Resolved
RESOLVED THAT COMMITTEE: Grant planning permission with the following condition(s): 1. The detached garage must be begun not later than the expiration of three years beginning with the date of this permission. REASON: Required to be imposed by Section 51 of the Planning and Compulsory Purchase Act 2004. 2. Unless explicitly required by condition within this consent, the development hereby permitted shall be carried out in complete accordance with the proposals as detailed on drawings: Location Plan (scale 1:1250) Amended Proposed Site Plan drawing ref: A1.2.1 Revision D (received 7 July 2025) Amended Proposed Elevations drawing ref: A2.2 Revision D (received 7 July 2025) Amended Proposed Floorplans drawing ref: A2.2.1 Revision D (received 7 July 2025) Amended Proposed Elevations drawing ref: A2.2.2 Revision D (received 7 July 2025) REASON: Reason: For the avoidance of doubt and to clarify which plans are relevant to the consent hereby approved. 3. Notwithstanding the submitted details/approved plans, prior to the commencement of development, details or specifications of all materials to be used on the external surfaces of the detached garage hereby approved shall be submitted to and approved in writing by the Local Planning Authority. REASON: In order that the Local Planning Authority may ensure that the materials to be used are appropriate to the locality and respond positively to the inherent character of the area in accordance with Key Statement EN2 and Policies DMG1, DMG2 and DMG5 of the Ribble Valley Core Strategy. 4. Within one month of the date of this permission, the approved ‘Jakoustic Absorptive Acoustic Fencing’ shall be installed adjacent to the Air Source Heat Pump in accordance with drawing ref: ‘A1.2.1 Revision D and A2.2 Revision D’ and shall thereafter be retained in perpetuity for the lifetime of the development. REASON: To ensure the noise levels resulting from the installed Air Source Heat Pump are satisfactory, in accordance with Policy DMG1 of the Ribble Valley Core Strategy. 5. No development shall take place, including any works of demolition or site clearance, until a Construction Management Plan (CMP) or Construction Method Statement (CMS) has been submitted to, and approved in writing by the local planning authority. The approved plan / statement shall provide: - 24 Hour emergency contact number. - Details of the parking of vehicles of site operatives and visitors. - Details of loading and unloading of plant and materials. - Arrangements for turning of vehicles within the site. - Measures to protect vulnerable road users (pedestrians and cyclists). - Wheel washing facilities. - Measures to deal with dirt, debris, mud, or loose material deposited on the highway because of construction. - Measures to control the emission of dust ... view the full minutes text for item 157e