Resolved
The Cabinet Member for Housing noted the work being undertaken across the Local Authority Housing blocks. (NB as this was an information update report it is not subject to call-in)
Housing noted this item on Tuesday 10 October 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
The Cabinet Member for Housing noted the work being undertaken across the Local Authority Housing blocks. (NB as this was an information update report it is not subject to call-in)
The purpose of this report is to provide an update to the Cabinet Member for Housing regarding the fire safety work that has been undertaken at Local Authority Housing blocks of flats and to highlight the future decisions that will be required regarding fire safety work.
That the Cabinet Member for Housing:
3.1notes the work being undertaken across the Local Authority Housing blocks
4. Background - Grenfell Tower Fire
4.1Following the tragic fire at Grenfell Tower on 14 June 2017, the government established a Building Safety Programme with the aim of ensuring high rise residential buildings are safe, and residents feel safe in them.
4.2Screening tests at the Building Research Establishment (BRE) were identifying whether Aluminium Composite Material (ACM) cladding samples from buildings met the limited combustibility requirements of current Building Regulations guidance. 1 www.portsmouth.gov.uk 4.3 An Independent Expert Advisory Panel, appointed on 27 June 2017, provided the government with advice on immediate steps that can be put in place to make buildings, and the people living in them, as safe as possible. The panel have a wealth of experience in fire and building safety, and have drawn on wider technical expertise to inform their advice to government, including from experts on building design and construction, building control, testing processes, fire safety and fire engineering.
4.4Seven further large scale tests have been undertaken to understand whether and when it may be safe to use ACM as part of an external wall cladding system in high rise buildings, in line with current Building Regulations guidance.
5. Horatia House and Leamington House Cladding
ACM Cladding Tests
5.1The only Council owned Housing high rise blocks of flats identified with ACM cladding are Horatia House and Leamington House. Both blocks are Bison construction and were built in 1965. Each block is 18 storeys high and consists of a total of 136 No. flats (one, two and three bedroom properties) within each block, there are 8 No. flats per storey, there are no flats on the ground floor and there are two escape stairwells per block.
5.2Each block is fully clad on two elevetions and partially clad on the remaining elevations. Horatia House is clad using ACM (Reynobond product) and Leamington House is clad using ACM (Alucabond product). The type of insulation used behind the ACM cladding in both instances is a stone mineral wool product (Rockwool) which is a non combustanle material. The project to install cladding at Leamington House was undertaken by Conought in 2002, whilst the project to install cladding was undertaken by McGinley in 2004.
5.3In accourdance with Department for Communities and Local Government (DCLG) guidance, samples of ACM cladding were sent for testing at the BRE on 21 June 2017. The Council was notified of the results of the intitial screening test on 22 June 2017 that confirmed that the (filler used in the ) ACM cladding to both blocks was ACM category 3.
5.4A subsequent series of large scale system tests to the British Standard test (BS8414) was undertaken as a way of demonstrating that a wall system meets Building Regulations guidance for buildings over 18m. The result of this subsequent system test was confirmed on 2 August 2017.
5.5The Expert Panel’s advice following these tests is that ACM on Horatia House and Leamington House with an unmodified polyethylene filler (category 3 in screening tests) with any type of insulation presents a significant hazard on buildings over 18m.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Fire Safety Update: Local Authority Owned PropertiesReport | 110 KB | DownloadRead as text |
PDF |
Photo Progress Update Horatia House and Leamington HouseReport | 4.2 MB | Download |
Follow Housing at Portsmouth and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 20 Jul 2020 | Development of Affordable Housing - Highgrove Lodge Site(1) The Cabinet Member for Housing approved Capital Expenditure of £ 5.1m, to deliver 6 new properties housing 24 adu... | Approved | Open |
| 9 Mar 2020 | Resources for Rough Sleepers in Portsmouth (information report)The contents of the information report were noted. (This is not subject to call-in provisions.) | Noted | Open |
| 9 Mar 2020 | Development of Affordable Homes - Huntsman Close, Havant(1) the Cabinet Member for Housing approved Capital Expenditure of £1.9m, to deliver 10 new affordable housing proper... | Approved | Open |
| 9 Mar 2020 | Council Housing Maintenance and Improvements and Housing IT Business Software 2020/21The Cabinet Member for Housing agreed: (1) That the area programmes and allocation of finance for the funding of the ... | Agreed | Open |
| 27 Jan 2020 | Temporary Accommodation Placement PolicyThe Cabinet Member for Housing (1) recognises the important role that temporary accommodation has in supporting peopl... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.