Traffic & Transportation, Friday 18 March 2022 at 4.00pm

Update on rapid electric vehicle (EV) charging infrastructure for taxis and private hire vehicles (PHVs)

Noted Committee 1 paper

Traffic & Transportation noted this item on Friday 18 March 2022. Below is the council's own wording, with the papers it was decided on.

Item7

Resolved

The Cabinet Member noted the report which is for information only and is not subject to call-in.
Word for word from the decision Portsmouth published for this meeting. Source: democracy.portsmouth.gov.uk

Follow this further

Built from Portsmouth's papers

What the report saysPro

Report to Traffic & Transportation

THIS ITEM IS FOR INFORMATION ONLY (Please note that "Information Only" reports do not require Integrated Impact Assessments, Legal or Finance Comments as no decision is being taken)

Title of meeting: Traffic and Transportation Decision Meeting

Subject: Update on rapid electric vehicle (EV) charging infrastructure for taxis and private hire vehicles (PHVs)

Date of meeting: 18 March 2022

Report by: Tristan Samuels - Director of Regeneration

Report Author: Hayley Chivers, interim Transport Planning Manager

Wards affected: Charles Dickens, Cosham, Nelson, St. Jude

1. Requested by

1.1Update requested by the Cabinet Member for Traffic and Transportation following the decision made by the Cabinet on 2 November 2021 approving the recommendation to install rapid chargepoints at four sites in the city.

2. Purpose

2.1To provide an update on the proposal to install rapid electric vehicle (EV) charge points in various car parks and associated user tariffs for Stubbington Avenue car park.

3. Information Requested

3.1There are three fast charging facilities available across Portsmouth in council owned car parks (Isambard Kingdom Brunel Multi-storey, Seafront Esplanade and Park and Ride) and, there will be almost 100 residential on-street charge points once Phase 2 of the On-Street Residential Chargepoint Scheme (ORCS) has been completed.

3.2In March 2021 Portsmouth City Council were awarded £499,279 by the Joint Air Quality Unit (JAQU) for the installation of rapid chargers specifically for taxis and private hire vehicle use. This funding was awarded to enable the drivers of these vehicles to upgrade to electric vehicles as part of the Clean Air Zone scheme. Funding was granted following the successful amendment of taxi licencing policy to make all newly licenced vehicles from 1 January 2025 onwards 'zero emissions

1 www.portsmouth.gov.uk THIS ITEM IS FOR INFORMATION ONLY (Please note that "Information Only" reports do not require Integrated Impact Assessments, Legal or Finance Comments as no decision is being taken)

capable', and that a new restriction on the age that a vehicle can be licensed up to; in December 2020 this was set at eight years.

3.3Following this, transport planning and energy team colleagues have been working with Joju Limited (Joju) through the existing Hampshire Framework to undertake feasibility studies on Portsmouth City Council owned car parks, following approval of the proposed sites at Cabinet in October 2021. These feasibility studies have been attained through the Distribution Network Operator (DNO) who is Southern and Scottish Energy (SSE), who have provided quotes for works necessary to upgrade these sites to include capacity necessary for 50kWh (minimum) rapid chargers.

3.4Some sites have proven to be prohibitively expensive to install and it is preferable to install as many rapid chargers as the funding allows. The first viable site for the installation or a rapid charger has been identified as Stubbington Avenue car park (PO2 0HS) which was installed in February 2022.

3.5After considering Member and taxi trade feedback alongside the technical and financial feasibility, and existing car park situations, the remaining rapid chargers are planned to be installed at the following locations:

a. 3 chargepoints at the park and ride (Park and Ride Portsmouth, Tipner Lane, Portsmouth PO2 8AN) - installation due in Spring 2022 b. 3 chargepoints at D-Day car park (D-Day Car Park, Southsea, PO5 3NT) - installation expected in Summer 2022 c. 1 chargepoint at London Road (London Road Car Park, 10 London Road, Cosham, Portsmouth PO6 3EL) - installation expected in Summer 2022 d. 1 chargepoint at Isambard Brunel Road (Isambard Brunel Surface Car Park, Alec Rose Lane, Portsmouth PO1 2BX) - installation expected in Summer 2022

3.6An additional location at Isambard Brunel surface car park has been added following Cabinet approval to allow a wider spread of rapid chargers for the convenience of the taxi and private hire vehicles.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Update on rapid electric vehicle (EV) charging infrastructure for taxis and private hire vehicles (PHVs)Report 166 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

3 of 3 attended
LS
Councillor Lynne StaggCabinet Member, present
SB
Councillor Simon BosherOpposition spokesperson, present
GH
Councillor Graham HeaneyOpposition spokesperson, present

On this subject at Portsmouth

Search all
  1. Update on rapid electric vehicle (EV) charging infrastructure for taxis and private hire vehicles (PHVs)This decision
  2. Review of Stubbington Avenue Rapid Electric Vehicle (EV) Chargepoint for taxi and private hire vehiclesNoted
  3. Rapid Electric Vehicle Charging Infrastructure for Taxis and Private Hire Vehicles.Approved

More from Portsmouth Traffic & Transportation

All decisions
MeetingDecisionOutcome
23 Mar 2023 Local Transport Plan 4 - Implementation Plan 2022 to 2025 - Year 2 annual reviewDecision The Cabinet Member: Approved and adopted the Local Transport Plan (LTP4) funded schemes 2023/24 as part of P... Approved Open
23 Mar 2023 Tertiary Roads Inspection and RepairDecision The Cabinet Member: 1. Approved that the plans and timings of inspections of the tertiary road network are s... Approved Open
23 Mar 2023 Active Travel Improvements - TRO 206/2022 Isambard Brunel RoadDecision The Cabinet Member: 1. Approved the implementation of TRO 206/2022 for the introduction of the bus, taxi and... Approved Open
23 Mar 2023 TRO 24/2023 - Walmer Road, Renny Road and Proctor Lane - one way except cyclesDecision The Cabinet Member: 1. Approved the implementation of TRO 24/2023, to implement a series of one-way streets ... Approved Open
23 Mar 2023 St Jude's School Streets permanent infrastructureDecision The Cabinet Member: 1. Approved creating a School Street via the installation of resident only access signs ... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies