RESOLVED THAT COMMITTEE: APPROVE planning permission with the following conditions:- 1. The development hereby approved must be begun not later than the expiration of three years beginning with the date of this permission. REASON: Required to be imposed by Section 51 of the Planning and Compulsory Purchase Act 2004. 2. Unless explicitly required by condition within this consent, the development hereby permitted shall be carried out in complete accordance with the proposals as detailed on drawings: Proposed Plan: Sheet 2 Proposed Elevations: Sheet 4 Date: 12/09/24 Site Location Map: Sheet 5 Details DWG: Sheet 6 PV Module Dimensions REASON: For the avoidance of doubt and to clarify which plans are relevant to the consent hereby approved.
Word for word from the decision Ribble Valley published for this meeting.Source: democracy.ribblevalley.gov.uk
RECOMMENDATION FOR PLANNING AND DEVELOPMENT COMMITTEE
APPROVAL
DATE: 19 SEPTEMBER 2024 REF: SK CHECKED BY: LH
APPLICATION REF: 3/2024/0372
GRID REF: SD 374361 441971
DEVELOPMENT DESCRIPTION:
PROPOSED INSTALLATION OF 113 SOLAR PANELS TO SOUTH-WEST-FACING ROOF PITCH OVER THE MAIN PEDESTRIAN ENTRANCE, THE NORTH-WEST-FACING ROOF PITCH OVER THE UNDERGROUND CAR PARK AND THE SOUTH-EAST FACING ROOF PITCH FACING THE REAR GARDEN AREA. RIBBLE VALLEY BOROUGH COUNCIL OFFICES, CHURCH WALK, CLITHEROE BB7 2RA CONSULTEE RESPONSES/ REPRESENTATIONS MADE:
PARISH COUNCIL:
Clitheroe Town Council have raised no objections to the proposal.
ADDITIONAL REPRESENTATIONS:
One letter of representation has been received raising the following concerns:
• No cost benefit analysis has been undertaken • Queries in relation to the cost of proposed works • Queries in relation to the expected benefits and timescales for the benefits being achieved • Queries in relation to the lifespan of the proposed panels
1. Introduction
1.1Members will note that the application is being brought before Committee given the application is made on behalf of Ribble Valley Borough Council with the property to which the application relates also falling within the ownership of the authority.
2. Site Description and Surrounding Area
2.1The application relates to the Ribble Valley Borough Council Offices located on Church Walk, Clitheroe. The building is located within the designated Clitheroe Conservation Area, also being located within the Main Centre Boundary of the Settlement.
2.2The building is also located within and is considered to affect the setting of a number of Grade II listed building as follows:
• 3 and 5 Church Street (List Entry: 1072377) Grade II • 1 Church Street (List Entry: 1318126) Grade II • White Lion Hotel (List Entry: 1164091) Grade II • Mytton house and Number 13 (List Entry: 1072329) Grade II • 15 Church Street (List Entry: 1362178) Grade II
3. Proposed Development for which consent is sought
3.1The application seeks consent for the installation of 113 solar panels to be accommodated in mounted arrays on the northwest, southwest and southeast (inward facing) roof slopes of the Council Office building. The individual panels will measure approximately 1.75m by 1m, being mounted on a raised bracket system that will result in the panels being raised approximately 100mm above the existing roof surface.
4. Relevant Planning History
No recent planning history directly relevant to the determination of the application. 5. Relevant Policies
Ribble Valley Core Strategy
Key Statement DS1: Development Strategy Key Statement DS2: Sustainable Development Key Statement EN3: Sustainable Development and Climate Change Key Statement EN4: Biodiversity and Geodiversity Key Statement EN5: Heritage Assets
Policy DMG1: General Considerations Policy DMG2: Strategic Considerations Policy DME2: Landscape & Townscape Protection Policy DME3: Site and Species Protection and Conservation Policy DME4: Protecting Heritage Assets Policy DME5: Renewable Energy
Planning (Listed Buildings and Conservation Areas) Act National Planning Policy Framework (NPPF)
6. Assessment of Proposed Development
6.1Principle of Development:
6.1.1 The proposal seeks consent for the installation of solar renewable technologies upon an existing building. As such, consideration must be given in respect of the compatibility of the proposal with that of the climate change and energy consumption reduction aspirations within the borough as embodied within the currently adopted development strategy.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.