That Cabinet: A. Agree to adopt the Electric Vehicle Charging Infrastructure (EVCI) Strategy and Action Plan 2025-2030. B. Delegate authority to the Executive Director for Environment, Civic Pride & Climate in consultation with the Cabinet Member for Transport and Cleaner Streets to make minor amendments to the Electric Vehicle Charging Infrastructure (EVCI) Strategy and Action Plan 2025-2030. That Cabinet: A. Agree to adopt the Electric Vehicle Charging Infrastructure (EVCI) Strategy and Action Plan 2025-2030. B. Delegate authority to the Executive Director for Environment, Civic Pride & Climate in consultation with the Cabinet Member for Transport and Cleaner Streets to make minor amendments to the Electric Vehicle Charging Infrastructure (EVCI) Strategy and Action Plan 2025-2030.
Word for word from the decision Merton published for this meeting.Source: democracy.merton.gov.uk
Draft Electric Vehicle Charging Infrastructure Strategy and Action Plan 2025-2030
Page 1 DRAFT ELECTRIC VEHICLE CHARGING INFRASTRUCTURE STRATEGY AND ACTION PLAN 2025-2030 1 Contents Glossary Electric Vehicle (EV): electrically propelled 03 Glossary road vehicles that need to be charged by con- necting the vehicle to an electricity source. In this document the term EV covers all Plug-in 04 Cabinet Member Foreword vehicles (PiVs) including, • Battery Electric Vehicles (BEV) contain a fully electric motor 05 Executive Summary • Plug-in Hybrid Electric Vehicles (PHEV) which contain an internal combustion en- gine as well as an electric battery motor. 06 Introduction and Policy Background
07 Merton’s Vision for EVs Electric Vehicle Charging Infrastructure (EVCI) the electrical equipment required to charge EVs. 08 On-street Residential Chargepoints Electric Vehicle Charging Points (EVCPs) Page 2
10 EV only parking bays
EVCP Power Rating- The rate at which 11 Rapid Chargepoints power can be delivered by in kilowatts (kW). The higher power a charging point, the faster it will charge a vehicle, but can be limited by 12 Chargepoint Design, Siting and Accessibility the vehicle charging capability. EVCP Power Categories referred to in this document are: • Slow- 3-5kw 13 Chargepoint Tariffs and Customer Experience • Standard- up to 7kw, • Fast- 22kw 14 Home Charging • Rapid- over 50kw • Ultra rapid- over 120kw 15 Cross Pavement Charging
Chargepoint Operator (CPOs) Companies 16 Electric Car Clubs that supply, install, operate and maintain publicly accessible EVCPs.
17 Progress Monitoring
18 Action Plan
DRAFT ELECTRIC VEHICLE CHARGING INFRASTRUCTURE STRATEGY AND ACTION PLAN 2025-2030 2 DRAFT ELECTRIC VEHICLE CHARGING INFRASTRUCTURE STRATEGY AND ACTION PLAN 2025-2030 3 Cabinet Member Foreword Executive Summary We are committed to the provision of a sustainable Merton supports the transition to Electric Vehicles transport network that supports a greener, cleaner, (EVs) as part of the delivery of a sustainable and more connected future for Merton. The switch transport network. The switch to EVs will make to electric vehicles (EVs) is a key part of this, a vital contribution to reducing the vehicular creating economic opportunities and delivering emissions that contribute towards climate change cleaner air for Merton’s residents. and poor air quality. With the UK Government committing to phasing The Electric vehicle strategy sets out how the out the sale of new petrol and diesel cars by 2030, council will enable the delivery of the publicly it is vital that we have the right infrastructure in accessible EV charging infrastructure necessary place to give people the confidence to make the to support the significant projected growth in EVs switch to an EV when they are ready to. Merton up to 2030. It sets out key principles to ensure is proud to be at the forefront of this transition, that the provision of EV charging infrastructure is with the 12th highest number of charging points in comprehensive, sustainable, affordable the UK and over 95% of our households without and accessible. parking living within a 5-minute walk of one. A key focus of the strategy is on the provision of This strategy sets out our ambition for the next five on-street public EV chargepoints in residential years. It details how we will continue delivering a areas to support the half of properties in Merton Page 3
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Morden Town Centre RegenerationCabinet is asked to: A. Note the progress made on the Programme since Cabinet approved the procurement of a developme...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.