CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Portsmouth City Council
Traffic & Transportation, Thursday 29 October 2020 at 4.00pm

On-Street Residential Charge Point Scheme - Phase 1 mid-point review

Noted Committee 1 paper

Traffic & Transportation noted this item on Thursday 29 October 2020. Below is the council's own wording, with the papers it was decided on.

Item38

Resolved

The report was noted.
Word for word from the decision Portsmouth published for this meeting. Source: democracy.portsmouth.gov.uk

Follow this further

Built from Portsmouth's papers

What the report saysPro

Report to Traffic & Transportation

Background

3.1The Office for Low Emission Vehicles (OLEV) created a fund to enable local authorities to provide Electric Vehicle (EV) chargepoints. This was specifically for residential areas that do not benefit from off-street parking, to enable residents to charge their electric vehicles close to their home. In 2018 Portsmouth City Council bid to this fund and were successful in receiving £100k towards 75% of the costs for installation and infrastructure for 36 chargepoints. The chargepoints are required to remain in place for a period of three years.

3.2Usage is monitored across the three year trial period, to understand the usage and uptake of electric vehicles within the city. It is hoped that installation of electric vehicle charging points will encourage and enable local residents to make the change from their regular petrol or diesel vehicle.

1 www.portsmouth.gov.uk THIS ITEM IS FOR INFORMATION ONLY (Please note that "Information Only" reports do not require Equality Impact Assessments, Legal or Finance Comments as no decision is being taken)

4. Portsmouth ORCS Phase 1 Background

4.1At the 24th January 2019 Traffic & Transportation meeting, approval was given for the installation of charge points. These were installed in March 2019, in the following locations:

53 Adair Rd 82 Hartley Rd 83/85 Pretoria Rd Havant Road (alongside 15 51 Adames Rd 28a Priory Cres Chichester Rd) Astley St (North of King 32 Heathcote Rd 36 Posbrooke Rd Street Junction) Henderson Rd (opposite Balfour Road (alongside Racton Ave (opp Lordington Cockleshell Community 56 Kirby Rd) Close) Centre) Clarence Parade (opp 122 Henderson Rd 7 Selsey Ave Lennox Mansions) Clarence Parade (opp High St (25 Crown Court) 2 St Catherine St Stacey Court)

Hunter Rd (alongside 29 Taswell Rd (opp Wimbledon 92 Eastfield Rd Hatfield Rd) Park Sports Centre)

131 Essex Rd 74 Kensington Road 48 Victoria Rd N 16 Florence Rd 183 Laburnum Grove 55 Warren Ave 1 Fordingbridge Rd 66 Oriel Rd 95 Warren Ave

Westbourne Road (alongside 58 Glencoe Rd 102 Oriel Rd 268 Chichester Rd)

68 Hartley Rd 75 Oxford Rd 23 Wimbledon Park Rd

4.2At the time of installation, not all bays were marked, as not all requesting residents had purchased their electric vehicle.

5. Portsmouth ORCS Phase 1 - mid scheme review

5.1In November 2019 the first phase of the On-Street Residential Chargepoint Scheme won the Transtech Award for E-Mobility progress. ORCS is thought to be the only pay as you go, lamp-column based on-street resident charging solution which benefits from designated parking pays, guaranteeing access to the chargepoints.

5.2The scheme is a three year trial and at the time of writing this report has seen 16 full months of operation. The following section outlines the findings of usage data and resident survey during this time.

5.3Appendix A shows the number of usages per site since April 2019.

2 www.portsmouth.gov.uk THIS ITEM IS FOR INFORMATION ONLY (Please note that "Information Only" reports do not require Equality Impact Assessments, Legal or Finance Comments as no decision is being taken) 5.4 The project is a trial which was 75% funded by OLEV. As part of the grant funding conditions the charge points must remain in place for 3 years.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
On-Street Residential Charge Point Scheme: Phase 1 mid-point reviewReport 705 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

3 of 3 attended
LS
Councillor Lynne StaggCabinet Member, present
SB
Councillor Simon BosherOpposition spokesperson, present
GH
Councillor Graham HeaneyOpposition spokesperson, present

On this subject at Portsmouth

Search all
  1. On-Street Residential Charge Point Scheme - Phase 1 mid-point reviewThis decision
  2. Electric Vehicle On-street Residential Chargepoint Scheme (ORCS) Batch 2 AMENDMENT: Wallisdean Avenue Chargepoint Location P3BAF302BNoted
  3. Electric Vehicle On-Street Residential Chargepoint Scheme:THE PORTSMOUTH CITY COUNCIL (VARIOUS ROADS)(ELECTRIC VEHICLE RECHARGING PARKING PLACES)(NO.3) ORDER 2025 (Ref PO44-2024)Approved
  4. On-Street Residential Chargepoint Scheme - Phase 3Approved
  5. On-Street Residential Charge Point Scheme (Phase 3)Approved
  6. On-Street Residential Chargepoint Scheme - Phase 2 six-month reviewNoted

More from Portsmouth Traffic & Transportation

All decisions
MeetingDecisionOutcome
23 Mar 2023 Local Transport Plan 4 - Implementation Plan 2022 to 2025 - Year 2 annual reviewDecision The Cabinet Member: Approved and adopted the Local Transport Plan (LTP4) funded schemes 2023/24 as part of P... Approved Open
23 Mar 2023 Tertiary Roads Inspection and RepairDecision The Cabinet Member: 1. Approved that the plans and timings of inspections of the tertiary road network are s... Approved Open
23 Mar 2023 Active Travel Improvements - TRO 206/2022 Isambard Brunel RoadDecision The Cabinet Member: 1. Approved the implementation of TRO 206/2022 for the introduction of the bus, taxi and... Approved Open
23 Mar 2023 TRO 24/2023 - Walmer Road, Renny Road and Proctor Lane - one way except cyclesDecision The Cabinet Member: 1. Approved the implementation of TRO 24/2023, to implement a series of one-way streets ... Approved Open
23 Mar 2023 St Jude's School Streets permanent infrastructureDecision The Cabinet Member: 1. Approved creating a School Street via the installation of resident only access signs ... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies