North Western Area Planning Committee, Wednesday 4 February 2026 at 7.30pm

25/00524/FUL - Land Adjacent Barrow Cottage, Bassetts Lane, Woodham Walter

Approved Planning 1 paper

AI summaryMaldon District Council approves a detached two bedroom bungalow on land off Bassetts Lane, Woodham Walter, replacing an existing campsite, despite the site being outside the settlement boundary.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedFull planning permission granted, ten conditions applied
Money£169.45 RAMS contribution paidPer-dwelling tariff for Essex Coast mitigation
What happens nextDevelopment must begin within three yearsStandard time-limit condition attached
Who it affectsSite off Bassetts Lane, Woodham WalterOpen countryside outside settlement boundary

What was decided

The committee approved the application for a detached two bedroom bungalow with associated landscaping and parking, replacing the existing campsite use on the site. Report P10, P11

Approval was granted subject to ten planning conditions covering timing, plans, materials, drainage, cycle parking, travel packs, biodiversity, lighting, and removal of permitted development rights. Report P113, P114, P115, P116, P119, P120, P125

Why

Officers judged the site acceptable in principle because the council cannot demonstrate a five year housing land supply (currently 2.7 years), triggering the NPPF presumption in favour of sustainable development under paragraph 11d. Report P28, P29, P30

The bungalow was considered to cause less traffic and neighbour impact than the lawful campsite use, with traditional design and rural materials seen as in keeping with Bassetts Lane. Report P14, P15, P37, P57, P58

No harm was identified on residential amenity, highways safety, flooding, or ecology subject to planning conditions, and the parish council's design objection was not upheld. Report P64, P70, P71, P82, P103

What happens next

The development must be begun before the expiration of three years from the date of the permission, with surface water drainage, biodiversity enhancement strategy, and lighting scheme details to be agreed in writing before works above ground level or slab level. Report P114, P116, P121, P122, P124

Before first occupation, cycle parking, foul drainage connection, and residential travel information packs must be provided, and no extensions or outbuildings are permitted without further consent. Report P118, P119, P120, P125

The money

  • £169.45 Essex Coast RAMS per-dwelling developer contribution, paid by the applicant during the application Report P94

Options considered

  • Chosen: Approve the bungalow as recommended by officers. Five year housing land supply shortfall and the site's less intensive use than the existing campsite justified approval under NPPF paragraph 11d Report P1, P28, P29, P30, P40

Implications

  • Financial: The applicant has paid the £169.45 Essex Coast RAMS tariff; the council collects a CIL or equivalent self-build exemption is noted as the proposal is a self-build dwelling exempt from BNG. Report P94, P95
  • Legal: The site lies outside any defined settlement boundary and is a departure from LDP Policy S8, but the tilted balance under NPPF paragraph 11d applies because the council cannot demonstrate a five year housing land supply. Report P13, P26, P28, P29, P30
  • Equalities: No equalities assessment issues are raised in the report.
  • Climate: Surface water drainage must manage 1 in 100 year events plus 40% climate change allowance, and greenfield run-off rates apply. Report P116
  • Risk: Permitted development rights for extensions, alterations, and outbuildings are removed via condition to protect character and amenity. Report P125
  • Other: Ten objections from residents and Woodham Walter Parish Council were received on design, sustainability, precedent, and highway grounds; officers did not consider any of these sufficient to outweigh the scheme's benefits. Report P103, P111, P112

Who and where

  • The applicant, who proposed replacing an existing campsite with a self-build two bedroom bungalow Report P10, P11, P95
  • Neighbouring residents at Elwy Cottages and Barrow Cottage on Bassetts Lane Report P7, P63
  • Woodham Walter Parish Council, which objected on design grounds Report P103
  • Essex County Council Highways, satisfied subject to cycle parking and travel pack conditions Report P70, P105
  • European designated coastal sites, mitigated through the paid RAMS contribution Report P85, P88, P94

