(1) Approval was given to tender the works based on a budget estimate of £1 million, inclusive of fees. (2) That following a full tender evaluation authority to enter into contract with the preferred bidder be delegated to the Director of Property and Housing.
Word for word from the decision Portsmouth published for this meeting.Source: democracy.portsmouth.gov.uk
1.1To seek permission to go out to tender and appoint a contractor to undertake planned maintenance works to 8no blocks of flats located within Hawthorn Crescent, Cosham.
1.2The works are required to ensure the safety and integrity of the buildings, reduce their on-going maintenance and improve the living environment for residents.
1.3If approved, it is anticipated that the works could commence by April 2016.
Recommendations
i That approval be given to tender the works based on a budget estimate of £1 Million, inclusive of fees.
Ii That following a full tender evaluation authority to enter into contract with the preferred bidder is delegated to the Director of Property and Housing.
Background
3.1All the properties are located within the Cosham Ward and were constructed in 1961.
3.2The site contains a total of 76 properties within eight blocks of flats which are a mixture of one, two and three bedroom flats and maisonettes.
3.3There are 21No leaseholders and 55No PCC residents that are located within all the blocks. 1 www.portsmouth.gov.uk 3.4 All of the blocks have been evaluated, a full building survey has been undertaken, defects identified and relevant proposals put forward to address the defects.
3.5The main area of works relates to the removal of rotten timber fins that provide shading to private balconies. These structures require removal and it is proposed to install half glazed aluminium screens in these areas that will reduce future maintenance.
3.6In addition to the works to the balcony fins, general repairs to the external and communal areas will be undertaken along with decorations to these areas as identified from the survey.
Reasons for recommendations
4.1The works will ensure the integrity of the building fabric, help protect against future deterioration and reduce current levels of repair expenditure.
4.2In particular the replacement of the balcony fins will eliminate the on-going costly repairs for this type of work as well as to remove the potential health and safety risk to the resident's.
4.3The project will upgrade the aesthetic visual appearance of the blocks and will improve the communal environment.
4.4The scheme will provide a better safer living environment for residents and maintain good quality accommodation for families in the city.
5. Options considered and rejected
5.1An option considered and rejected was to remove the timber balcony fins and not replace them, only adapting the existing balcony structure as necessary. This option was rejected following initial resident consultation where it became apparent that many of the residents rely on the balcony fins to provide shelter and privacy to their balconies.
5.2Other options relating to the removal of the fins and various configurations of replacement screens were put forward as part of the initial resident consultation, however the most popular option was the half glazed full screen.
5.3Initial evaluation included all 18No blocks within Hawthorn Crescent, however the other blocks are configured differently and the survey identified that they were in a better condition. Undertaking work to all blocks at once the site would become too large, so it was decided to phase the work focusing on the blocks with the highest priority issues; hence this project will focus on all blocks with timber balcony fins that require replacement.
2 www.portsmouth.gov.uk 6. Duty to involve
6.1Thorough consultation will be undertaken with both residents and leaseholders of the properties.
6.2Resident consultation was undertaken in March 2015 with those properties that have balconies that will be affected by the works. The results of the consultation were used to inform the balcony option chosen.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Temporary Accommodation Placement PolicyThe Cabinet Member for Housing (1) recognises the important role that temporary accommodation has in supporting peopl...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.