CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Portsmouth City Council
Traffic & Transportation, Monday 17 July 2017 at 4.00pm

Isambard Brunel Road - revoke Traffic Regulation Order

Approved Committee 2 papers

Traffic & Transportation approved this item on Monday 17 July 2017. Below is the council's own wording, with the papers it was decided on.

Item8

Resolved

The Cabinet Member for Traffic and Transportation gave approval to advertise and amend the Consolidated Bus, Taxi and Cycle Lanes and Prohibition of Driving Except Buses, Taxis and Cycles (No 79) Order to remove reference to the bus lane at item 8 in schedule 1 relevant to Isambard Brunel Road, to facilitate the implementation of a comprehensive improvement to the public realm.
Word for word from the decision Portsmouth published for this meeting. Source: democracy.portsmouth.gov.uk

Follow this further

Built from Portsmouth's papers

What the report saysPro

Report to Traffic & Transportation

Purpose of report

1.1The purpose of this report is to seek approval to advertise and amend the Consolidated Bus, Taxi and Cycle Lanes and Prohibition of Driving Except Buses, Taxis and Cycles (No 79) Order to remove reference to the bus lane at item 8 in schedule 1 relevant to Isambard Brunel Road. That facility is currently suspended and forms part of the construction compound for the redevelopment of Chaucer House in Isambard Brunel Road (between Greetham Street and Station Road). The removal of this from the order will facilitate the implementation of a comprehensive improvement to the public realm.

Recommendations

2.1It is recommended that the Cabinet Member for Traffic and Transportation:

(1) Gives approval to advertise and amend the Consolidated Bus, Taxi and Cycle Lanes and Prohibition of Driving Except Buses, Taxis and Cycles (No 79) Order to remove reference to the bus lane at item 8 in schedule 1 relevant to Isambard Brunel Road, to facilitate the implementation of a comprehensive improvement to the public realm.

Background

3.1The City Council made a consolidated traffic regulation order (no. 79) in 2015 to prohibit driving with the exception of buses, taxis and cycles in specified bus and cycle lanes. Schedule 1 of that order details the specific areas to which the order applied and includes at item 8 the bus lane on the south side of Isambard Brunel Road.

3.2The city centre masterplan adopted in January 2013 made commentary on creating / improving the public realm in Isambard Brunel Road, in summary the intention is to:

1 www.portsmouth.gov.uk  Establish a more unified space in the part of Isambard Brunel Road that more effectively links the railway station to Guildhall Square and enhances the pedestrian environment;  Enlarge the public realm forming ‘Isambard Place’ to establish a more generously proportioned pedestrian route from the rail station to Guildhall Square;  Enhance footways through to Greetham Street comprising; widening the footways, coordinating surfacing materials, tree planting and removal of the existing underpass replacing it with a surface crossing.

3.3It is implicit in this policy that there will be a need to either remove the bus lane and integrate buses with general traffic or exclude private traffic from Isambard Brunel Road to realise the space required to make the public realm enhancements.

3.4Planning permission has been granted for the redevelopment of Chaucer House to provide purpose-built student accommodation. Construction is underway and the development will be completed and available to students in time for the start of the 2018 academic year. Due to the confined nature of the site the bus lane and footway on the south side of Isambard Brunel Road has been suspended to allow the developer to establish a site compound and facilitate implementation of the development. During this period the bus movements have been integrated with the general traffic flow on Isambard Brunel Road as shown on the drawing enclosed at Appendix A. This arrangement has operated well and provides a tested model for the future approach.

3.5Upon completion of the build, a comprehensive improvement to the public realm within the area occupied by the developer is envisaged. All of the costs associated with implementing the subsequent public realm improvement will be met by the developer, having been secured through the Section 106 planning agreement associated with the permission.

Reasons for recommendations

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Isambard Brunel Road: revoke Traffic Regulation OrderReport 266 KB DownloadRead as text
PDF
Prelim EIA -Isambard Brunel RdReport 475 KB Download

At this meeting

Whole meeting

Who was there

2 of 3 attended
SB
Councillor Simon BosherCabinet Member, present
LS
Councillor Lynne StaggOpposition spokesperson, present
YC
Councillor Yahiya ChowdhuryOpposition spokesperson, absent

On this subject at Portsmouth

Search all
  1. Isambard Brunel Road - revoke Traffic Regulation OrderThis decision
  2. Active Travel Improvements - TRO 206/2022 Isambard Brunel RoadApproved
  3. Isambard Brunel Road Temporary TROApproved

More from Portsmouth Traffic & Transportation

All decisions
MeetingDecisionOutcome
23 Mar 2023 Local Transport Plan 4 - Implementation Plan 2022 to 2025 - Year 2 annual reviewDecision The Cabinet Member: Approved and adopted the Local Transport Plan (LTP4) funded schemes 2023/24 as part of P... Approved Open
23 Mar 2023 Tertiary Roads Inspection and RepairDecision The Cabinet Member: 1. Approved that the plans and timings of inspections of the tertiary road network are s... Approved Open
23 Mar 2023 Active Travel Improvements - TRO 206/2022 Isambard Brunel RoadDecision The Cabinet Member: 1. Approved the implementation of TRO 206/2022 for the introduction of the bus, taxi and... Approved Open
23 Mar 2023 TRO 24/2023 - Walmer Road, Renny Road and Proctor Lane - one way except cyclesDecision The Cabinet Member: 1. Approved the implementation of TRO 24/2023, to implement a series of one-way streets ... Approved Open
23 Mar 2023 St Jude's School Streets permanent infrastructureDecision The Cabinet Member: 1. Approved creating a School Street via the installation of resident only access signs ... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies