Jun13Thursday

Executive

Thursday 13 June 2024, 10.00amHeld 891 days ago.
Council ChamberCorby Cube, George Street, Corby, NN17 1QG. Open to the public.
15 items, 33 papersAbout 34 MB, led by Carbon Management Plan Annual Report.
No exempt items listedEvery item is due to be heard in public.
This meeting was held13 June 2024
15items
33papers
12decisions
–exempt
Running order, sized by papersItem 640 to 654
ReportsProcedureExempt parts

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item. Carbon Management Plan Annual Report is the main business.

640
Procedure

Apologies for absence

641
Report

Minutes of the Meetings Held on 18th April 2024 and 16th May 2024

Decision: RESOLVED that the Executive agreed the minutes of the meetings held on 18 th April 2024 and 16 th May 2024 as true and accurate records of the meetings. Decision page

2 papers, 344 KBSearch inside with Pro
ReportMinutes of the Meeting Held on 16th May 2024158 KBCopy on its way
ReportMinutes of the Meetings Held on 18th April 2024 and 16th May 2024186 KBCopy on its way
642
Procedure

Members' Declarations of Interest

643
Procedure

Notifications of requests to address the meeting

644
Report

Performance Indicator Report 2023/24 (Period 12 - March 2024)

Decision: RESOLVED That the Executive noted the performance of the Council as measured by the available indicators at Period 12 (March / Q4) 2023/24, set out in Appendices A and B to this report. Reason for recommendations – to better understand the Council’s performance as measured by Key Performance Indicators as at Period 12 (March / Q4) 2023/24. Alternative Options Considered: Reporting performance data on a less frequent basis is an option however monthly reporting is useful as the Council continues... Decision page

3 papers, 2.4 MBSearch inside with Pro
AppendixAppendix A: Appendix A2 MBCopy on its way
AppendixAppendix B: Appendix B178 KBCopy on its way
ReportPerformance Indicator Report 2023/24 (Period 12: March 2024)206 KBCopy on its way
645
Report

Traffic Signals Obsolescence Grant Funding 2024/25 and 2025/26

Decision: RESOLVED KEY DECISION T hat the Executive accepted and noted the addition of £552,859 of new funding from the Department for Transport to the capital programme to be spent across 2024/25 and 2025/26 to be used to deliver the upgrades to traffic signal equipment. Reason for Recommendation: This additional funding will add to the existing capital budgets for highway maintenance and enable the programme of replacing obsolete traffic signal replacement to commence. Alternative Options Considered... Decision page

3 papers, 412 KBSearch inside with Pro
AppendixAppendix A: Appendix A111 KBCopy on its way
AppendixAppendix B: Appendix B110 KBCopy on its way
ReportTraffic Signals Obsolescence Grant Funding 2024/25 and 2025/26191 KBCopy on its way
646
ReportMain business

Carbon Management Plan Annual Report

Decision: RESOLVED KEY DECISION That the Executive approve the Carbon Management Plan (CMP) Annual Report at Appendix A . Reasons for Recommendations: The CMP Annual Report sets out progress on the key areas of focus for the Council to achieve its target to be carbon neutral by 2030. The CMP Annual Report supports the Council’s ambition for climate change mitigation as set out in the Corporate Plan. Whilst the projects within the CMP require financial investment, they will provide both operational... Decision page

2 papers, 9.2 MBSearch inside with Pro
AppendixAppendix A: Appendix A9 MBCopy on its way
ReportCarbon Management Plan Annual Report197 KBCopy on its way
647
Report

Procurement of Supporting Carers Services

Decision: RESOLVED KEY DECISION That the Executive: a) Agreed to commence an open tender procurement process for a Supporting Carers Service. b) Delegated authority to the Executive Member for Adults, Health and Wellbeing in consultation with the Executive Director for Adults, Health Partnerships and Housing, to take any further decisions and actions required to conclude this procurement and award the contract. Reason for Recommendations: The recommended approach ensures compliance with the Care Act 2014... Decision page

4 papers, 427 KBSearch inside with Pro
AppendixAppendix A: Appendix A83 KBCopy on its way
AppendixAppendix B: Appendix B46 KBCopy on its way
AppendixAppendix C: Appendix C114 KBCopy on its way
ReportProcurement of Supporting Carers Services184 KBCopy on its way
648
Report

