CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Oxfordshire County Council
Transport Management, Thursday 10 October 2024 at 10.00am

Oxford City Cycle Parking Improvements 2024

Approved Committee 2 papers

Transport Management approved this item on Thursday 10 October 2024. Below is the council's own wording, with the papers it was decided on.

Item145/24

Resolved

RESOLVED to: Approve as advertised, the amendment of existing & introduction of new ‘on [1] carriageway’ cycle parking places within Oxford, as follows: a) Brasenose Lane – extend existing & introduce new provision on the north side, b) Broad Street – introduce new provision in the central area, c) Ship Street – extend existing provision on the south side, d) Queens Lane - extend existing provision on the west side, e) Leopold Street – introduce new provision on the north & south sides, replacing parts of existing car parking bays, f) Observatory Street – introduce new provision on the north side, g) South Parade – introduce new provision on the south side, replacing parts of existing car parking bays.
Word for word from the decision Oxfordshire published for this meeting. Source: mycouncil.oxfordshire.gov.uk

Follow this further

Built from Oxfordshire's papers

What the report saysPro

Report to Transport Management, 73 pages

Executive summary

2. This report presents responses to the statutory consultation on the proposals to provide suitable & secure parking for pedal cycles by amending existing & introducing new ‘on-carriageway’ cycle parking places within Oxford, as shown in Annexes 1 to 7.

3. The cycle parking will be delivered through Oxford City Council’s CIL funded ‘City Cycling Infrastructure Fund’ which has been designated for installing new cycle parking across Oxford. This is an ongoing project, and it is expected that more proposals for further new cycle parking spaces will be brought forward separately in the future.

4. The proposals will provide an uplift in approximately 61 cycle racks, providing space for an additional 122 bicycles. The proposals on Queen’s Lane will also see 14 cycle racks (28 spaces) replaced with racks more appropriately spaced and positioned, in line with the latest design guidance. The exact layout and design of the cycle parking spaces in each case will be refined ahead of installation in response to comments received during the consultation. 5. The breakdown of cycle parking uplift in each location is shown below:

Location Additional cycle racks Additional cycle parking proposed (approx.) spaces proposed (approx.) Brasenose Lane 16 32 Broad Street 5 10 Ship Street 6 12 Queens Lane 7 14 Leopold Street 10 20 Observatory Street 5 10 South Parade 12 24 TOTAL 61 122

Financial implications

6. Funding for the proposals (including consultation) has been provided by the Oxford City Council CIL ‘City Cycling Infrastructure Fund’, which will also fund the implementation if approved.

7. No legal implications have been identified in respect of the proposals, with proposed changes to existing Traffic Regulation Orders governed by the Road Traffic Regulation Act 1984 and other associated procedural regulations. Failure to adhere to these statutory processes could result in the proposals being challenged.

Equality and Inclusion Implications

8. No implications in respect of equalities or inclusion have been identified in respect of the proposals. Sustainability Implications

9. The proposals will help provide suitable and secure parking for existing pedal cycles, as well as providing additional cycle parking capacity for both residents and visitors. They will also provide new high-quality cycle parking furniture that adheres to the latest design standards. This is in line with the Local Transport and Connectivity plan which includes targets to:

 reduce 1 in 4 current car trips by 2030  deliver a net-zero transport network by 2040  and have zero, or as close as possible, road fatalities or life-changing injuries by 2050.

10. Any cycle parking installed with the ‘City Cycling Infrastructure Fund’ is required to have community benefit, and therefore needs to be publicly accessible. The city and county councils have worked collaboratively to identify suitable locations for the proposed publicly accessible parking racks, which have also included requests from residents, businesses and local Councillors.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
CMDTMT10102024: 7a: Annex 1 /24Appendix 4 pages Download
PDF
Oxford City Cycle Parking Improvements 2024Report 73 pages DownloadRead as text

At this meeting

Whole meeting

Who was there

1 of 2 attended
AG
Councillor Andrew GantCommittee Member, present
JA
Jack AhierSecretary, expected

On this subject at Oxfordshire

Search all
  1. Oxford City Cycle Parking Improvements 2024This decision
  2. Proposed Parking Permit Eligibility Changes - Oxford CityApproved
  3. Proposed Disabled Persons Parking Places (DPPP's) Oxford City (Summer 2025)Approved
  4. Proposed Waiting Restrictions - Various Locations, Oxford CityApproved
  5. Oxford City - Formalisation of Prohibition of Driving RestrictionsApproved
  6. Oxford City, Various Locations - Proposed New and Deleted Disabled Persons Parking Places (February 2025)Approved

More from Oxfordshire Transport Management

All decisions
MeetingDecisionOutcome
23 Apr 2026 Copenhagen Drive, Abingdon - Proposed Toucan Crossing and Shared Use PathRESOLVED to: Approve the following measures on Copenhagen Drive in Abingdon, as advertised: a) New Toucan Crossing, t... Approved Open
23 Apr 2026 Proposed Bus Stops - Ladygrove, DidcotRESOLVED to: a) Approve the introduction of two new bus stop clearways (with ‘No stopping except local buses’ restric... Approved Open
23 Apr 2026 Wallingford Area LCWIPRESOLVED to: a) Approve Wallingford Area Local Cycling and Walking Infrastructure Plan (LCWIP). Approved Open
23 Apr 2026 A4130, Steventon Lights - Proposed Traffic Management MeasuresContact: Mohamed Gulamhussein, Project Manager – Infrastructure Delivery ( [email protected] ) ... Approved Open
23 Apr 2026 Proposed Puffin Crossing - A329 Reading Road, CholseyRESOLVED to: a) Approve the introduction of a new Puffin crossing on the A329 Reading Road in Cholsey, as advertised. Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies