Report of Head of Planning and Development - Results of the VISUM Transport Modelling
DecidedCommittee5 papers
Maidstone Joint Transportation Board decided this item on Wednesday 22 July 2015. Below is the council's own wording, with the papers it was decided on.
That this Board recommends to Kent County Council’s Cabinet Member for Highways, Transportation and Waste and to Maidstone Borough Council’s Strategic Planning, Sustainability and Transportation Committee that a combination of DS2 and DS3 form the basis of the Integrated Transport Strategy for Maidstone to underpin the Local Plan. This is with ... view the full minutes text for item 89.
Word for word from the decision Maidstone published for this meeting.Source: meetings.maidstone.gov.uk
Maidstone Transport Model Local Plan Option Testing Model Characteristics
• Original base model developed by Jacobs in 2007 • Strategic VISUM model • Aims to provide an indicative representation of reality for a ‘typical’ day (e.g. during school term time and no major incidents on the network) • Multi-modal assessment (excluding peds & cyclists) • Assesses traffic demand and distribution on model network • Not intended to asses finer detail of individual junctions • Model input data updated to reflect 2014 traffic conditions • Updated base model performance sense-checked against DfT criteria • Nationally accepted method of providing supporting evidence to Local Plan development processes. Model Characteristics – Key Outputs
• Weekday AM and PM peak periods modelled • Travel demand • total vehicle movements within modelled area • Overall network performance • Total travel distance (vehicle km) • Total travel time (vehicle hours) Forecast Scenarios 1. 2031 Do Minimum (DM) 17,381 homes • Original Housing & employment allocations • Maidstone Gyratory scheme only 2. 2031 Do Something 1 (DS1) – presented to JTB Dec ‘14 • Original Housing & employment allocations 17,381 homes • Package of transport improvements • Highway capacity improvements • Leeds – Langley link road 3. 2031 Do Something 2 (DS2) • Original Housing & employment allocations 17,381 homes • Package of transport improvements • Highway capacity improvements • Public transport improvements • Increased walking and cycling • Increased parking costs 4. 2031 Do Something 3 (DS3) • Revised housing allocation/distribution 16,247 homes • Package of transport improvements (distribution • Highway capacity improvements adjusted) • Leeds – Langley link road • Public transport improvements • Increased parking costs Forecast Scenarios
Transport Interventions 2031 2031 2031 Do Something 1 Do Something 2 Do Something 3
Leeds – Langley Link Road Leeds – Langley Link Road
Increased bus frequency on radial routes Increased bus frequency on radial routes (every 7 mins) (every 10 mins) Increased town centre parking costs Increased town centre parking costs (50% at public CPs) + No change in bus (50% at public CPs) + No change in bus fares fares New bus routes (Notcutts – bus station & circular route to hospital from town centre)
Additional P&R site at Linton Corner
Walking & cycling mode shares increased by approx. 8.5% Car occupancy increased (from 1.23 to 1.29) Overall Network Performance
2031 2031 2031 2031 • AM peak - maximum travel AM Peak 2014 DM DS1 DS2 DS3 distance and travel time Travel Distance 122,000 144,500 146,700 126,900 135,500 • 2031 DM – worst case (veh km) impact in travel time % difference 18% +20% +4% +11% vs 2014 • 2031 DS1 - increase in Travel Time demand on the network (veh hours) 8,300 11,400 10,800 8,500 8,800
results in over 20% increase % difference 38% +30% +3% +7% in travel distance, over 30% vs 2014
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.