Smoke Free Generation Grant Funding

Decision: RESOLVED KEY DECISION That the Executive: a) Accepted into the budget the five-year Smoke Free Generation grant funding awarded to the Public Health team and agreed to it being spent in accordance with the grant restrictions to support reducing smoking prevalence in North Northamptonshire as set out in this report. b) Delegated authority to the Executive Member for Adults, Health and Wellbeing in consultation with the Director of Public Health and Wellbeing to undertake the commissioning... Decision page

3 papers, 845 KBSearch inside with Pro
AppendixAppendix A: Appendix A476 KBCopy on its way
AppendixAppendix B: Appendix B112 KBCopy on its way
ReportSmoke Free Generation Grant Funding257 KBCopy on its way
649
Report

SEND Unit Sufficiency of Places

Decision: RESOLVED KEY DECISION That the Executive: a) Endorsed the decision made by the Leader of the Council following the publication of a Regulation 11 Notice that approve d the proposed Capital Projects to provide SEND units at Greenfields Primary School and Southfield S chool for Girls in Kettering, noting the schemes will be funded by Higher Needs Funding and revenue growth funds. b) Endorsed the delegation of authority to the Executive Member for Children, Families and Education, in consultation... Decision page

2 papers, 325 KBSearch inside with Pro
AppendixAppendix A: Appendix A110 KBCopy on its way
ReportSEND Unit Sufficiency of Places215 KBCopy on its way
650
Report

Mainstream Sufficiency Projects for September 2024

Decision: RESOLVED KEY DECISION That the Executive a) Endorsed the decision made by the Leader of the Council following the publication of a Regulation 11 Notice that a pproved the proposed Capital Projects to increase Pupil Admission Numbers, providing additional places (Bulge Classes) at Manor School, Wrenn School & Prince William School and noted the scheme will be funded by Basic Needs Funding. b) Endorsed the delegation of authority to the Executive Member for Children, Families and Education, in... Decision page

2 papers, 378 KBSearch inside with Pro
AppendixAppendix A: Appendix A109 KBCopy on its way
ReportMainstream Sufficiency Projects for September 2024269 KBCopy on its way
651
Report

Treasury Management Outturn Report - 2023-24

Decision: RESOLVED That the Executive: a) Noted the treasury management outturn report detailing the activity undertaken during the financial year ended 31 st March 2024 and the performance achieved set out in Appendix A to this report; and b) Noted the Council’s treasury management activities and performance for the financial year ended 31 st March 2024. Reasons for Recommendations: The Council’s TMSS is underpinned by the CIPFA Code of Practice on Treasury Management (“the Code”) which requires that... Decision page

2 papers, 356 KBSearch inside with Pro
AppendixAppendix A: Appendix A239 KBCopy on its way
ReportTreasury Management Outturn Report: 2023-24117 KBCopy on its way
652
Report

Capital Outturn 2023/24 - Provisional Outturn as at Period 12

Decision: RESOLVED KEY DECISION That the Executive: a. Noted the update to the provisional capital outturn for the General Fund (GF) Capital Programme and Housing Revenue Account (HRA) Capital Programme for 2022/23. b. Noted the provisional capital outturn position for the General Fund (GF) Capital Programme and Housing Revenue Account (HRA) Capital Programme for 2023/24. c. Approved the proposed capital carry forwards 2023/24 into 2024/25 for the General Fund and HRA capital programmes as detailed in... Decision page

3 papers, 818 KBSearch inside with Pro
AppendixAppendix A: Appendix A216 KBCopy on its way
AppendixAppendix B: Appendix B344 KBCopy on its way
ReportCapital Outturn 2023/24: Provisional Outturn as at Period 12258 KBCopy on its way
653
Report

Capital Programme Update 2024-25

Decision: RESOLVED KEY DECISION That the Executive: i) Approved the following changes into the capital programme: a. Traffic Signals Obsolescence project , budget approval for £552.9k, £300k in 2024/25 and £252.9k in 2025/26 to be funded from Department of Transport (DfT) grant. b. Three separate schemes for school bulge places for September 2024 totalling £1,978k, all funded from Basic Needs Grant: - Manor School, £1,311k in 2024/25 - Wrenn School, £210k in 2024/25 - Prince William School, £457k in... Decision page

1 paper, 121 KBSearch inside with Pro
ReportCapital Programme Update 2024-25121 KBCopy on its way
654
Report

Budget Forecast 2023-24 at Period 12 (Draft Outturn)

