RESOLVED that this application be APPROVED subject to the following conditions: 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2 The development hereby permitted shall be carried out in complete accordance with the approved drawings as follows: · PL01rev.A · PL02 · PL03 · PL04rev.A · PL05rev.A · PL06rev.A · PL07rev.A · PL08rev.A · Arboricultural Impact Assessment 3 No development above slab level shall take place until written details or samples of all materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out using the materials and details as approved. 4 No development ... view the full minutes text for item 476.
Word for word from the decision Maldon published for this meeting.Source: democracy.maldon.gov.uk
APPROVE subject to the conditions (as detailed in Section 8 of this report).
2. SITE MAP
Please see below.
Our Vision: Sustainable Council – Prosperous Future 3. SUMMARY
3.1Proposal / brief overview, including any relevant background information
3.1.1 The application site is located to the south of Cromwell Lane, which is a single track, unmade private road. There is also a means of access to the site for pedestrians from the south located between two properties which front Beeleigh Road. The site is currently undeveloped and is a field which slopes upwards from north to south and which contains grass/scrub and is enclosed by hedgerows/trees and post and rail fencing.
3.1.2 The existing development along Cromwell Lane is residential with that to the east, towards Market Hill, is located within the settlement boundary of Maldon and those to the north and west, along with the application site itself (except for the southerly section of the footpath referred to above) are outside of the town’s settlement boundary. The existing residential development within the vicinity of the site varies in appearance, size and age but that to the north and west is lower density and sporadic compared to that to the east within generously sized plots. The dwelling to the east is a bungalow.
3.1.3 The site is within the Chelmer and Blackwater Navigation Conservation Area and adjoins the western boundary of the Maldon Conservation Area. The site is in close proximity to the River Chelmer which is located beyond the residential properties to the north which are opposite the site.
3.1.4 There is a Public Right of Way which runs along Cromwell Lane along the site’s frontage. This footpath links Fullbridge to the east with the rural areas to the west of Maldon. There is currently no vehicular access to the site.
3.1.5 Planning permission is sought for a new, three-bedroom dwelling which would be single storey and partially built into the sloping ground levels. The dwelling would be sited 21.2m from the site’s frontage with Cromwell Lane and 65.8m (at the closest point) from the rear boundaries of the dwellings to the south which front Beeleigh Road and back onto the site.
3.1.6 The dwelling would measure a minimum of 10.5m and a maximum of 19.95m in depth, with a width of 26.9m. There would be a paved area to the rear contained by a retaining wall beyond which would be further amenity space accessed via a staircase from this paved area. The dwelling would have a flat, sedum roof (with two roof lanterns) with a maximum height above the proposed ground levels of 2.3m. There would be a double garage to the side of the proposed dwelling. The similar proposal was granted planning permission by planning committee in 2014 (reference 13/01001/FUL), although this planning permission has now expired.
3.1.7 The external materials would consist of stone walling, horizontal cedar boarding and render with a sedum roof. Windows and doors would be painted timber except for the bi-folding doors proposed to the rear.
3.1.8 Ground levels within the site could be regraded through cut and fill so the building would be set into the ground by around 1.4m, but it is stated as part of the application that no spoil would need to be removed from the site. The cross sections submitted show that the maximum reduction/increase in ground levels would be around 2m.
3.1.9 A vehicular access would be created in the north-eastern corner of the site.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Appointment of Vice-ChairpersonRESOLVED that Councillor A M Lay be elected Vice-Chairperson of the Central Area Planning Committee for the Municipal...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.