Planning Committee, Thursday 16 July 2026 at 6.00pm

25/500111/FULL Land at Forsham Lane, South of Park Farm, Forsham Lane, Sutton Valence, Kent

Decided Planning 4 papers

AI summaryMaidstone Planning Committee grants permission for 11.6 hectares of polytunnels at Forsham Lane, Sutton Valence, by 12 votes to 1, with strengthened drainage, landscape and ecology conditions.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeDecided12 for, 1 against, 0 abstentions
MoneyNot stated
What happens nextHead of Planning gets delegated powersTo settle or amend conditions and informatives
Who it affectsForsham Lane, Sutton Valence, Kent11.6 hectare soft fruit polytunnel site

What was decided

Planning permission was granted for polytunnels on 11.6 hectares of agricultural land, subject to conditions and a new condition requiring a gap between polytunnels and ground level so surface water can pass underneath. Report 1.06, 1.24

Conditions covering surface water drainage, the proposed landscape plan, the landscape management plan, and the habitat management and monitoring plan were strengthened to address silt removal, hedge and poplar windbreak width and height, and other safeguards. Report P7

The Head of Planning and Economic Development was given delegated authority to settle or amend any necessary conditions or informatives. Report P47

Why

Officers concluded that the technical drainage information and Kent County Council Flood and Water Management's response showed the proposal was acceptable subject to conditions, with no support from the council's specialist consultee for refusal and exposure to appeal costs if refused. Report 1.05, P7

The visual and landscape harm from polytunnels was weighed against the agricultural need for soft fruit production, the reversible nature of the structures, and their place alongside existing agricultural buildings and polytunnel developments. Report 1.21, 1.22, 1.23

Officers found no significantly harmful cumulative impact because, due to separation distances, topography and existing landscaping, the full extent of existing and proposed polytunnels cannot be seen from any single viewpoint. Report 1.27, 1.28

What happens next

The applicant must submit and gain approval for detailed surface water drainage, landscape, ecological and waste management schemes before the polytunnels are first used or before development commences, as set out in the conditions. Report P52, P53, P57, P59, P60, P62, P66

If the site is not used for soft fruit production for more than two years in a row, all polytunnels, equipment and covering material must be removed and the land restored. Report P51

The development must begin within three years of the date of permission. Report P48

Options considered

  • Chosen: Grant permission with strengthened conditions and a new condition on polytunnel/ground gap for surface water. Officers found the development acceptable subject to conditions, with no technical consultee objection Report 1.06, P7
  • Rejected: Refuse permission. Kent County Council Flood and Water Management confirmed the drainage details are acceptable, and refusal would be hard to defend at appeal with costs exposure Report 1.05, P7

Implications

  • Legal: If refused, the council would have had no evidence to defend the decision at appeal and would have faced costs, with no support from its own specialist consultee. Report P7
  • Equalities: The Public Sector Equality Duty under section 149 of the Equality Act 2010 was considered and the proposals were not found to undermine the duty's objectives. Report 1.29
  • Climate: The site is between two areas designated as landscapes of local value, and the northern area of the polytunnels falls within a landscape of local value. Report P36
  • Risk: The Habit Management and Monitoring Plan runs for 30 years from completion of development, requiring ongoing monitoring reports to the local planning authority. Report P62
  • Other: If granted together with adjacent approvals, polytunnel coverage in the wider area would total around 41 hectares. Report 1.26

Who and where

  • The applicant, who grows soft fruit Report 1.21, 1.23
  • Residents and road users of Forsham Lane and users of Public Right of Way KT|KH|508 Report P19, P23, P27
  • Kent County Council Flood and Water Management (Local Lead Flood Authority) Report 1.02, 1.03, 1.04
  • Ecology on site, including badgers, bats, great crested newts, reptiles, breeding birds and hedgehogs Report P60, P61, P64, P65

Timeline

  • 10th November 2025: Biodiversity Net Gain Report (24035 V4) prepared by Corylus Ecology was issued. Report P63
  • 1 February to 30 November each year: Polytunnel covering can be installed from 1 February, fully covered only between 1 March and 30 November, and must be fully removed by 30 November. Report P11, 1.08
  • 19 March 2026: Application was deferred at the Planning Committee to allow further drainage information, the formal KCC Flood and Water Management response, dates of polytunnel installation and removal, and an assessment of cumulative landscape and visual impact on views of the Greensand Ridge. Report 1.01
  • April 2026: Flood Risk Assessment and Drainage Strategy report (33229/CS) was submitted by the applicant. Report 1.03, P49
  • 16 July 2026: Planning Committee resolved to grant permission with conditions, by 12 votes to 1.
  • Within three years of the date of this permission: The development must be begun. Report P48
  • Within twelve months of first use: Photographic evidence of installed bird and bat boxes must be submitted to the local planning authority. Report P64
  • 30 years from completion of development: Habitat Management and Monitoring Plan period applies, with monitoring reports to the local planning authority. Report P62

Plain English for the jargon

  • Polytunnel: A tunnel-shaped, semi-circular structure covered in clear polythene, used to grow soft fruit and protect crops.
  • LVIA (Landscape and Visual Impact Assessment): A study that assesses the effects of a development on landscape character and on views from specific viewpoints.
  • Biodiversity Net Gain (BNG): A requirement that development delivers a measurable improvement in habitat for wildlife compared with the site before development.
  • SuDS (Sustainable Drainage System): Drainage designed to manage surface water runoff close to where it falls, for example through grassy areas, swales or permeable surfaces.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item58