Decision: RESOLVED KEY DECISION That the Executive: a) Noted the Council’s draft 2023/24 outturn position for the following funds: i) General Fund an overspend of £9.232m (Section 5) ii) Housing Revenue Account an underspend of £649k (Section 6) iii) Dedicated Schools Grant an overspend of £6.889m (Section 7) b) Noted the assessment of the deliverability of the 2023/24 savings proposals in Appendix A . c) Noted the formal reporting to Executive will be on a quarterly basis with effect from 2024/25 with... Decision page

2 papers, 542 KBSearch inside with Pro
AppendixAppendix A: Appendix A110 KBCopy on its way
ReportBudget Forecast 2023-24 at Period 12 (Draft Outturn)432 KBCopy on its way
Read inside all 33 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

What this meeting moved on

2 contracts

The main business: Carbon Management Plan Annual Report

Item 646 is where most of this meeting's papers sit: 2 papers, about 9.2 MB.

Item 646

Carbon Management Plan Annual Report

What is in the pack2 papers, about 9.2 MB
Appendix A
Appendix ASupporting paper
9 MB
Report
Carbon Management Plan Annual ReportThe report to the committee
197 KB
Read and search every page of this itemPro opens all 2 papers, and keeps them if the council removes them.
Get ProCopy on its way

How this item got here

This committee has dealt with the subject before.

16 May 2024Waste Management Three-Year Plan Update
13 June 2024Carbon Management Plan Annual ReportThis meeting.

Every paper for this meeting

All 33 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
Agenda frontsheetItem
111 KB
Copy queued
Copy on its wayRead here
Agenda reports packItem
17 MB
Copy queued
Copy on its wayRead here
Printed decisionsItem
144 KB
Copy queued
Copy on its wayRead here
Printed minutesItem
174 KB
Copy queued
Copy on its wayRead here
Minutes of the Meeting Held on 16th May 2024Item 641, Minutes of the Meetings Held on 18th April 2024 and 16th May 2024
158 KB
Copy queued
Copy on its wayRead here
Minutes of the Meetings Held on 18th April 2024 and 16th May 2024Item 641, Minutes of the Meetings Held on 18th April 2024 and 16th May 2024
186 KB
Copy queued
Copy on its wayRead here
Appendix AAppendix A, item 644, Performance Indicator Report 2023/24 (Period 12 - March 2024)
2 MB
Copy queued
Copy on its wayRead here
Appendix BAppendix B, item 644, Performance Indicator Report 2023/24 (Period 12 - March 2024)
178 KB
Copy queued
Copy on its wayRead here
Performance Indicator Report 2023/24 (Period 12: March 2024)Item 644, Performance Indicator Report 2023/24 (Period 12 - March 2024)
206 KB
Copy queued
Copy on its wayRead here
Appendix AAppendix A, item 645, Traffic Signals Obsolescence Grant Funding 2024/25 and 2025/26
111 KB
Copy queued
Copy on its wayRead here
Appendix BAppendix B, item 645, Traffic Signals Obsolescence Grant Funding 2024/25 and 2025/26
110 KB
Copy queued
Copy on its wayRead here
Traffic Signals Obsolescence Grant Funding 2024/25 and 2025/26Item 645, Traffic Signals Obsolescence Grant Funding 2024/25 and 2025/26
191 KB
Copy queued
Copy on its wayRead here
Appendix AAppendix A, item 646, Carbon Management Plan Annual Report
9 MB
Copy queued
Copy on its wayRead here
Carbon Management Plan Annual ReportItem 646, Carbon Management Plan Annual Report
197 KB
Copy queued
Copy on its wayRead here
Appendix AAppendix A, item 647, Procurement of Supporting Carers Services
83 KB
Copy queued
Copy on its wayRead here
Appendix BAppendix B, item 647, Procurement of Supporting Carers Services
46 KB
Copy queued
Copy on its wayRead here
Appendix CAppendix C, item 647, Procurement of Supporting Carers Services
114 KB
Copy queued
Copy on its wayRead here
Procurement of Supporting Carers ServicesItem 647, Procurement of Supporting Carers Services
184 KB
Copy queued
Copy on its wayRead here
Appendix AAppendix A, item 648, Smoke Free Generation Grant Funding
476 KB
Copy queued
Copy on its wayRead here
Appendix BAppendix B, item 648, Smoke Free Generation Grant Funding
112 KB
Copy queued
Copy on its wayRead here
Smoke Free Generation Grant FundingItem 648, Smoke Free Generation Grant Funding
257 KB
Copy queued
Copy on its wayRead here
Appendix AAppendix A, item 649, SEND Unit Sufficiency of Places
110 KB
Copy queued
Copy on its wayRead here
SEND Unit Sufficiency of PlacesItem 649, SEND Unit Sufficiency of Places
215 KB
Copy queued
Copy on its wayRead here
Appendix AAppendix A, item 650, Mainstream Sufficiency Projects for September 2024
109 KB
Copy queued
Copy on its wayRead here
Mainstream Sufficiency Projects for September 2024Item 650, Mainstream Sufficiency Projects for September 2024
269 KB
Copy queued
Copy on its wayRead here
Appendix AAppendix A, item 651, Treasury Management Outturn Report - 2023-24
239 KB
Copy queued
Copy on its wayRead here
Treasury Management Outturn Report: 2023-24Item 651, Treasury Management Outturn Report - 2023-24
117 KB
Copy queued
Copy on its wayRead here
Appendix AAppendix A, item 652, Capital Outturn 2023/24 - Provisional Outturn as at Period 12
216 KB
Copy queued
Copy on its wayRead here
Appendix BAppendix B, item 652, Capital Outturn 2023/24 - Provisional Outturn as at Period 12
344 KB
Copy queued
Copy on its wayRead here
Capital Outturn 2023/24: Provisional Outturn as at Period 12Item 652, Capital Outturn 2023/24 - Provisional Outturn as at Period 12
258 KB
Copy queued
Copy on its wayRead here
Capital Programme Update 2024-25Item 653, Capital Programme Update 2024-25
121 KB
Copy queued
Copy on its wayRead here
Appendix AAppendix A, item 654, Budget Forecast 2023-24 at Period 12 (Draft Outturn)
110 KB
Copy queued
Copy on its wayRead here
Budget Forecast 2023-24 at Period 12 (Draft Outturn)Item 654, Budget Forecast 2023-24 at Period 12 (Draft Outturn)
432 KB
Copy queued
Copy on its wayRead here