Timeline

  • 21 July 2025: Site notices posted advertising the application Report P109
  • 24 July 2025: Newspaper advertisement in Maldon and Burnham Standard Report P110
  • 12 August 2025 / 14 August 2025 / 28 August 2025: Expiry dates for site notice and newspaper consultation responses Report P109, P110
  • 4 February 2026: North Western Area Planning Committee resolves to approve the application
  • Within three years of the permission: Development must be begun to retain the permission Report P114

Plain English for the jargon

  • LDP: Maldon District Local Development Plan 2014 to 2029, the adopted development plan for the district
  • NPPF: National Planning Policy Framework, the national planning policy document
  • Tilted balance: The presumption in favour of sustainable development in NPPF paragraph 11d, applied where the council cannot demonstrate a five year housing land supply
  • RAMS: Essex Coast Recreational disturbance Avoidance and Mitigation Strategy, requiring a per-dwelling tariff to mitigate effects on European coastal sites
  • SuDS: Sustainable Drainage Systems, used to manage surface water run-off
  • BNG: Biodiversity Net Gain, a requirement to deliver measurable biodiversity improvements; the proposal is exempt as a self-build
  • Prior notification / Prior Approval: A process under permitted development allowing specified uses, such as the temporary campsite, without full planning permission
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item480

Resolved

RESOLVED that this application be APPROVED subject to the following conditions: 1. The development hereby permitted shall be begun before the?expiration?of three years from the date of this permission.? 2. The development hereby permitted shall be carried out?in accordance with?the following approved plans?stated?on the Decision Notice. ? 3 The materials used in the construction of the development hereby approved shall be as set out within the application form/approved plans?and supporting statement.? ? 4 No development works above ground level shall occur until details of the surface water drainage scheme to serve the development shall be?submitted?to and agreed in writing by the local planning authority. The agreed scheme shall be implemented prior to the first occupation of the development. The scheme shall ensure that for a minimum:? 1) The development should be able to manage water on site for 1 in 100-year events plus 40% climate change allowance.? 2) Run-off from a greenfield site for all storm events that have a 100% chance of occurring each year (1 in 1 year event) inclusive of climate change should be no higher than 10/ls and no lower than 1/ls. The rate should be restricted to the 1 in 1 greenfield rate or equivalent greenfield rates with long term storage minimum rate 1l/s) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield) or 50% betterment of existing run off rates on brownfield sites (provided this does not result in a runoff rate less than greenfield)? You are advised that in order to satisfy the soakaway condition the following details will be required:- details of the area to be drained, infiltration rate (as determined by BRE Digest 365), proposed length, width and depth of soakaway, groundwater level and whether it will be rubble filled.? Where the local planning authority accepts discharge to an adopted sewer network you will?be required?to provide written confirmation from the statutory undertaker that the discharge will ... view the full minutes text for item 480.
Word for word from the decision Maldon published for this meeting. Source: democracy.maldon.gov.uk

Follow this further

Built from Maldon's papers

What the report saysPro

Report to North Western Area Planning Committee

Recommendation

APPROVE subject to the conditions (as detailed in Section 8 of this report)

2. SITE MAP

Please see overleaf.

Our Vision: Where Quality of Life Matters 3. SUMMARY

3.1Proposal / brief overview, including any relevant background information

Site Description

3.1.1 The application site is located to the western side of Bassetts Lane on a parcel of land situated between the residential properties of Elwy Cottages and Barrow Cottage. There are sporadic residential dwellings which extend along Bassetts Lane in a linear pattern, in a variety of sizes and architectural styles.

3.1.2 The site lies outside of any defined settlement boundary and within the open countryside, albeit due to its position relative to surrounding development the site is considered to be semi-rural in character – with residential properties extending to the north and south along both sides of the road - and a wide expanse of open agricultural fields to the west.

The Proposal

3.1.3 Planning permission is sought for the cessation of use of the land as a campsite and construction of a detached 2 bedroom bungalow with associated landscaping and parking.

