Noted the contents of this report 2. Endorsed the CMSP recommended train service specification: Portsmouth – Southampton: additional 2 trains per hour giving 4 trains per hour; and Portsmouth – Eastleigh: additional train per hour giving 2 trains per hour. 3. Supported in principle the following CMSP recommended infrastructure measures that will be required in Portsmouth to facilitate the new services: Agreed the reinstatement of track in platform 2 at Portsmouth Harbour station, bringing the platform back into use; and/or Agreed the provision of an additional platform at Portsmouth and Southsea station, adjacent to the low-level platforms 3 and 4.
Word for word from the decision Portsmouth published for this meeting.Source: democracy.portsmouth.gov.uk
The purpose of this report is to inform members of the recommendations for the future development of train services in the Solent area (Portsmouth – Southampton/Eastleigh) contained in “Solent Connectivity”, the Solent Continuous Modular Strategic Planning (CMSP) study.
Recommendations
It is recommended that the Cabinet Member for Traffic and Transportation:
2.1Notes the contents of this report
2.2Endorses the CMSP recommended train service specification:
o Portsmouth – Southampton: additional 2 trains per hour giving 4 trains per hour; and
o Portsmouth – Eastleigh: additional train per hour giving 2 trains per hour.
2.3Supports in principle the following CMSP recommended infrastructure measures that will be required in Portsmouth to facilitate the new services:
o Reinstatement of track in platform 2 at Portsmouth Harbour station, bringing the platform back into use; and/or
o Provision of an additional platform at Portsmouth and Southsea station, adjacent to the low-level platforms 3 and 4.
1 www.portsmouth.gov.uk 3. Background: the Solent CMSP study
3.1In the rail industry planning process more locally focussed Continuous Modular Strategic Planning (CMSP) studies have replaced the large “Route Utilisation Studies” formerly used to develop specifications for rail service plans.
3.2Network Rail owns, manages and maintains the National Rail network in Great Britain. Network Rail work in partnership with Solent Transport, and have undertaken a Continuous Modular Strategic Planning (CMSP) study covering the following routes in the Solent area including:
3.4Figure 1 below shows a map of the Solent CMSP study area. The study area comprises of 70 miles of route with 31 stations.
Figure 1: The Solent CMSP study area
3.5The aims of the CMSP process are:
To work closely with local authorities and local enterprise partnerships to identify current and future transport needs in specific areas; 2 www.portsmouth.gov.uk To identify how rail can better serve these transport needs; To focus on the transport needs of rail customers; and To improve Network Rail’s engagement with the train operators.
3.6The Solent area has a high level of car dependency and currently a lower use of rail than might be expected for its population size – only 2.3% of commuter trips are made by train. Achieving a mode shift from car to rail travel could contribute to the delivery of a range of transport, economic and environmental policy objectives.
3.7The travel markets with the greatest potential for a shift to rail, and where the benefits of such a shift would be largest are:
“medium distance” journeys between the Portsmouth and Southampton city regions and their city centres; “medium distance” journeys between the city regions and key employment hubs such as Whiteley; and Journeys between the two city regions.
3.8In the morning peak period rail travel times are quicker than those possible by car for many of these journeys. However, the relatively low train service frequencies at many stations make rail travel unattractive. Increasing service frequencies to reduce passengers’ waiting times, could be more beneficial than running faster trains. Physical constraints on infrastructure development would preclude a substantial increase in train speeds. Increasing train service frequencies is therefore prioritised.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Tertiary Roads Inspection and RepairDecision The Cabinet Member: 1. Approved that the plans and timings of inspections of the tertiary road network are s...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.