Last time, and what carried over

The committee last met on 16 May 2024. 3 of its items lead into this meeting; 9 items are new. Point at any item to follow a thread. Procedural items are left out.

May16
16 May 202412 items, 29 papers
Held
carried over
Jun13
13 June 202415 items, 33 papers
Held
632
Waste Management Three-Year Plan Update
633
Household Support Fund Extension
634
North Northamptonshire Housing Strategic Framework
635
Alfred Lord Tennyson Primary School Refurbishment
636
Funding for relocation of Wilby CE VA Primary School to Glenvale Park
637
Sensory Impairment Service (in Education) Disaggregation
638
Performance Management Framework and Key Performance Indicator Set 2024-25
639
Capital Programme Update 2024-25
641
Minutes of the Meetings Held on 18th April 2024 and 16th May 2024New this time
644
Performance Indicator Report 2023/24 (Period 12 - March 2024)
645
Traffic Signals Obsolescence Grant Funding 2024/25 and 2025/26New this time
646
Carbon Management Plan Annual Report
647
Procurement of Supporting Carers ServicesNew this time
648
Smoke Free Generation Grant FundingNew this time
649
SEND Unit Sufficiency of PlacesNew this time
650
Mainstream Sufficiency Projects for September 2024New this time
651
Treasury Management Outturn Report - 2023-24New this time
652
Capital Outturn 2023/24 - Provisional Outturn as at Period 12New this time
653
Capital Programme Update 2024-25
654
Budget Forecast 2023-24 at Period 12 (Draft Outturn)New this time

The threads

  • Waste Management Three-Year Plan Update leads to item 646, Carbon Management Plan Annual Report
  • Performance Management Framework and Key Performance Indicator Set 2024-25 leads to item 644, Performance Indicator Report 2023/24 (Period 12 - March 2024)
  • Capital Programme Update 2024-25 leads to item 653, Capital Programme Update 2024-25

Not carried over

Household Support Fund Extension, North Northamptonshire Housing Strategic Framework, Alfred Lord Tennyson Primary School Refurbishment, Funding for relocation of Wilby CE VA Primary School to Glenvale Park and 1 more do not return this time.

See the 16 May meeting

This committee over time

Every Executive meeting we have read, the dates it has set for the future, and each time those dates have changed.

