RESOLVED THAT: 1. The River Mease Water Quality Management Plan Developer Contributions Scheme 2 be adopted as a supplementary policy document (as appended to the report) and implement the scheme with immediate effect; and 2. Responsibility to review and amend the Developer Contribution Scheme as and when required, monitoring and review of phosphorous reductions as required by delegated to the Director of Services in consultation with the Regeneration and Planning Portfolio Holder and will be referred back to Cabinet only where significant material revisions to the scheme are required. Reason for decision: To provide a mechanism through which major and other new residential and commercial development can continue to be allowed in the River Mease catchment without having an adverse impact on the integrity of the SAC. At present the District Council has in place the River Mease SAC Water Quality Management Plan Developer Contributions Scheme 1 (DCS1) however, this developer scheme has now reached its maximum capacity. The District Council is therefore unable to permit further development within the River Mease catchment by way of DCS1 and therefore seeks adoption of DCS2.
Word for word from the decision North West Leicestershire published for this meeting.Source: minutes-1.nwleics.gov.uk
Tel 0118 973 4700 [email removed] Website: www.dt-a.co.uk River Mease Water Quality Management Plan: Developer Contributions Scheme (2)
This Developer Contributions Scheme (DCS) is a requirement of the River Mease Special Area of Conservation Water Quality (Phosphate) Management Plan (WQMP).
This document replaces the first DCS (dated October 2012) and is likewise divided into eight sections which are introduced below. Much of the document is unchanged from the original DCS with sections C.4, E & F having been updated.
Section A sets the scope of the Developer Contributions Scheme and the development to which it relates Section B provides relevant background Section C explains the basis upon which the scheme is required and establishes the links to existing planning policy Section D provides the evidence base in relation to the negative effects of phosphorus Section E introduces how the contributions will be assigned and linked to the nature and scale of proposed development Section F sets out the list of measures that will be funded by the scheme with associated costings and specifies the contribution per dwelling Section G refers to the role of monitoring and ongoing review Section H considers the potential for bespoke solutions
A Relevance of developments to this scheme
The developer contribution scheme (DCS) is relevant to development which results in a net increase in phosphorus load being discharged to the River Mease Special Area of Conservation (SAC). It currently applies to all development which contributes additional wastewater via the mains sewerage network to a sewage treatment works which discharges into the catchment of the River Mease SAC. The following wastewater treatment works are affected: Snarestone Norton juxta Twycross Donisthorpe Overseal Netherseal Measham Clifton Campville Packington Edingale Smisby Chilcote
All new development which contributes additional wastewater to the foul water catchment areas of the above treatment works will be subject to a developer contribution. Development for which connection to the mains network is not a viable option will continue to be addressed on a case by case basis; the DCS may provide a solution to such development depending on the specific circumstances of each case. 1 B Background to the Developer Contribution Scheme B.1 The River Mease SAC The River Mease was designated by the Secretary of State as a Special Area of Conservation (SAC) under the EC Habitats Directive1 on the 1st April 2005. The SAC is protected through the provisions of the Conservation of Habitats and Species Regulations 2010 (SI No. 490), commonly referred to as the Habitats Regulations.
The SAC incorporates the Gilwiskaw Brook downstream of Packington village and the River Mease from its confluence with the Gilwiskaw Brook to its confluence with the River Trent. It is designated for its internationally important habitats and species, which are collectively referred to as its ‘interest features’. Natural England has drawn up conservation objectives for these features which are set out below2:
Conservation Objectives for the River Mease SAC
With regard to the SAC and the natural habitats and/or species for which the site has been designated (‘the Qualifying Features’ listed below), and subject to natural change;
Ensure that the integrity of the site is maintained or restored as appropriate, and ensure that the site contributes to achieving Favourable Conservation Status of its Qualifying Features, by maintaining or restoring;
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Ashby Business Improvement DistrictRESOLVED THAT: 1) The Ashby BID proposals, set out in this report, be reviewed. 2) Authority be delegated to the Stra...
Consultancy Services for the Local PlanRESOLVED THAT: 1) The procurement for Planning Policy Consultancy Support from the Council’s Contract Procedure Rules...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.