Resolved

That 1. Permission be granted subject to the conditions and informative set out in the report and urgent update report with: An additional condition to maintain a gap between the polytunnels and the ground level to allow surface water to pass below the tunnels; The strengthening of condition 5 (Service Water Drainage) to include management of the removal of silt buildup; The strengthening of condition 9 (Proposed Landscape Plan), condition 10 (Landscape Management Plan) and condition 13 (Habitat Management and Monitoring Plan) to guarantee the safeguards of the Landscape and Ecological Management Plan, including the width and height of the hedges and poplars acting as windbreak screens. 2. The Head of Planning and Economic Development be given delegated powers to be able to settle or amend any necessary planning conditions and/or informative in line with the matters set out in the recommendation and as resolved by the Planning Committee. Voting : 12 – For 1 – Against 0 – Abstentions
Word for word from the decision Maidstone published for this meeting. Source: meetings.maidstone.gov.uk

Follow this further

Built from Maidstone's papers

What the report saysPro

Report to Planning Committee

Background

1.01A decision was deferred on this application at the on 19 March 2026 committee meeting to allow for the following: (a) Further detailed drainage information to fully access flood risk and surface water management. (b) to receive the formal response from the Kent County Council Flood and Water management (Local Lead Flood Authority); (c) Clarification to be provided on the dates and timings relating to the installation and removal of the polytunnels from the site; (d) Further assessment of the cumulative landscape and visual impact of the development of poly tunnels to the views of the Greensand Ridge.

1.02These four matters are now considered in turn

(a) Further detailed drainage information to fully access flood risk and surface water management; (b) To receive the formal response from the Kent County Council Flood and Water management (Local Lead Flood Authority)

1.03The applicant has submitted an additional detailed Flood Risk Assessment. KCC Flood and Water Management team have been consulted and have noted the following: “With the polytunnels in place for much of the year, there is potential for surface water runoff to increase when compared to the existing greenfield situation. The Flood Risk Assessment and Drainage Strategy report (33229/CS – April 2026) details measures to mitigate these impacts. It is understood that surface water falling on the polytunnels will run off to the ground, as the tunnel sheeting does not extend fully to the ground, allowing water to flow beneath adjacent tunnels”.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
25-500111-FULL Land at Forsham Urgent Update Appendix rev 2Appendix 597 KB Download
PDF
25/500111/FULL AppendixAppendix 1.3 MB Download
PDF
25/500111/FULL Committee ReportReport 323 KB DownloadRead as text
PDF
25/500111/FULL Land at Forsham Lane, South of Park Farm, Forsham Lane, Sutton Valence, KentPlan 723 KB Download

At this meeting

Whole meeting

Who was there

13 of 15 attended
MC
Councillor Maureen CleatorCommittee Member, present
AD
Councillor Anne DawesVisiting Member, in attendance
DG
Councillor Donna GreenanCommittee Member, present
TH
Councillor Tony HarwoodCommittee Member, present
MN
Councillor Mark NaghiVice-Chairman, present
JP
Councillor John PerryCommittee Member, present
PR
Councillor Paddy RiordanCommittee Member, present
CR
Councillor Claudine RussellCommittee Member, present
DS
Councillor Denis SpoonerCommittee Member, present
MS
Councillor Michael SummersgillVisiting Member, in attendance, virtual
AS
Councillor Allison SweetmanCommittee Member, present
ST
Councillor Stephen ThompsonCommittee Member, present

All 15 on the meeting page

On this subject at Maidstone

Search all
  1. 25/500111/FULL Land at Forsham Lane, South of Park Farm, Forsham Lane, Sutton Valence, KentThis decision
  2. 26/501735/FULL Land within Brewer Street, Union Street and St Faith's Street Junctions with Week Street, Maidstone, KentDecided
  3. 24/505235/FULL Land West of Pattenden Lane, Marden, KentAgreed
  4. 25/502050/FULL Land Known As Redhill Stables, Lenham Road, Headcorn, Kent, TN27 9LGRefused
  5. 24/502235/FULL Mathurst Farm, Land West Of Goudhurst Road, Staplehurst, KentAgreed
  6. 25/501933/FULL Land South Of Ashford Road, Harrietsham, Kent, ME17 1WHAgreed

More from Maidstone Planning Committee

All decisions
MeetingDecisionOutcome
20 Aug 2026 Exempt ItemsRESOLVED : That all items on the agenda be taken in public as proposed. Decided Open
20 Aug 2026 Minutes of the meeting held on 16 July 2026RESOLVED : That the Minutes of the meeting held on 16 July 2026 be approved as a correct record and signed subject to... Approved Open
20 Aug 2026 24/500007/full - demolition of 5no.RESOLVED : 1. That subject to: A. The prior completion of a legal agreement in such terms as the Head of Legal Partne... Agreed Open
20 Aug 2026 26/501191/full - replacement of the existing mobile home with a permanent residential self-build dwelling - mobile home at wierton hill farm, wierton hill, boughton monchelsea, kentRESOLVED : That permission be refused for the following reasons: 1. The development by way of its scale, massing, hei... Refused Open
20 Aug 2026 25/505189/full - retrospective application for the construction of a single storey fitness studio within the curtilage of park cottage - park cottage, the street, boxley, kentRESOLVED : 1. That permission be granted subject to the conditions set out in the report. 2. That the Head of Plannin... Decided Open