Resolved
RESOLVED that the application be APPROVED subject to the following conditions: 1 The development hereby permitted shall be begun before the expiration of three years from the date of this permission. 2 The development hereby permitted shall be carried out in accordance with the following approved plans stated on the Decision Notice. 3 The materials used in the construction of the development hereby approved shall be as set out within the application form, approved plans and supporting statement. 4 No development works above ground level shall occur until details of the surface water drainage scheme to serve the development shall be submitted to and agreed in writing by the local planning authority. The agreed scheme shall be implemented prior to the first occupation of the development. The scheme shall ensure that for a minimum: 1) The development should be able to manage water on site for 1 in 100 year events plus 40% climate change allowance. 2) Run-off from a greenfield site for all storm events that have a 100% chance of occurring each year (1 in 1 year event) inclusive of climate change should be no higher than 10l/s and no lower than 1l/s. The rate should be restricted to the 1 in 1 greenfield rate or equivalent greenfield rates with long term storage minimum rate 1l/s or 50% betterment of existing run-off rates on brownfield sites provided this does not result in a runoff rate less than greenfield. 5 Prior to first occupation of the dwelling hereby approved, the foul drainage for the dwelling must either be connected to mains drainage or a small sewage treatment plant of adequate capacity for the dwelling. Any small sewage treatment plant installed must discharge treated effluent in a manner which complies with the General Binding Rules at the time of installation. 6 No unbound material shall be used in the surface treatment of the vehicular access within 6 metres of the highway boundary. 7 Prior to first ... view the full minutes text for item 105.