RESOLVED THAT COMMITTEE: Application deferred for the following reason(s): To enable the Director of Economic Development and Planning to appoint a highways consultant to undertake an independent review of the impact of the development at the A671 Pimlico Link Road / A59 junction. To allow for further discussions on extending the proposed active travel route and the surfacing material and the works proposed at Chatburn Road roundabout.
Word for word from the decision Ribble Valley published for this meeting.Source: democracy.ribblevalley.gov.uk
RECOMMENDATION FOR PLANNING AND DEVELOPMENT COMMITTEE
APPROVAL
DATE: 24 JULY 2025 REF: LH
APPLICATION REF: 3/2025/0180
GRID REF: SD 376007 442427
DEVELOPMENT DESCRIPTION:
PROPOSED CREATION OF AN ALTERNATIVE TEMPORARY PARK AND RIDE AND HEAVY GOODS VEHICLE MARSHALLING AREA FACILITY ASSOCIATED WITH THE HAWESWATER AQUEDUCT RESILIENCE PROGRAMME (HARP) AT LAND TO THE WEST OF A671 PIMLICO LINK ROAD CONSULTEE RESPONSES/ REPRESENTATIONS MADE:
TOWN / PARISH COUNCIL:
The following Town and Parish Councils were consulted on 19th March 2025:-
Clitheroe Town Council Chatburn Parish Council Worston Parish Council Mearley Parish Council
No responses have been received.
LOCAL HIGHWAYS AUTHORITY (LCC HIGHWAYS):
Lancashire County Council acting as the Local Highway Authority (LHA) considers that the impacts of the proposals on the Local Highway Network are acceptable. However, this is subject to a number of matters being suitably secured and addressed by condition.
Moreover the LHA is satisfied that the location of the proposed alternative temporary P&R facility and HGV marshalling area is more suitable than the location of the currently consented area, based on the proximity to the A59 and distance from residential / built up areas. The alternative P&R facility and HGV marshalling area facility contributes to an overall mitigation strategy for the consented schemes which is to be implemented through the associated Construction Traffic Management Plan, to reduce the impact of the HARP Programme of Works on the highway network.
LCC ARCHAEOLOGY:
No objection subject to a condition to secure a programme of archaeological work.
LEAD LOCAL FLOOD AUTHORITY (LLFA):
No objection subject to drainage conditions being imposed.
ENVIRONMENT AGENCY:
No objection subject to a condition to protect the nearby watercourse.
UNITED UTILITIES (UU):
Standing advice provided about protection of UU assets, public sewers and drainage.
GREATER MANCHESTER ECOLOGY UNIT (GMEU):
No objection subject to conditions to secure landscape and ecology protection, mitigation and enhancement. Further detail requested about the provision of off-site biodiversity net gain (BNG).
NATURAL ENGLAND:
No response
ELECTRICITY NORTH WEST:
No response LCC MINERALS AND WASTE TEAM:
No response
LCC PUBLIC RIGHTS OF WAY TEAM:
No response
RVBC ENVIRONMENTAL HEALTH
Hours for the operation should be restricted as per the consented schemes.
RVBC ENGINEERS (CONTAMINATION)
No response
NEIGHBOUR RESPONSES:
10 individuals including 2 local councillors have submitted representations, raising the following concerns:-
• Pimlico link road junction with the A59 is already dangerous and very busy with frequent tailbacks and a number of road accidents. Additional traffic will make it even more dangerous, as well as the road junction into Worston. • Want to see speed calming measures in place on the A59 to slow down traffic as they approach the junction • There should be a roundabout / a second lane / slip road or traffic lights at the Pimlico link road / A59 junction. • Extra wagons will worsen the road surface • Needs to be a wider slip road entering / leaving the proposed site to maintain traffic flow • A footpath and cycle lane should be installed along Pimlico Link Road, including joining Pimlico Road to Chatburn Road, and the section of the A59 between Worston and the junction. This will improve safety for pedestrians and cyclists and allow site workers to access the site on foot. This is in line with the NPPF which requires that ‘opportunities to promote walking, cycling and public transport use are identified and pursued’ • Concern about impact on public footpath and proposed temporary closure • Concern about the extent of public consultation
In addition, 1 letter has been received sent in by 31 households reiterating the above highway safety concerns.
1. Introduction, Site Description and Surrounding Area
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.