3.1.4 The proposed dwelling would be sited to the centre of the plot, with a front driveway set behind the existing front hedgerow, accessed via an existing gate which currently provides access to the land for camping use. The proposed dwelling would be of a relatively rural design finished in weatherboarding with clay peg tile roof. A large rear garden is retained, with all existing planting at the site retained and enhanced as part of the proposal.

Conclusion

3.1.5 The application site is located outside of a defined settlement boundary and is within the open countryside, and as such the proposed development would constitute a departure from the local plan. However, in the absence of a 5 year housing land supply, the “titled balance” as set out in paragraph 11d of the NPPF applies unless “any adverse impacts of doing so would significantly and demonstrably outweigh the benefits, when assessed against the policies in this Framework taken as a whole, having particular regard to key policies for directing development to sustainable locations, making effective use of land, securing well- designed places and providing affordable homes, individually or in combination”’

As explained within the report, although the location of the development being outside of any settlement boundary would be contrary to Policy S8 of the LDP, options do exist for bus services to the end of Bassetts Lane to reach facilities further afield. In addition, the proposed development of a single dwelling, when compared to the existing campsite use, would result in a reduced number of potential private car trips to and from the site, as well as associated reduction in impact upon neighbouring occupiers in this regard. For this reason the principle of development is considered on balance acceptable subject to compliance with all other policies contained within the LDP.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
25/00524/FUL: Land Adjacent Barrow Cottage, Bassetts Lane, Woodham WalterReport 577 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

9 of 15 attended
MF
Councillor Mark F L Durham CCChairperson, present
ME
Councillor Maddie E ThompsonVice-Chairperson, present
JC
Councillor Jade C HughesCommittee Member, present
SJ
Councillor Simon J N MorganCommittee Member, present
CP
Councillor Clive P MorleyCommittee Member, present
RH
Councillor Richard H SiddallCommittee Member, present
EL
Councillor Emma L StephensCommittee Member, present
SW
Councillor Sue WhiteCommittee Member, absent
LL
Councillor Lisa L WiffenCommittee Member, present
MJ
Michael JohnsonCouncil Staff, present
DH
Devan HearnahOfficer, expected
EH
Emma HolmesOfficer, expected

All 15 on the meeting page

On this subject at Maldon

Search all
  1. 25/00524/FUL - Land Adjacent Barrow Cottage, Bassetts Lane, Woodham WalterThis decision
  2. 25/00997/FUL Land adj to Oak Corner Cottage, Southend Road, Woodham Mortimer CM9 6TGRefused
  3. 26/00296/FUL - Land At 1 Imperial Avenue, Mayland, CM3 6AQApproved
  4. 26/00238/FUL - Land Between Beightons And Barrow Cottage, Bassetts Lane, Woodham WalterApproved
  5. 25/00730/FUL - Land West of 8 Captains Wood Road, Great TothamApproved
  6. 25/00362/FUL - Land at 1 Oxley Cottage, 1 Oxley Hill, Tolleshunt D’Arcy, EssexApproved

More from Maldon North Western Area Planning Committee

All decisions
MeetingDecisionOutcome
9 Sep 2026 Minutes of the last meetingRESOLVED that the Minutes of the meeting of the Committee held on 12 August 2026 be approved and confirmed. Approved Open
9 Sep 2026 26/00157/FUL Caravan At Toad Hall, Station Road, Cold NortonRESOLVED that the application be APPROVED subject to the following conditions: 1 The development hereby permitted sha... Approved Open
9 Sep 2026 25/00421/FULM Rosedale, Lea Lane, Great Braxted, Witham, Essex, CM8 3ERRESOLVED (i) that the application be APPROVED and authority be delegated to the Director of Place, Planning and Growt... Approved Open
12 Aug 2026 Minutes of the last meetingRESOLVED that the Minutes of the meeting of the Committee held on 15 July 2026 be approved and confirmed. Approved Open
12 Aug 2026 25/00972/FUL Agricultural Building at Oak Nursery, Hackmans Lane, PurleighRESOLVED that the application be APPROVED subject to the following conditions: 1. The development hereby permitted sh... Approved Open