That the application be granted subject to the imposition of the following condition(s): Time 1. The development must be begun not later than the expiration of three years beginning with the date of this permission. REASON: Required to be imposed by Section 51 of the Planning and Compulsory Purchase Act 2004. Plan 2. Unless explicitly required by condition within this consent, the development hereby permitted shall be carried out in complete accordance with the proposals as detailed on drawings: Proposed Plan and Elevations: Dwg no 482/204 Proposed Site Plan and Proposed Manure Store: Dwg no 482/205 Proposed Location Plan: Dwg no 482/206 REASON: For the avoidance of doubt and to clarify which plans are relevant to the consent. Materials 3 The external facing materials, detailed on the approved plans, shall be used and no others substituted. REASON: To ensure that the materials to be used are appropriate to the locality. Use 4. The building hereby permitted shall be used for agricultural purposes only (as defined in Section 336(1) of the Town and Country Planning Act 1990). REASON: To ensure that the building is used solely for agricultural purposes
Word for word from the decision Ribble Valley published for this meeting.Source: democracy.ribblevalley.gov.uk
FARM BUILDING FOR THE STORAGE OF MANURE AND ANIMAL BEDDING (PHASE 2) AT LAUND FARM, TWINS BROOK ROAD, CHIPPING
CONSULTEE RESPONSES/ REPRESENTATIONS MADE:
PARISH COUNCIL:
No comments received.
LCC HIGHWAYS:
No objections. ADDITIONAL REPRESENTATIONS:
None received.
1. Site Description and Surrounding Area
1.1The application site lies in the Forest of Bowland AONB within Chipping. The site is located within the centre of the applicants agricultural holding and is accessed off a private track that only serves the land and a residential property known as Knot Barn. At present the site is an agricultural field void of any structures.
1.2The total area of the holding owned by the applicant extends to 49 hectares with 140 hectares of rented land. The enterprise consists of 600 dairy sheep, 1200 ewes, 2470 other sheep, 50 beef cows and 45 other cattle.
2. Proposed Development for which consent is sought
2.1Consent is sought for the erection of a new building for the storage of manure and animal bedding. The proposed building would have a footprint of 24.3m x 19m. It would have a pitched roof measuring 5.4m at the eaves and 8.1m at the ridge. The building would be open on the east side and would be faced with vertical timber boarding with concrete panels below on the other two sides (the building is proposed to be attached to the building proposed as part of application 3/2020/0393) with a grey cement fibre roof.
2.2Consent was granted in 2002 for the erection of an agricultural building on the same site This consent is an extant consent therefore although the area is void of any structures at present this building could be erected.
3. Relevant Planning History
3/2020/0393- Replacement of approved farm building design size with a new farm building design and addition of a concrete yard area in front Phase 1. Recommended for approval elsewhere on this agenda
3/2002/0099 proposed conversion of barn into agricultural worker's dwelling with septic tank and erection of agricultural sheep building- Approved with Conditions
4. Relevant Policies
Ribble Valley Core Strategy Key Statement EN2 - Landscape Key Statement DS1 – Development Strategy Key Statement DS2 – Presumption in Favour of Sustainable Development Policy DMG1 – General Considerations Policy DMG2 – Strategic Considerations National Planning Policy Framework (NPPF)
5. Assessment of Proposed Development
5.1Principle of Development: 5.1.1 Outside the defined settlement areas development is required to meet one of six criteria contained within Core Strategy Policy DMG2. This includes development ‘needed for the purposes of forestry or agriculture’. The applicant farms 189 acres of land that surrounding the site and the location of the new building is within the centre of the holding and it will allow time when the weather is wet for the manure to be transported from the buildings at Laund farm to the store along the roads and tracks already in place and when the weather permits the manure is applied to the fields reducing travel time between the main farm holding and these fields.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.