Provided formal consent for the installations of the designated electric vehicle charging bays detailed in Appendix A with the following 19 exceptions: De Lisle Close, West side adjacent to Nos.7-19 does not proceed Eastfield Road, South side, outside No.73; does not proceed Fordingbridge Road, East side, outside No.60; does not proceed Gladys Avenue, East side, outside no.76; does not proceed Glasgow Road, North side, outside No.28; does not proceed Goodwood Road, West side, outside No.17; does not proceed High Street, Old Portsmouth, South-east side, outside No.17; does not proceed Highland Road, South side, outside No.24; does not proceed Laburnum Grove, South side, outside No.226; does not proceed Lindley Avenue, South Side, outside no 36; does not proceed Lumsden Road, South-east side, within the layby, front of 32-44; does not proceed Lyndhurst Road, East side, outside No.146; does not proceed Malvern Road, West side, outside Nos. 19/21; does not proceed Montague Road, North side, outside No.33; does not proceed Oxford Road, East side, outside No.52/54; does not proceed St Ronan's Road, East side outside No. 80 does not proceed Taswell Road; East side, outside No.32; does not proceed Waverley Grove, South side outside No.2 does not proceed Wykeham Road, South side, outside Nos. 81 does not proceed Noted the policy and guidance on the use of trailing cables to charge electric vehicles from off street power sources by residents is being developed and will be brought for a decision in a separate paper.
Word for word from the decision Portsmouth published for this meeting.Source: democracy.portsmouth.gov.uk
1.1To consider the public responses to TRO 75/2020, proposed designated electric vehicle charging bays in 80 locations across 71 roads. Objections were received to proposals within TRO 75/2020, and therefore a report to the Cabinet Member is required for decision to be made at a public meeting.
Appendix A: The public proposal notice and plans for TRO 75/2020 Appendix B: Public views submitted Appendix C: FAQs Appendix D: Tariffs Appendix E: Location Map Appendix F: Integrated Impact Assessment
1 www.portsmouth.gov.uk 2. Recommendations
It is recommended that the Cabinet Member for Traffic & Transportation:
2.1Provides formal consent for the installations of the designated electric vehicle charging bays detailed in Appendix A with the following 19 exceptions:
De Lisle Close, West side adjacent to Nos.7-19 does not proceed
Eastfield Road, South side, outside No.73; does not proceed
Fordingbridge Road, East side, outside No.60; does not proceed
Gladys Avenue, East side, outside no.76; does not proceed
Glasgow Road, North side, outside No.28; does not proceed
Goodwood Road, West side, outside No.17; does not proceed
High Street, Old Portsmouth, South-east side, outside No.17; does not proceed
Highland Road, South side, outside No.24; does not proceed
Laburnum Grove, South side, outside No.226; does not proceed
Lindley Avenue, South Side, outside no 36; does not proceed
Lumsden Road, South-east side, within the layby, front of 32-44; does not proceed
Lyndhurst Road, East side, outside No.146; does not proceed
Malvern Road, West side, outside Nos. 19/21; does not proceed
Montague Road, North side, outside No.33; does not proceed
Oxford Road, East side, outside No.52/54; does not proceed
St Ronan's Road, East side outside No. 80 does not proceed
Taswell Road; East side, outside No.32; does not proceed
Waverley Grove, South side outside No.2 does not proceed
Wykeham Road, South side, outside Nos. 81 does not proceed
2 www.portsmouth.gov.uk 2.2 Notes the policy and guidance on the use of trailing cables to charge electric vehicles from off street power sources by residents is being developed and will be brought for a decision in a separate paper.
Background
3.1Portsmouth City Council is required to comply with the Ministerial Directive as written in the 1995 Environment Act (Portsmouth City Council) Air Quality Direction 2020. This directive includes the requirement to implement the local plan for reduction of roadside nitrogen dioxide emissions by 2022 at the latest. Electric vehicle charging infrastructure is a part of both the local and national strategy for the improvement of air quality.
3.2The Office for Low Emission Vehicles (OLEV) created a Fund to enable local authorities to provide Electric Vehicle (EV) chargepoints. This was specifically for residential areas that do not benefit from off-street parking, to enable residents to charge their electric vehicles close to their home. In 2018 Portsmouth City Council bid to this fund and were successful in receiving £100k towards 75% of the costs for installation and infrastructure for 36 chargepoints in phase 1. The chargepoints were installed and are required to remain in place for a period of three years. Portsmouth City Council received an E-mobility Progress award for phase 1 from Transtech in 2019 for phase 1.
3.3A report reviewing phase 1 has been forwarded for discussion at the October 2020 meeting.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Tertiary Roads Inspection and RepairDecision The Cabinet Member: 1. Approved that the plans and timings of inspections of the tertiary road network are s...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.