Resolved
RESOLVED that the response to the A12 Chelmsford to A120 widening consultation, as set out in APPENDIX 1 to the report be approved, subject to the amendments to be made following the meeting of the Planning and Licensing Committee.
Planning and Licensing Committee approved this item on Thursday 2 March 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the response to the A12 Chelmsford to A120 widening consultation, as set out in APPENDIX 1 to the report be approved, subject to the amendments to be made following the meeting of the Planning and Licensing Committee.
1.1The purpose of this report is to consider the Council’s response to the A12 Chelmsford to the consultation into the A120 Widening. A draft response is set out in APPENDIX 1 to this report.
1.2The consultation period runs until 3 March 2017.
That the response to the A12 Chelmsford to A120 widening consultation, as set out in APPENDIX 1 be approved.
3. SUMMARY OF KEY ISSUES
3.1Highways England is consulting on proposals to improve the A12 between Chelmsford and the A120 at Marks Tey. The improvements are programmed to start in 2020 and are in response to general traffic congestion, environmental and safety factors.
3.2At peak travel times much of the A12 between J19 and J25 is nearing capacity. Highways England state that ‘forecasts show that by 2038, the road will operate above the capacity it was ever designed to handle if no improvements are made’. As the road reaches capacity, congestion increase, which will not benefits communities along the A12 corridor, and access to Maldon District, which relies on the A12 as a major strategic route for residents, visitors and businesses. A congested A12 will not benefit the aim to attract new businesses to and create 2,000 new jobs in Maldon District. The aim of the A12 widening scheme is to increase the road’s capacity to improve its long term safety and reliability.
3.3Highways England have identified six key benefits of the proposals: A more free flowing network; A safe and serviceable network; Supporting economic growth;
Agenda Item no. 16 Our Vision: Working in Partnership to make the Maldon District a better place to live, work and enjoy An improved environment; A more accessible and integrated network; Customer satisfaction.
3.4Four options are being consulted upon:
3.4.1 Option 1:
3.4.1.1 Widening the existing A12 to three lanes in both directions from Junctions 19 to 25 (Boreham to Marks Tey). This will potentially will be the most disruptive option for residents and businesses located close to the A12. It will bring the road closer to existing premises, private accesses to the road will be closed and diverted, Highways England acknowledge that this option ‘requires the acquisition of most properties’. It is not clear whether this option would include the same opportunity as the off line options for junction improvements that improve access to and from Maldon District
3.4.2 Option 2:
3.4.2.1 Widening of the A12 to three lanes in both directions from Junctions 19 to 25, with 2 new bypasses between junctions 22 and 23 (Witham and Kelvedon) and between Junctions 24 to 25 (Feering to Marks Tey). The two lengths of the A12 that are constrained by at-grade private accesses, with existing safety and capacity issues, are proposed to be bypassed in this option. This will reduce impacts on residents and businesses along the A12 corridor along the two stretches most affected by direct private access.
3.4.2.2 Due to the constraint of the railway line running parallel to the north of the A12, the bypasses are shown as running to the south of the existing road. The bypasses will generally take traffic away from residential properties.
3.4.2.3 A bypass between J22-23 (also proposed in Option 3) will circumvent Rivenhall End and should enable safer access to and from Braxted Road, as the new bypass will enable a new junction to be designed.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
A12 Chelmsford to A120 Widening: Highways England ConsultationReport | 142 KB | DownloadRead as text |
PDF |
Appendix 1Appendix 1 | 92 KB | Download |
PDF |
Appendix 2Appendix 2 | 695 KB | Download |
Follow Planning and Licensing Committee at Maldon and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 5 Sep 2019 | Minutes of the last meetingRESOLVED that the Minutes of the meeting of the Committee held on 18 July 2019 be approved and confirmed. | Approved | Open |
| 5 Sep 2019 | Local Development Plan Implementation - Maldon and Heybridge Central Area MasterplanRESOLVED that the contents of the report be noted. | Noted | Open |
| 5 Sep 2019 | Approval to Adopt the local lists of Local Heritage Assets for the Parishes of Heybridge and SouthminsterRESOLVED that the Lists of Local Heritage Assets for the Parishes of Heybridge and Southminster be approved for forma... | Approved | Open |
| 5 Sep 2019 | Draft Essex Coast Recreational Disturbance Avoidance and Mitigation Strategy (RAMS) Supplementary Planning Document (SPD)RESOLVED (i) That the draft Essex Coast Recreational disturbance Avoidance Mitigation Strategy Supplementary Planning... | Approved | Open |
| 5 Sep 2019 | Chelmsford Draft Local Plan Main Modifications ConsultationRESOLVED that Chelmsford City Council be informed that Maldon District Council had no objections to the Schedule of M... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.