63 meetings, 2021 to 2027Dot size shows the number of papers
2021202220232024202520262027
HeldThis meeting
MeetingItemsPapers
19 Jan 2027Tuesday
0items
0papers
UpcomingOpen
12 May 2026Tuesday
17items
46papers
HeldOpen
17 Mar 2026Tuesday
12items
21papers
HeldOpen
17 Feb 2026Tuesday
16items
36papers
HeldOpen
20 Jan 2026Tuesday
11items
21papers
HeldOpen
9 Sep 2025Tuesday
16items
36papers
HeldOpen
12 Aug 2025Tuesday
15items
27papers
HeldOpen
15 Jul 2025Tuesday
12items
21papers
HeldOpen
17 Jun 2025Tuesday
16items
35papers
HeldOpen
17 Apr 2025Thursday
12items
20papers
HeldOpen
13 Mar 2025Thursday
13items
29papers
HeldOpen
13 Feb 2025Thursday
18items
44papers
HeldOpen
6 Feb 2025Thursday
8items
20papers
HeldOpen
16 Jan 2025Thursday
12items
30papers
HeldOpen
19 Dec 2024Thursday
15items
37papers
HeldOpen
14 Nov 2024Thursday
21items
51papers
HeldOpen
10 Oct 2024Thursday
13items
28papers
HeldOpen
12 Sep 2024Thursday
14items
30papers
HeldOpen
15 Aug 2024Thursday
16items
31papers
HeldOpen
11 Jul 2024Thursday
15items
35papers
HeldOpen
13 Jun 2024Thursday, this meeting
15items
33papers
16 May 2024Thursday
12items
29papers
HeldOpen
18 Apr 2024Thursday
18items
34papers
HeldOpen
14 Mar 2024Thursday
16items
41papers
HeldOpen
15 Feb 2024Thursday
14items
34papers
HeldOpen
8 Feb 2024Thursday
8items
22papers
HeldOpen
18 Jan 2024Thursday
12items
29papers
HeldOpen
21 Dec 2023Thursday
15items
29papers
HeldOpen
16 Nov 2023Thursday
22items
55papers
HeldOpen
12 Oct 2023Thursday
17items
26papers
HeldOpen
14 Sep 2023Thursday
16items
38papers
HeldOpen
17 Aug 2023Thursday
18items
28papers
HeldOpen
3 Aug 2023Thursday
4items
5papers
HeldOpen
8 Jun 2023Thursday
19items
32papers
HeldOpen
11 May 2023Thursday
10items
14papers
HeldOpen
20 Apr 2023Thursday
18items
19papers
HeldOpen
16 Mar 2023Thursday
12items
19papers
HeldOpen
16 Feb 2023Thursday
15items
21papers
HeldOpen
9 Feb 2023Thursday
10items
27papers
HeldOpen
12 Jan 2023Thursday
12items
19papers
HeldOpen
22 Dec 2022Thursday
21items
46papers
HeldOpen
10 Nov 2022Thursday
22items
39papers
HeldOpen
13 Oct 2022Thursday
19items
24papers
HeldOpen
27 Sep 2022Tuesday
6items
3papers
HeldOpen
15 Sep 2022Thursday
23items
38papers
HeldOpen
25 Aug 2022Thursday
20items
34papers
HeldOpen
14 Jul 2022Thursday
20items
35papers
HeldOpen
16 Jun 2022Thursday
14items
25papers
HeldOpen
19 May 2022Thursday
17items
38papers
HeldOpen
14 Apr 2022Thursday
15items
33papers
HeldOpen
29 Mar 2022Tuesday
4items
7papers
HeldOpen
17 Mar 2022Thursday
16items
20papers
HeldOpen
22 Feb 2022Tuesday
15items
27papers
HeldOpen
10 Feb 2022Thursday
7items
20papers
HeldOpen
13 Jan 2022Thursday
15items
28papers
HeldOpen
23 Dec 2021Thursday
7items
21papers
HeldOpen
16 Dec 2021Thursday
13items
10papers
HeldOpen
18 Nov 2021Thursday
39items
62papers
HeldOpen
30 Sep 2021Thursday
14items
23papers
HeldOpen
26 Aug 2021Thursday
20items
29papers
HeldOpen
5 Aug 2021Thursday
16items
24papers
HeldOpen
15 Jul 2021Thursday
12items
17papers
HeldOpen
22 Jun 2021Tuesday
16items
20papers
HeldOpen

Follow the Executive

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

North Northamptonshire, Executive

Executive: 3 kinds of updateNorth Northamptonshire, sent the same day
PDF
33 papers published for 13 JuneCarbon Management Plan Annual Report and 32 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 13 JuneThe committee's resolutions, the day they are recorded
ABC
"carbon" found in 1 paperCarbon Management Plan Annual Report
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Executive, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies