated to reflect 2014 traffic conditions • Updated base model performance sense-checked against DfT criteria • Nationally accepted method of providing supporting evidence to Local Plan development processes. Model Characteristics – Key Outputs

• Weekday AM and PM peak periods modelled • Travel demand • total vehicle movements within modelled area • Overall network performance • Total travel distance (vehicle km) • Total travel time (vehicle hours) Forecast Scenarios 1. 2031 Do Minimum (DM) 17,381 homes • Original Housing & employment allocations • Maidstone Gyratory scheme only 2. 2031 Do Something 1 (DS1) – presented to JTB Dec ‘14 • Original Housing & employment allocations 17,381 homes • Package of transport improvements • Highway capacity improvements • Leeds – Langley link road 3. 2031 Do Something 2 (DS2) • Original Housing & employment allocations 17,381 homes • Package of transport improvements • Highway capacity improvements • Public transport improvements • Increased walking and cycling • Increased parking costs 4. 2031 Do Something 3 (DS3) • Revised housing allocation/distribution 16,247 homes • Package of transport improvements (distribution • Highway capacity improvements adjusted) • Leeds – Langley link road • Public transport improvements • Increased parking costs Forecast Scenarios

Transport Interventions 2031 2031 2031 Do Something 1 Do Something 2 Do Something 3

Bridge gyratory Bridge gyratory Bridge gyratory

Highway capacity improvements Highway capacity improvements Highway capacity improvements (identified at JTB workshop + M20 J7, (identified at JTB workshop + M20 J7, (identified at JTB workshop) A20/New Cut & Hermitage Ln ped signals) A20/New Cut & Hermitage Ln ped signals)

Leeds – Langley Link Road Leeds – Langley Link Road

Increased bus frequency on radial routes Increased bus frequency on radial routes (every 7 mins) (every 10 mins) Increased town centre parking costs Increased town centre parking costs (50% at public CPs) + No change in bus (50% at public CPs) + No change in bus fares fares New bus routes (Notcutts – bus station & circular route to hospital from town centre)

Additional P&R site at Linton Corner

Walking & cycling mode shares increased by approx. 8.5% Car occupancy increased (from 1.23 to 1.29) Overall Network Performance

2031 2031 2031 2031 • AM peak - maximum travel AM Peak 2014 DM DS1 DS2 DS3 distance and travel time Travel Distance 122,000 144,500 146,700 126,900 135,500 • 2031 DM – worst case (veh km) impact in travel time % difference 18% +20% +4% +11% vs 2014 • 2031 DS1 - increase in Travel Time demand on the network (veh hours) 8,300 11,400 10,800 8,500 8,800

results in over 20% increase % difference 38% +30% +3% +7% in travel distance, over 30% vs 2014

increase in vehicle hours 2031 2031 2031 2031 PM Peak 2014 • 2031 DS2 - reduced vehicle DM DS1 DS2 DS3

trips = reduced pressure on Travel Distance 113,400 137,500 140,200 125,700 136,500 network (veh km) % difference • 2031 DS3 - lower housing = vs 2014 21% +24% +11% +20% reduced vehicle trips = Travel Time 7,000 10,000 9,500 8,100 8,600 reduced pressure on network (veh hours) % difference 42% +35% +15% +22% vs 2014 DS2 Transport Strategy Considerations

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Forecasting Report Maidstone VISUM Transport ModelAppendix 1 3.7 MB Download
PDF
Forecasting report Non-technical Summary Maidstone VIOSUM Transport ModelAppendix 2 1 MB Download
PDF
Presentation from AMEYReport 2.7 MB DownloadRead as text
PDF
Report of Head of Planning and Development: Results of the VISUM Transport ModellingReport 124 KB Download
PDF
Urgent Update = Maidstone VISUM Transport ModellingReport 47 KB Download

At this meeting

Whole meeting

Who was there

21 of 23 attended
RA
Councillor Richard AshCommittee Member, apologies, sent representative
RB
Councillor Robert BirdCounty Councillor, apologies
MA
Councillor Mrs Annabelle BlackmoreSubstitute Member, present as substitute
GB
Ms Geraldine BrownCommittee Member, apologies, sent representative
DB
Councillor David BurtonChairman, present
PC
Councillor Paul CarterCounty Councillor, present
IC
Councillor Ian ChittendenCounty Councillor, apologies
GC
Councillor Gary CookeCounty Councillor, present
BC
Councillor Brian ClarkCounty Councillor, present
MC
Councillor Mike CumingCommittee Member, present
DD
Councillor Dan DaleyCounty Councillor, present
CE
Councillor Clive EnglishSubstitute Member, present as substitute

All 23 on the meeting page

On this subject at Maidstone

Search all
  1. Report of Head of Planning and Development - Results of the VISUM Transport ModellingThis decision
  2. Report of the Head of Planning and Development: Headcorn Neighbourhood Plan - Examiner's ReportDeferred
  3. Report of the Head of Planning and Development: Boughton Monchelsea and Linton Conservation AreasApproved
  4. Report of the Head of Planning and Development: E-Planning - Parish Copies of ApplicationsDecided
  5. Report of the Head of Planning and Development: Housing White PaperAgreed
  6. Report of the Head of Planning and Development: South Eastern Rail Franchise Public ConsultationApproved

More from Maidstone Maidstone Joint Transportation Board

All decisions
MeetingDecisionOutcome
25 Mar 2026 Exempt itemsThat all items on the agenda be taken in public as proposed. Decided Open
25 Mar 2026 Minutes of the Meeting Held on 21 January 2026That the Minutes of the meeting held on 21 January 2026 be approved as a correct record and signed. Approved Open
25 Mar 2026 Maidstone Joint Transportation Board Work ProgrammeRESOLVED : That 1. Item 1: Updates on the junctions within the MITP, and Item 2: Allocation of Community Infrastructu... Decided Open
25 Mar 2026 Maidstone Integrated Transport PackageThat the report be noted. Noted Open
25 Mar 2026 ANPR Cameras in Town CentreThat the report be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies