Resolved
The Cabinet Member noted the report which is for information only and is not subject to call-in.
Traffic & Transportation noted this item on Friday 18 March 2022. Below is the council's own wording, with the papers it was decided on.
Resolved
The Cabinet Member noted the report which is for information only and is not subject to call-in.
2.1The purpose of this report is to provide a summary of the proposed measures designed to improve the walking and cycling environment, for information purposes, as well as to share the public consultation feedback, and communicate the next steps to be taken up until construction, which is due to take place later this year.
2.2The South East Hampshire Rapid Transit (SEHRT) Walk 80 and Route 801, funded by the Transforming Cities Fund (TCF), and the East West Active Travel Corridor (EWATC) funded by Portsmouth’s Local Transport Plan (LTP), are being developed between Fratton and City Centre, to provide active travel benefits for pedestrians and cyclists along this key route.
2.3Proposed measures are intended to deliver a range of walking and cycling improvements including on and off-road cycle provision, improved crossing points and junction re-prioritisation, in line with the objective set out in LTP4.
2.4A meeting was held on the 9th of February 2022 to brief the Deputy Leader and Portfolio Holder for Traffic and Transport on the results of the consultation and agree and confirm the next steps (detailed design).
3. Background Information
3.1A range of possible walking and cycling improvement measures were considered and designed as part of these three schemes. A thorough analysis and design process was completed and included several site visits and observations, review of local incident data, internal consultation with PCC 1 www.portsmouth.gov.uk THIS ITEM IS FOR INFORMATION ONLY (Please note that "Information Only" reports do not require Integrated Impact Assessments, Legal or Finance Comments as no decision is being taken) officers, Ward Councillors and the Cabinet Transport Portfolio Holder, external consultation through public consultation and stakeholder engagement.
3.2Public consultation for each part of this walking and cycling network formed by SEHRT Walk 80 and Route 801 and EWATC Phase 2 and 3 was undertaken between December 5th 2021 and January 9th 2022.
3.3A presentation was publicised and used for the purposes of the consultation. This included live online briefings hosted by PCC's Communications team and the schemes' project managers which were subsequently made available to discuss the schemes further and respond to any questions from the public in attendance.
3.4The presentation slides used in these online briefings - which include an overview of the measures and locations being proposed across the schemes - are included as Appendix A.
3.5A report has been prepared which summarises all consultation survey results from the more than 700 responses received. This report confirms that all but one of the proposed locations and measures have received majority support (either 'strongly support' or 'somewhat support') from the public.
3.6The final public consultation survey results report is available on the 'Your City, Your Say' website and included as Appendix B.
Note that the one measure to not receive majority support, a loading bay on Goldsmith Avenue, had 33% of respondents neither supporting or opposition, and 25% opposition and will be subject to further assessment, and as with the schemes as a whole, and will be subject to TRO process, providing further opportunity for public consultation.
3.7As well as the public consultation events, A mixture of face to face and online engagement meetings were arranged with key stakeholders. A list of these meetings is included as Appendix C.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
SEHRT Cycling and Walking Consultation Presentation_2022Appendix A | 2.9 MB | Download |
PDF |
SEHRT Cycling and Walking Schemes in PortsmouthAppendix B | 3.7 MB | Download |
PDF |
SEHRT Cycling and Walking Engagement ListAppendix C | 81 KB | Download |
PDF |
EWATC and SEHRT Route 801 and Walk 80Report | 251 KB | DownloadRead as text |
Follow Traffic & Transportation at Portsmouth and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 23 Mar 2023 | Local Transport Plan 4 - Implementation Plan 2022 to 2025 - Year 2 annual reviewDecision The Cabinet Member: Approved and adopted the Local Transport Plan (LTP4) funded schemes 2023/24 as part of P... | Approved | Open |
| 23 Mar 2023 | Tertiary Roads Inspection and RepairDecision The Cabinet Member: 1. Approved that the plans and timings of inspections of the tertiary road network are s... | Approved | Open |
| 23 Mar 2023 | Active Travel Improvements - TRO 206/2022 Isambard Brunel RoadDecision The Cabinet Member: 1. Approved the implementation of TRO 206/2022 for the introduction of the bus, taxi and... | Approved | Open |
| 23 Mar 2023 | TRO 24/2023 - Walmer Road, Renny Road and Proctor Lane - one way except cyclesDecision The Cabinet Member: 1. Approved the implementation of TRO 24/2023, to implement a series of one-way streets ... | Approved | Open |
| 23 Mar 2023 | St Jude's School Streets permanent infrastructureDecision The Cabinet Member: 1. Approved creating a School Street via the installation of resident only access signs ... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.