CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Ribble Valley Borough Council
Planning and Development, Thursday 19 September 2024 at 6.30pm

3/2024/0372 - Ribble Valley Borough Council Offices Church Walk Clitheroe BB7 2RA

Approved Planning 1 paper

Planning and Development approved this item on Thursday 19 September 2024. Below is the council's own wording, with the papers it was decided on.

Item305b

Resolved

RESOLVED THAT COMMITTEE: APPROVE planning permission with the following conditions:- 1. The development hereby approved must be begun not later than the expiration of three years beginning with the date of this permission. REASON: Required to be imposed by Section 51 of the Planning and Compulsory Purchase Act 2004. 2. Unless explicitly required by condition within this consent, the development hereby permitted shall be carried out in complete accordance with the proposals as detailed on drawings: Proposed Plan: Sheet 2 Proposed Elevations: Sheet 4 Date: 12/09/24 Site Location Map: Sheet 5 Details DWG: Sheet 6 PV Module Dimensions REASON: For the avoidance of doubt and to clarify which plans are relevant to the consent hereby approved.
Word for word from the decision Ribble Valley published for this meeting. Source: democracy.ribblevalley.gov.uk

Follow this further

Built from Ribble Valley's papers

What the report saysPro

Report to Planning and Development

RECOMMENDATION FOR PLANNING AND DEVELOPMENT COMMITTEE

APPROVAL

DATE: 19 SEPTEMBER 2024 REF: SK CHECKED BY: LH

APPLICATION REF: 3/2024/0372

GRID REF: SD 374361 441971

DEVELOPMENT DESCRIPTION:

PROPOSED INSTALLATION OF 113 SOLAR PANELS TO SOUTH-WEST-FACING ROOF PITCH OVER THE MAIN PEDESTRIAN ENTRANCE, THE NORTH-WEST-FACING ROOF PITCH OVER THE UNDERGROUND CAR PARK AND THE SOUTH-EAST FACING ROOF PITCH FACING THE REAR GARDEN AREA. RIBBLE VALLEY BOROUGH COUNCIL OFFICES, CHURCH WALK, CLITHEROE BB7 2RA CONSULTEE RESPONSES/ REPRESENTATIONS MADE:

PARISH COUNCIL:

Clitheroe Town Council have raised no objections to the proposal.

ADDITIONAL REPRESENTATIONS:

One letter of representation has been received raising the following concerns:

• No cost benefit analysis has been undertaken • Queries in relation to the cost of proposed works • Queries in relation to the expected benefits and timescales for the benefits being achieved • Queries in relation to the lifespan of the proposed panels

1. Introduction

1.1Members will note that the application is being brought before Committee given the application is made on behalf of Ribble Valley Borough Council with the property to which the application relates also falling within the ownership of the authority.

2. Site Description and Surrounding Area

2.1The application relates to the Ribble Valley Borough Council Offices located on Church Walk, Clitheroe. The building is located within the designated Clitheroe Conservation Area, also being located within the Main Centre Boundary of the Settlement.

2.2The building is also located within and is considered to affect the setting of a number of Grade II listed building as follows:

• 3 and 5 Church Street (List Entry: 1072377) Grade II • 1 Church Street (List Entry: 1318126) Grade II • White Lion Hotel (List Entry: 1164091) Grade II • Mytton house and Number 13 (List Entry: 1072329) Grade II • 15 Church Street (List Entry: 1362178) Grade II

3. Proposed Development for which consent is sought

3.1The application seeks consent for the installation of 113 solar panels to be accommodated in mounted arrays on the northwest, southwest and southeast (inward facing) roof slopes of the Council Office building. The individual panels will measure approximately 1.75m by 1m, being mounted on a raised bracket system that will result in the panels being raised approximately 100mm above the existing roof surface.

4. Relevant Planning History

No recent planning history directly relevant to the determination of the application. 5. Relevant Policies

Ribble Valley Core Strategy

Key Statement DS1: Development Strategy Key Statement DS2: Sustainable Development Key Statement EN3: Sustainable Development and Climate Change Key Statement EN4: Biodiversity and Geodiversity Key Statement EN5: Heritage Assets

Policy DMG1: General Considerations Policy DMG2: Strategic Considerations Policy DME2: Landscape & Townscape Protection Policy DME3: Site and Species Protection and Conservation Policy DME4: Protecting Heritage Assets Policy DME5: Renewable Energy

Planning (Listed Buildings and Conservation Areas) Act National Planning Policy Framework (NPPF)

6. Assessment of Proposed Development

6.1Principle of Development:

6.1.1 The proposal seeks consent for the installation of solar renewable technologies upon an existing building. As such, consideration must be given in respect of the compatibility of the proposal with that of the climate change and energy consumption reduction aspirations within the borough as embodied within the currently adopted development strategy.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
3/2024/0372: Ribble Valley Borough Council Offices Church Walk Clitheroe BB7 2RAReport 360 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

14 of 22 attended
SB
Councillor Susan BibbyChair, present
A(
Councillor Anthony (Tony) AustinCommittee Member, present
IB
Councillor Ian BrownCommittee Member, present
SB
Councillor Stella Brunskill JPVice-Chair, present
MF
Councillor Mark FrenchCommittee Member, present
MH
Councillor Mark HindleCommittee Member, present
GH
Councillor Gaynor HibbertCommittee Member, present
SH
Councillor Simon HoreCommittee Member, present
KH
Councillor Kevin Horkin MBECommittee Member, present
LJ
Councillor Lee JamesonCommittee Member, apologies
MP
Councillor Malcolm PeplowCommittee Member, present
SO
Councillor Simon O'RourkeCommittee Member, present

All 22 on the meeting page

On this subject at Ribble Valley

Search all
  1. 3/2024/0372 - Ribble Valley Borough Council Offices Church Walk Clitheroe BB7 2RAThis decision
  2. Ribble Valley in BloomDecided
  3. Ribble Valley Shared Prosperity and Jubilee FundApproved
  4. Ribble Valley Shared Prosperity and Jubilee FundApproved
  5. Ribble Valley Shared Prosperity and Jubilee Fund (2025/26)Decided
  6. Ribble Valley in BloomDecided

More from Ribble Valley Planning and Development

All decisions
MeetingDecisionOutcome
27 Aug 2026 3/2025/0801 - Land to east of Salesbury View WilpshireRESOLVED THAT COMMITTEE: REFUSE PLANNING PERMISSION for the following reasons: 1. The proposed development would be o... Refused Open
27 Aug 2026 3/2022/0317 - Land at Higher Standen Farm and Part Littlemoor Farm ClitheroeRESOLVED THAT COMMITTEE: GRANT planning permission subject to the following condition(s): 1. Unless explicitly requir... Approved Open
27 Aug 2026 3/2026/0442 - Castle Museum Clitheroe Castle Castlegate Clitheroe BB7 1AZRESOLVED THAT COMMITTEE: GRANT planning permission subject to the following condition(s): The development hereby perm... Approved Open
27 Aug 2026 3/2025/0997 - Land off Henthorn Road Clitheroe BB7 3BYRESOLVED THAT COMMITTEE: Application deferred to enable an alternative access directly off Henthorn Road to serve the... Deferred Open
27 Aug 2026 3/2026/0230 - Land to the south of Ribblesdale Primary School west and north of Higher Standen DriveRESOLVED THAT COMMITTEE: DEFER AND DELEGATE to the Director of Economic Development and Planning for approval subject... Deferred Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies